Download presentation
Presentation is loading. Please wait.
Published byCarl Gadd Modified over 9 years ago
1
ING.GALLARATI - via dei Marinoni 68/70 - 27040 CIGOGNOLA PV - ITALY
ATI G&G IMPIANTI INCINERATORS BRANCH ROTATING INCINERATORS SERIES ROT FOR WASTE TO ENERGY APPLICATIONS Possible applications with: MUNICIPAL WASTE (MW) RDF (Refuse Derived Fuels) WOODEN and ORGANIC CHIPS INDUSTRIAL AND PLASTIC WASTES OR FLUFF HOSPITAL WASTES Continuous loading by means of a feeder conveyor with loading hopper and ram loading machine / ash continuous discharge For more details please contact our office ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA tel.: / e.mail.:
2
ING.GALLARATI - via dei Marinoni 68/70 - 27040 CIGOGNOLA PV - ITALY
ATI G&G IMPIANTI INCINERATORS BRANCH ROTATING INCINERATOR KILNS SERIES ROT ADAPTED FOR BIG WASTE TO ENERGY APPLICATIONS ROT furnace technology offers many advantages: Complete incineration Complete ash inertizing Minimum ash quantity Great loading flexibility Precise combustion control Continuous service Low working costs Very high economic profit Long duration of plant The ROT furnace basic plant is normally coupled to a dry super depuration plant with very low emissions (NZEP plants) ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA tel.: / e.mail.:
3
ING.GALLARATI - via dei Marinoni 68/70 - 27040 CIGOGNOLA PV - ITALY
ATI G&G IMPIANTI INCINERATORS BRANCH FLUE GAS DRY SUPER DEPURATION PLANTS AT CEE NORMS PREVISION 2012 (NEAR TO ZERO EMISSIONS PLANTS) ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA tel.: / e.mail.:
4
ATI G&G IMPIANTI INCINERATORS BRANCH ROTATING INCINERATORS SERIES ROT FOR WASTE TO ENERGY APPLICATIONS ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA
5
ING.GALLARATI - via dei Marinoni 68/70 - 27040 CIGOGNOLA PV - ITALY
ATI G&G IMPIANTI INCINERATORS BRANCH FLUE GAS CLEANING PLANTS (NEAR TO ZERO EMISSION PLANTS) NZEP plant lay out with n.4 rotating counter current furnaces ROT150, n.4 HP boilers and n.4 steam turbines for 8 Mw el. each – capacity MTPY (metric tons per year) ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA tel.: / e.mail.:
6
ING.GALLARATI - via dei Marinoni 68/70 - 27040 CIGOGNOLA PV - ITALY
ATI G&G IMPIANTI INCINERATORS BRANCH FLUE GAS CLEANING PLANTS AT CEE NORMS WITH NEAR TO ZERO EMISSIONS ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA tel.: / e.mail.:
7
ATI G&G IMPIANTI INCINERATORS BRANCH OPERATIVE STRUCTURE
ING.GALLARATI - via dei Marinoni 68/ CIGOGNOLA PV - ITALY ATI G&G IMPIANTI INCINERATORS BRANCH OPERATIVE STRUCTURE ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA tel.: / e.mail.:
8
ATI G&G IMPIANTI INCINERATORS BRANCH INCINERATORS ENGINEERING AND PRODUCTION
DWG trade-mark ®: Contact information: G.&G.IMPIANTI SAS di Ing.Gallarati C.&C. Local workshop: via dei Marinoni 43 CAP CIGOGNOLA PV - ITALIA tel. & fax.: .: Find further information on web sites : ING.GALLARATI Workshop: via dei Marinoni CIGOGNOLA PV - ITALIA
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.