OmegaPS Analyzer New Functionality in Release R4.4 OUGM 2013 Graham Brum
2
Major Functions Added Scheduled Maintenance Tasks QTT at LOM1 and OnPE SRSF Months Per Year hierarchy XML Data Files Single Item Spares – Multi-Item Extended “Cost Per” Report Initial Buy Report OUGM 2013 - Graham BrumSlide2
3
Scheduled Maintenance Add task details for Calendar based tasks Operational Unit based tasks Operational demands for Scheduled spares replacement OUGM 2013 - Graham BrumSlide3
4
SM R&O can be done at any LOM On-PE tasks are used to “Inspect” the PE - CBM Scheduled (Calendar) Scheduled (Operational) The LRU is R/R at On-PE when condition is met The removed LRU can be sent to any LOM for repair, R&O OUGM 2013 - Graham BrumSlide4
5
Model for SM Total SM Mean Hours per Month = MHRSM(Op) + MHRSM(Cal) MHRSM(Op) = Tasks per Month * Mean Task Time ((TOHM(PE)/MTBSM(Op)) * DC * QinPE) * MTSM(Op) MHRSM(Cal) = Monthly Hours PE * QPE (MTSM * PETPM* QinPE) * QPE PETPM based on MTBSM MB (e.g. Weeks = 4) OUGM 2013 - Graham BrumSlide5
6
OUGM 2013 - Graham BrumSlide6
7
Quantity of Techs Trained assigned to: LOM1, or On PE at First Line sites Uses Labour Rates as defined for each level OUGM 2013 - Graham BrumSlide7
8
SRSF Site Reliability Stress Factor Released in R4.3.2 Allows for Reliability (MTBF) adjustment for: a Part at a Site Multiplier adjustment to MTBF when demands are generated a that specified site for the associated part OUGM 2013 - Graham BrumSlide8
9
OUGM 2013 - Graham BrumSlide9 Select SRSF button Opens form Set SRSF to adjust MTBR for an item at a site
10
Months Per Year Hierarchy Months per year operating for PE is limited to only operating sites Can be assigned at three levels: Operating months for the PE Operating months for the Site Default value for all PE/Sites Model uses the ‘best’ value from Default, Site, PE OUGM 2013 - Graham BrumSlide10
11
XML Transfer Files Data Files: costs; echelon; structure; stock; STE Result Files: results; labour; spares; log Project Transfer File: Every data element in the project Used for transfers between Analyzer and OSAM models. OUGM 2013 - Graham BrumSlide11
12
Example Results.xml Results.xml viewed using XML Notepad 2007 from Microsoft OUGM 2013 - Graham BrumSlide12
13
Multi selection of Single Item Sparing runs OUGM 2013 - Graham BrumSlide13 Select one or many items to include Sort by clicking column headers Select method for Target Availability. Manual displays graph for each item
14
Extended “cost-per” LCC reports A cost breakdown report by Part in the configuration Can select the ‘denominator’ LCC Per PE Per Operating Unit Per Failure Others can be added in the future Suggestions……? OUGM 2013 - Graham BrumSlide14
15
Initial Buy Sparing report OUGM 2013 - Graham BrumSlide15
16
Future Development ASOAR -> APAU -> DATM Design Availability Target Model MHLH -> ADES -> TLAS Through Life Availability Simulation LORA2 Linear Programming research Extended Task Modelling Business Case Analysis LCC/TLC Cost Breakdown Structures OUGM 2013 - Graham BrumSlide16