Download presentation
Presentation is loading. Please wait.
Published byKaitlynn Smither Modified over 9 years ago
1
ESKADRILLE 690 - AIREVAC
2
SQN690 AIREVAC
3
ESKADRILLE 690 - AIREVAC Agenda SQN 690 Danish AIREVAC – education Danish AIREVAC – operations Danish AIREVAC – the structures Equipment
4
ESKADRILLE 690 - AIREVAC SQN690 AIREVAC Organisation Full time: 1 Surgeon Commander – SQN Commander 1 Surgeon Commander – Second in command 1 Leader AECC 1 Leader CSU 2 Flight Medics Reserve personnel: 13 Flight Surgeons / Flight Medical Officers / Surgeons 14 Flight Nurses 18 Flight Medics
5
ESKADRILLE 690 - AIREVAC Agenda SQN 690 Danish AIREVAC - EDUCATION Danish AIREVAC – operations Danish AIREVAC – the structures Equipment
6
ESKADRILLE 690 - AIREVAC Educational background Basic military training Flight surgeons –At least 2 years of specialist training for anesthesia and intensive care Flight nurses –Specialists in anesthesia nursing or intensive care nursing Flight medics –Paramedics
7
ESKADRILLE 690 - AIREVAC Training objectives To utilize and integrate existing knowledge and skills to perform in an unfamiliar environment with potential unfamiliar stressors.
8
ESKADRILLE 690 - AIREVAC Training objectives To utilize and integrate existing knowledge and skills to perform in an unfamiliar environment with potential unfamiliar stressors. To corporate across professional and national boarders
9
ESKADRILLE 690 - AIREVAC Training objectives
10
ESKADRILLE 690 - AIREVAC Training objectives
11
ESKADRILLE 690 - AIREVAC Training objectives
12
ESKADRILLE 690 - AIREVAC Training objectives
13
ESKADRILLE 690 - AIREVAC Training objectives
14
ESKADRILLE 690 - AIREVAC Training objectives
15
ESKADRILLE 690 - AIREVAC Training objectives
16
ESKADRILLE 690 - AIREVAC Training objectives
17
ESKADRILLE 690 - AIREVAC Training objectives
18
ESKADRILLE 690 - AIREVAC Agenda SQN 690 Danish AIREVAC – education Danish AIREVAC – operations Danish AIREVAC – the structures Equipment
19
ESKADRILLE 690 - AIREVAC AFGHANISTAN Helmand Province R3 Field Hospital Kandahar Camp Bastion Brize Norton Birmingham Ramstein AECC responcibility EUROPE Evacuation ex. Afghanistan Forward AE Kabul Civ R4
20
ESKADRILLE 690 - AIREVAC Forward AirEvac
21
ESKADRILLE 690 - AIREVAC Camp Bastion
22
ESKADRILLE 690 - AIREVAC RAF or USAF
23
ESKADRILLE 690 - AIREVAC ROYAL AIR FORCE C-17
24
ESKADRILLE 690 - AIREVAC Birmingham
25
ESKADRILLE 690 - AIREVAC Hercules C-130J
26
ESKADRILLE 690 - AIREVAC Challenger CL-604
27
ESKADRILLE 690 - AIREVAC R2LM AECC responcibility DENMARK Evacuation “short range” with Casualty Staging Unit (CSU) Forward AE TAOR CSU Civ R4
28
ESKADRILLE 690 - AIREVAC AECC responcibility Iceland Arctic disaster evacuation with Casualty Staging Unit (CSU) Forward Team Triage Greenland CSU+ Civ R3/R4 Cruise Ship Landing strip FW AE Forward AE RW AE
29
ESKADRILLE 690 - AIREVAC Arctic disaster relief (exercise SAREX Greenland Sea 2012)
30
ESKADRILLE 690 - AIREVAC Civil evacuation – Libya 2011
31
ESKADRILLE 690 - AIREVAC AIREVAC operations: Total: 359 evacuations
32
ESKADRILLE 690 - AIREVAC Agenda SQN 690 Danish AIREVAC – education Danish AIREVAC – operations Danish AIREVAC – the structures Equipment
33
ESKADRILLE 690 - AIREVAC Classical AIREVAC structure: SMO DETCO Chief Surgeon On duty Operative Command (HOK/SOK/FTK) Contact officer on duty (coordinating) Contact Officer Unit AECC AECO AE Team CCATT Contact Surgeon
34
ESKADRILLE 690 - AIREVAC AIREVAC-REQUEST Chief Surgeon On duty TACDEN Duty Officer AECC FLIGHT OPS. MEDICAL SQN 721 Ambulance Service ? Police Civil hospital MISSION SMO / DETCO MEDICAL AIRCREW MEDICAL AIRCREW MEDICAL CREW Tactical Command Duty Officer FAMILY UNIT
35
ESKADRILLE 690 - AIREVAC Gather initial medical information (MEDREP) Advice on medical aspects with regard to evacuation (fit for flight) Determine flight configuration Determine necessary medical capability for evacuation Staffing of CCATT Coordinate evacuation with tactical commands Coordinate evacuation with partnering AECC Arrange for transportation of patient from APOE to civil hospital Coordinate with and inform civil hospital Inform all other relevant entities (contact officers, Danish armed forces health service etc.) AECC/AECO tasks
36
ESKADRILLE 690 - AIREVAC AECC considerations Type of aircraft (C-130J or CL-604) Flight time Altitude Landing facilities Weather issues en-route Transportation options (APOD - hospital), escort etc.
37
ESKADRILLE 690 - AIREVAC Agenda SQN 690 Danish AIREVAC – education Danish AIREVAC – operations Danish AIREVAC – the structures Equipment
38
ESKADRILLE 690 - AIREVAC Hercules C-130J
39
ESKADRILLE 690 - AIREVAC CAF/USAF Hercules C-130H
40
ESKADRILLE 690 - AIREVAC Wartime configuration: –Up to 97 stretchers... Peacetime configuration: –2 ambulances or.. –2 AE-modules or.. –1 AE-module and 1 ambulance or.. –In combination with stretchers C130J Hercules
41
ESKADRILLE 690 - AIREVAC C-130J Intensive Care AE Module (A+B)
42
ESKADRILLE 690 - AIREVAC Intensive care set up
43
ESKADRILLE 690 - AIREVAC Intensive care set up
44
ESKADRILLE 690 - AIREVAC C-130J Intensive Care AE Module Advantages: Climate Vibrations / noise Supply (ox+220v) Std. stretchers Good working conditions Contamination of plane…
45
ESKADRILLE 690 - AIREVAC VW transporter synchro / MB Sprinter Intensive Care ambulances Currently 2+1 Door to door transportation Power supply 220 V AC + 12 V DC Air condition Noise/vibration C-130J Intensive Care Ambulance
46
ESKADRILLE 690 - AIREVAC Challenger CL-604
47
ESKADRILLE 690 - AIREVAC Challenger CL-604
48
ESKADRILLE 690 - AIREVAC Challenger CL-604
49
ESKADRILLE 690 - AIREVAC Challenger CL-604
50
ESKADRILLE 690 - AIREVAC SQN 690 (AIREVAC) Mission accomplished – every time…!
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.