Download presentation
Presentation is loading. Please wait.
Published byAmir Yarnall Modified over 9 years ago
1
District 3
2
District Engineer (Dan Anderson) ADE – Construction (Cal Puttbrese) Project Manager (Kevin Schmidt) ADE – Program Delivery (Terry Humbert) Project Manager (Jim Hallgren) Project Manager (Claudia Dumont) Project Manager (Matt Indihar) Project Manager (Vacant) District 3 Org Chart Consultant Coordinator (Bob Nibbe)
3
Contract administration (both complete services and “rent-a-tech”) Noise studies Traffic modeling Highway interchange layouts Miscellaneous right of way assistance GEC for Design/Build Design and construction oversight for Design/Build contract Historic site restoration
4
Contract Administration Miscellaneous right of way assistance Signing designs Transition to consultant roadway design Wetland delineations Workload peaks
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.