Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including.

Similar presentations


Presentation on theme: "Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including."— Presentation transcript:

1 Transmission Operator Protection System Misoperations 2014 ERCOT Transmission Protections System Misoperations Data – 138kV and 345kV Combined (Not including Failure to Reclose) NOTE: Includes only transmission system protection system misoperations from 1/1/2011 thru 6/30/2014 reported by Transmission Operators

2 Value # of MisoperationsTotal48 345 kV17 138 kV29 < 100 kV2 By CategoryFailure to Trip1 Slow Trip0 Unnecessary Trip during Fault25 Unnecessary Trip – Non Fault22 SPS0 By Relay System Type Electromechanical41 Solid State1 Microprocessor4 Other/ N/A2 By Equipment Protected Line33 Transformer2 Generator3 Shunt/Series Capacitor1 Shunt/Series Reactor4 Dynamic VAR system0 Bus3 Breaker2 Protection System Misoperations 2014 Q2

3 Summary of Human Performance Issues noted for 2014 Q2: -138 kV line overtrip during substation re-configuration project. New relay settings were installed on the line terminal but the carrier frequency was not changed to reflect the new substation configuration. -138 kV line overtrip occurred with MDAR relay set to zero polarization on one terminal and SEL321 with negative sequence polarization on the other terminal. -Multiple 345 kV lines overtripped due to a failed CT on a short line between a substation and a generation plant. Remote line terminals tripped due to miscoordination between the backup ground relays and the remote bus ground backup directional overcurrent relays. -Misoperation of 345 kV auto due to wind blowing the cabinet door, causing the SPR auxiliary relay to vibrate and trip. -138 kV line overtrip due to incorrect line length in Aspen model. -138 kV bus differential failed to trip for a fault due to incorrect wiring from the CTs to the relay. Protection System Misoperations 2014 Q2

4 Protection System “Human Performance” Trends “Human” performance misoperations defined as the percentage of misoperation each quarter caused by incorrect settings, incorrect design, logic errors, and as-left personnel errors.

5 Protection System Corrective Action Trends