Download presentation
Presentation is loading. Please wait.
Published byJaelyn Colter Modified over 9 years ago
1
SHS Preparations – Division of Rizal
2
How do you envision SHS being implemented in your area? The Division of Rizal envisions a SHS implementation with: All municipalities will offer the three SHS tracks covering the identified SHS students in the area. Stand-alone SHS will be established to municipalities with secondary schools with no buildable space. SHS have adequate number of teachers who are NC holders to handle tech-voc subjects and who are MA degree holders to handle academic subjects. Classrooms are enough for the SHS classes with possibilities of night and Saturday sessions. The essential facilities and equipment subscribe to set standards.
3
SHS Preparations – Division of Rizal STEP 1 – External Assessment: Local Government and District Representatives Methodology: Consultative meetings, Representations to municipal councils and congressmen, Document reviews Summary of Initial Results: The development in urban areas (Cainta, Taytay, San Mateo, Rodriguez) are gearing towards heavy to medium industries (manufacturing, ICT-related, etc.) In rural areas (the rest of municipalities), the development in rural areas is highly in agriculture and commercial. The local officials can support on the provision of facilities for SHS courses. They can also help in negotiating with local industries for the apprenticeship program. The LGUs are aware of their critical role to the successful SHS implementation in SY 2016-2017.
4
SHS Preparations – Division of Rizal STEP 2 – External Assessment: Industry and Private Sector Methodology: Some conducted small meetings while others were reached separate occasions. Both key and small players of the municipality-based industries were reached by the SHS Municipal Teams. Summary of Initial Results: Based on these consultations, the industries require clear terms of reference so they can further study the possible partnerships and identify terms and conditions. The skills required by the industries vary in each municipality.
5
SHS Preparations – Division of Rizal Number of Institutions/Organizations by Municipality TOTAL = 361
6
SHS Preparations – Division of Rizal STEP 3 – External Assessment: Local Counterparts in Agencies Methodology: Representations to local agencies were conducted. Summary of Initial Results: The local agencies of DTI, DOT, DOLE, DA and TESDA are prepared and willing to provide technical assistance to tech-voc teachers and provide learning spaces for hands-on training of SHS students. TESDA offered free assessment of tech-voc teachers till December 2013. The agencies have difficulty in providing data particularly on employment. Coordination regarding information sharing is continuously done to guide the SHS planning process. The SHS Implementation Teams saw the need to review and update DTI data on One Town, One Product.
7
SHS Preparations – Division of Rizal STEP 4 – External Assessment: Education/Training Institutions Methodology: Consultation meetings were conducted in the municipal level. Representations to major universities were made. Summary of Initial Results: The higher education institutions (HEIs) and tech-voc institutions (TEIs) in the province are open to offering SHS TESDA Rizal offers free assessment for tech-voc teachers until December 2013.
8
SHS Preparations – Division of Rizal Private Schools Intending to Offer SHS TOTAL = 63
9
SHS Preparations – Division of Rizal STEP 5: Internal Assessment: SHS Projections on Enrolment (Using SHS Pro Tool 2) Public Schools
10
SHS Preparations – Division of Rizal STEP 5: Internal Assessment: SHS Projections on Enrolment (Using SHS Pro Tool 2) Private Schools
11
SHS Preparations – Division of Rizal SHS Projections: Teacher Class Ratio (Using SHS Pro Tool 2)
12
SHS Preparations – Division of Rizal SHS Projections: SUMMARY (Using SHS Pro Tool 2)
13
SHS Preparations – Division of Rizal STEP 6 – Internal Assessment: Learners and Parents Summary of Initial Results: Based on survey among Grade 8 parents, the SHS prospective students register to 25, 155. Attached is a graph presenting these data. Methodology: Conduct of survey among parents of Grade 8, focus group discussions
14
SHS Preparations – Division of Rizal SHS Projected Enrolment (Based on Parents’ Consultations) Division TOTAL = 25,155
15
SHS Preparations – Division of Rizal No. of SHS Learners Per Track/Strand Division TOTAL = 25,155 ( A C A D E M I C )
16
SHS Preparations – Division of Rizal No. of Public Secondary Schools According to Track(s) Offered MUNICIPALITY ACADEMICTECH -VOC ACADEMIC &TECH-VOC ARTS & SPORTS ANGONO 1111 BARAS 11 BINANGONAN 36 CAINTA 3 CARDONA 12 JALAJALA MORONG 111 PILILLA 22 RODRIQUEZ 12 SAN MATEO 4 TANAY 324 TAYTAY 7 TERESA 21 Total 10 401 Division TOTAL = 61
17
SHS Preparations – Division of Rizal STEP 7 – Internal Assessment: Where are the current Junior High Schools? JHS Sites link: https://maps.google.com/map s/ms?msid=20757187302519077 8078.0004e7a77892baebe6a32& msa=0https://maps.google.com/map s/ms?msid=20757187302519077 8078.0004e7a77892baebe6a32& msa=0 Notes: Division of Rizal has secondary schools in highly urbanized and remote areas. SHS planning context will differ in these areas. Its proximity to NCR and being a preferred settlement of informal settlers from NCR are major considerations in planning.
