1 OmegaPS Analyzer New Functionality in Release R4.4 OUGM 2013 Graham Brum

2 Major Functions Added  Scheduled Maintenance Tasks  QTT at LOM1 and OnPE  SRSF  Months Per Year hierarchy  XML Data Files  Single Item Spares – Multi-Item  Extended “Cost Per” Report  Initial Buy Report OUGM 2013 - Graham BrumSlide2

3 Scheduled Maintenance  Add task details for  Calendar based tasks  Operational Unit based tasks  Operational demands for Scheduled spares replacement OUGM 2013 - Graham BrumSlide3

4 SM R&O can be done at any LOM  On-PE tasks are used to “Inspect” the PE - CBM  Scheduled (Calendar)  Scheduled (Operational)  The LRU is R/R at On-PE when condition is met  The removed LRU can be sent to any LOM for repair, R&O OUGM 2013 - Graham BrumSlide4

5 Model for SM  Total SM Mean Hours per Month = MHRSM(Op) + MHRSM(Cal)  MHRSM(Op) = Tasks per Month * Mean Task Time ((TOHM(PE)/MTBSM(Op)) * DC * QinPE) * MTSM(Op)  MHRSM(Cal) = Monthly Hours PE * QPE (MTSM * PETPM* QinPE) * QPE PETPM based on MTBSM MB (e.g. Weeks = 4) OUGM 2013 - Graham BrumSlide5

6 OUGM 2013 - Graham BrumSlide6

7 Quantity of Techs Trained  assigned to:  LOM1, or  On PE at First Line sites  Uses Labour Rates as defined for each level OUGM 2013 - Graham BrumSlide7

8 SRSF  Site Reliability Stress Factor  Released in R4.3.2  Allows for Reliability (MTBF) adjustment for:  a Part  at a Site  Multiplier adjustment to MTBF when demands are generated a that specified site for the associated part OUGM 2013 - Graham BrumSlide8

9 OUGM 2013 - Graham BrumSlide9 Select SRSF button Opens form Set SRSF to adjust MTBR for an item at a site

10 Months Per Year Hierarchy  Months per year operating for PE is limited to only operating sites  Can be assigned at three levels:  Operating months for the PE  Operating months for the Site  Default value for all PE/Sites  Model uses the ‘best’ value from Default, Site, PE OUGM 2013 - Graham BrumSlide10

11 XML Transfer Files  Data Files:  costs; echelon; structure; stock; STE  Result Files:  results; labour; spares; log  Project Transfer File:  Every data element in the project  Used for transfers between Analyzer and OSAM models. OUGM 2013 - Graham BrumSlide11

12 Example Results.xml Results.xml viewed using XML Notepad 2007 from Microsoft OUGM 2013 - Graham BrumSlide12

13 Multi selection of Single Item Sparing runs OUGM 2013 - Graham BrumSlide13 Select one or many items to include Sort by clicking column headers Select method for Target Availability. Manual displays graph for each item

14 Extended “cost-per” LCC reports  A cost breakdown report by Part in the configuration  Can select the ‘denominator’  LCC  Per PE  Per Operating Unit  Per Failure  Others can be added in the future  Suggestions……? OUGM 2013 - Graham BrumSlide14

15 Initial Buy Sparing report OUGM 2013 - Graham BrumSlide15

16 Future Development  ASOAR -> APAU -> DATM  Design Availability Target Model  MHLH -> ADES -> TLAS  Through Life Availability Simulation  LORA2 Linear Programming research  Extended Task Modelling  Business Case Analysis LCC/TLC Cost Breakdown Structures OUGM 2013 - Graham BrumSlide16