Download presentation
Presentation is loading. Please wait.
Published byShannon Tumbleson Modified over 9 years ago
1
DYNAMO presentation slide 1 DYNAMO Dynamic Carpooling Service for people on the move Eurostars project reference: E! 5093 Project Overview Polivios RAXIS
2
DYNAMO presentation slide 2 Project facts Program: Eurostars 3 rd cut-off Reference: E! 5093 Acronym: DYNAMO Full title: Dynamic Carpooling Service for people on the move Budget: 800K Euro National funding: 400K Euro Countries participating: Greece, Romania
3
DYNAMO presentation slide 3 The Consortium ATLANTIS Consulting SA. –Coordinator (Greece) –Expert in project management and online service provision Integral Consulting R&D –Participant (Romania) –Expert in transportation telematics and GIS University of Patras / Civil Engineering dept. –Subcontractor of ATLANTIS (Greece) –Expert in the transport domain (policies, services)
4
DYNAMO presentation slide 4 Project goals Study –User “ wants ”, “ needs ” and “ concerns / barriers ” –Best practices for deploying the service and overcoming barriers Develop –An online service that meets user expectations and circumvents non-technical barriers Establish –A sustainable Business Model for the commercial deployment of a car pooling service
5
DYNAMO presentation slide 5 Project main objectives Collect and analyze user feedback, identify NTBs and best practices Design and implement the service –Spatial infrastructure, routing and (offer/demand) matching –WEB and mobile service Verify the integrated system and deploy at (min) 2 test sites Evaluate the service (technical, user acceptance) Produce an effective Business Plan
6
DYNAMO presentation slide 6 Target market / groups Commuters who make regular urban and/or interurban trips Adults who make discretionary trips (shopping, entertainment, etc.) Citizens with low income and no vehicle ownership –Students / younger generation –Unemployed
7
DYNAMO presentation slide 7 Main tangible / exploitable result (apart from the reports) WEB service allowing users to define and offer or request trips for sharing WEB and mobile interface to define start / end and intermediate trip nodes, based on predefined landmarks Offer of a 3 + 1 (strangers) Level familiarity filter 1.Preferred users 2.Associated users (i.e. positive past experience or preferred users of own preferred users) 3.Members of a common affiliation or mini-pool (colleagues) Matching based on rules (in order of hierarchy) 1.a) Full route, b) partial route / conjunction with Public Transport 2.a) 4-Levels familiarity filter, b) Preferences (users aged 25-30) On acceptance of a shared ride, participants notified through E-mail/SMS
8
DYNAMO presentation slide 8 Project Timeplan
9
DYNAMO presentation slide 9 Project Work-Packages (1/2) WP2 User Requirements & NTBs (Inteco) –Setting-up of User Group(s) –Analysis of user requirements –Identification of NTBs and best practices to overcome them WP3 Service Design (ATL) –Use case scenarios, specs, architecture –Design of the service WEB site & of the mobile application WP4: Development of Spatial Capabilities (Inteco) –Implementation of Map & Routing servers –Development of (complete/partial) route matching –Development of map / route display interfaces
10
DYNAMO presentation slide 10 Project Work-Packages (2/2) WP5 Service Implementation (ATL) –Development of WEB and Mobile service UI –Development of Business Processes –Integration of service components WP6 Service Deployment and Verification (ATL) –Deployment and verification at test sites –Service improvements, based on findings WP7 Service Validation and User Appraisal (Inteco) –Technical & User Acceptance Evaluation WP8 Dissemination / Exploitation (ATL) –Planning, promotion material, events, commercialisation agreement
11
DYNAMO presentation slide 11 Project Deliverables (1/2) Deliverable Month due StatusPartners D1.1: Project internal mailing listM1 Jul 2010 Finished ATL D1.2: Guidelines for reportingM2 Aug 2010 Finished ATL D1.3: Project Meetings (agenda, list of participants and minutes) Ad hockATL (Inteco) D1.4: Progress Reports (every 6 months) Spring, autumn ongoing ATL (Inteco) D2.1: Report on User Requirements and NTBs M8 Feb 2011 ongoing Inteco (ATL) D3.1: Report on use case scenarios & functional specs M10 April 2011 - ATL (Inteco) D3.2: Service Architecture and Design M13 July 2011 - Inteco (ATL) D3.3: Verification PlanM13 July 2011 - ATL
12
DYNAMO presentation slide 12 Project Deliverables (2/2) DeliverableMonth due Stat Partners D4.1: Spatial prototype M20 Feb 2012 - Inteco D5.1: Integration Discipline M17 Nov 2011 - ATL D5.2: Prototype ready for deployment M20 Feb 2012 - ATL (Inteco) D6.1: The deployed and verified service for the test site M23 May 2012 - ATL (Inteco) D6.2: Verification testing results document M24 June 2012 - ATL (Inteco) D7.1: Evaluation Framework M26 Aug 2012 - Inteco (ATL) D7.2: Consolidated report on evaluation M30 Dec 2012 - Inteco (ATL) D8.1: Dissemination Plan M12 June 2011 - ATL (Inteco) D8.2: Project Website M4 Oct 2010 ongoin g ATL (Inteco) D8.3: Project identity & promotion (leaflet, presentation, brochure) M15 Sept 2011 - ATL (Inteco) D8.4:Commercialization Agreement M24 June 2012 - ATL (Inteco)
13
DYNAMO presentation slide 13 M1-M13 Deliverables DeliverableMonth dueStatusPartners D1.1: Project internal mailing listM1 Jul 2010 Finished ATL D1.2: Guidelines for reportingM2 Aug 2010 Finished ATL D1.4: Progress Reports (every 6 months) Spring, autumn ongoing ATL (Inteco) D2.1: Report on User Requirements and NTBs M8 Feb 2011 ongoing Inteco (ATL) D3.1: Report on use case scenarios & functional specs M10 April 2011 - ATL (Inteco) D3.2: Service Architecture and Design M13 July 2011 - Inteco (ATL) D3.3: Verification PlanM13 July 2011 - ATL D8.1: Dissemination PlanM12 June 2011 - ATL (Inteco) D8.2: Project WebsiteM4 Oct 2010 ongoing ATL (Inteco)
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.