Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 IEEE 802.16m-09/0019r2 2010-01-11 Work Plan for IEEE 802.16m Standard & IMT-Advanced Submission.

Similar presentations


Presentation on theme: "1 IEEE 802.16m-09/0019r2 2010-01-11 Work Plan for IEEE 802.16m Standard & IMT-Advanced Submission."— Presentation transcript:

1 1 IEEE 802.16m-09/0019r2 2010-01-11 Work Plan for IEEE 802.16m Standard & IMT-Advanced Submission

2 2 Documents to be Developed in TGm TGm will develop the following documents as part of 802.16m standardization process: –System Requirements Document (SRD) A set of possible deployment scenarios and applications of the 802.16m standard. A set of performance targets and features that 802.16m compliantsystems shall meet or exceed. –Evaluation Methodology Document (EMD) A complete set of parameters, models, and methodologies for the link-level and system-level simulations that allow fair evaluation/comparison of various technical proposals. Channels Models: A set of spatial channel model parameters are specified to characterize particular features of MIMO radio channels to be used for simulating technical proposals for the future 802.16m standard. –System Description Document (SDD) Architecture and design of the 802.16m air interface amendment Captures the core technical concepts behind the features included in the amendment Will enable analysis and/or simulations for characterizing the coarse level performance benefits of the air interface in association with the Evaluation Methodology Document –802.16m amendment –802.16 IMT-Advanced Proposal

3 TGm Timelines IEEE 802.16m 802.16m Amendment IMT Advanced Proposal System Description System Requirements Evaluation Methodology ITU-R IMT Advanced IMT.TECH IMT.EVAL IMT.RSPEC Circular Letter *System Requirements and Evaluation Methodology, System Description, IMT-Advanced Proposal Documents may be further updated based on ITU output (shown by dotted lines). IEEE 802.16 ITU-R WP5D Sep ’07* Jan’08* Jan 09* Letter Ballot Sponsor Ballot Mar’10Nov ’08 Nov ’07 Jan ’09 Jun ’08 Oct ’08 Proposal Submission Jan’09 Jun ’08 Proposal Evaluation Develop Recommendation Q2Q3Q4Q1Q2Q3Q4 2007 2008 2009 Q1Q2Q3Q4 Apr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov DecJan Feb MarApr May JunJul Aug SepOct Nov Dec Q1Q2Q3Q4 2010 Oct ’09 Jun ’10 Final Proposal Sept ’09* ITU based potential updates Refinements AprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDec July ’10 ITU based Updates Amendment Ready for IMT- Adv evaluation July ’09 Working Doc Amendment Feature Complete. EC Conditional Approval for SB. Amendment Ready for Industry Release. RevCom submission EC Conditional Approval for RevCom submission Jan Feb Mar Q1 2011 Feb ’11JanFebMar Consensus Building & Decision Oct ’10 3


Download ppt "1 IEEE 802.16m-09/0019r2 2010-01-11 Work Plan for IEEE 802.16m Standard & IMT-Advanced Submission."

Similar presentations


Ads by Google