18
SHS Preparations – Division of Rizal STEP 7 – Internal Assessment: What are our available resources? Notes: All schools have no excess classrooms to accommodate SHS. The data presented are the existing resources for Junior HS which can be utilized for SHS classes. Number of Public Secondary Schools Number of Existing Classroom s Number of Existing Teachers Number of Non- Teaching Personnel 791,7503,709 GC- 29 BK – 32 DO - 31
19
SHS Preparations – Division of Rizal TOTAL = 38 Number of Public Secondary Schools with Buildable Space
20
SHS Preparations – Division of Rizal NO. OF QUALIFIED TEACHERS TO TEACH SHS (MAT/NC Holder) MunicipalityAcademicTech-Voc Arts and SportsTOTAL BINANGONAN 8953142 CAINTA 27633 CARDONA 62127 JALAJALA 325 PILILLA 104252 TANAY 3929169 TERESA 8 210 TOTAL 1371551293
21
SHS Preparations – Division of Rizal BUILDABLE SPACES, ROOMS AVAILABLE AND QUALIFIED TEACHERS TO TEACH SHS IN ELEMENTARY SCHOOLS MunicipalityBuildable Space (in sq. m.) No. of Rooms available for SHS No. of Elementary School Teachers who are Qualified to teach in SHS (MAT Grad/NCII) Angono003 Baras000 Binangonan*60001 Cardona63012 (2-storey)14 Cainta*002 Jalajala25200 Morong000 Pililla63.90 (8.95x7.14)2 - Drilon Building, 1 - Ynares Building 3 Rodriguez000 San Mateo115100 Tanay*1110052 Taytay*000 Teresa30006 – Ynares Buildings12 TOTAL16796.901937
22
SHS Preparations – Division of Rizal STEP 8 – Planning Proper: Proposed Schools & Sites for SHS TOTAL = 44
23
SHS Preparations – Division of Rizal TOTAL = 39
24
SHS Preparations – Division of Rizal Number of Partner Educational Institutions
25
SHS Preparations – Division of Rizal What are the resource requirements? Number of Prospective SHS Students Number of Needed Classrooms Other needed facilities Equipment NeedsTeacher Needs 636485 As stated in SHS Plan 821 COST PhP 426,120,000.00 PhP 398,705,000.00 PhP 161,797,343.96 PhP204,484,757.62 TOTAL: PhP 1,191,107,101.00
26
SHS Preparations – Division of Rizal STEP 8 – Planning Proper: Where are the proposed Senior High Schools? TOTAL = 52 SHS New Sites link: https://maps.google.com/map s/ms?msid=20757187302519077 8078.0004e7a77892baebe6a32& msa=0https://maps.google.com/map s/ms?msid=20757187302519077 8078.0004e7a77892baebe6a32& msa=0 Notes: With Division of Rizal’s proximity to NCR, there is a possibility of partnership with nearby HEIs and TVIs. Schools which are situated in island and mountainous areas need to come up with contextualized plans to address the learners’ concerns.
27
SHS Preparations – Division of Rizal What are the issues and scenarios you foresee? Provision of adequate number of classrooms, teachers and instructional materials is a major challenge for the Division. Gearing up for SHS particularly in implementing teacher development program needs institutional partnerships. There is a need for clear policy/directive to prioritize expenses for SHS in municipal SEF FY 2014-2016. Provision of TA to private schools must be in place to encourage them to offer SHS.
28
SHS Preparations – Division of Rizal Investment Priority Area in Rizal Information and Communication Technology Tourism Agri-business Manufacturing Source: Jobsfit DOLE 2020 Vision
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.