The Caserones Project October 2014 Mr. Héctor Sepúlveda O.
Services Manager SCM Minera Lumina Copper Chile
2
Project location 15 km from the Argentinean border
Caserones 15 km from the Argentinean border 2,000 to 4,600 m above sea level 575 km North of Santiago 162 km South-East of Copiapó 414 km south of Antofagasta
3
Caserones Project Open Pit Owners Extraction Method
Pan Pacific Copper % Mitsui Trading % Production Capacity Concentrate Cu (110 kt a 150 kt/yr) Concentrate Mo (3 kt/yr) Cathodes ( mil toneladas) Design Capacity – contractors employee (construction phase) 2,000 employee (operación phase – 500 own and 1,500 thirds). Sttafing 1.047 millions tons of sulfur ore with an average of 0,34% Cu, 126 ppm of Mo and 296 millions ton of leached ore with an average of 0,30% of Cut. Reserves Owners Concentrate Cu (105 kt/day) Concentrate Mo (3 kt/yr) SX/EW Plant: (30 kt/yr)
4
Caserones Project US$ 4,2B. Investment Exploitation life
28 yrs. Exploitation life Water consumption 48 months, starting in April 2010. Construcción Period SX/EW Plant: March 2013 Concentrate Plan: July 2014 Start-up 518 lt/s.
5
Project progress May 2006 PPC purchases the project Oct 21st 2008 EIS filed Jan 13th 2010 EIS Approval 2012 Leaching started 2033 End of cathode production 2013 1st Copper Cathode 2010 Construction begins 2008 – 2009 Feasibility 2007 – 2008 Prefeasibility 2014 Concentrator Start up 2040 End of concentrate production
6
Tough climate and geography
WIND 86 km/h MAX 2013 TEMPERATURE - 18 ⁰C 14,14 ⁰C MIN & MAX 2013 SNOW 380 cm TOTAL 2013 MINIMUM WIND CHILL (31|07|2011) - 40 ⁰C PLATAFORMA 4392 CURVA NEGRA Not even one flat m2
7
Construction history 2010 2011 2012 2013
8
Now 42 Mm3 earth movement 21,000 ton structural steel 200,000 m3 concrete 1,200 mechanical equipment 1,600 km electrical cable 282 km piping 85 millions of HH companies
9
Process MINE SX-EW WATER CONCENTRATOR MOLYBDENUM CONCENTRATE COPPER
COPPER CATHODES DUMP LEACH 4,000 masl MINE 4,600 masl SX-EW PORT PRIMARY CRUSHER WATER CONCENTRATOR 3,900- 4,100 masl FLOTATION GRINDING MOLY PLANT SLIMES DEPOSIT 2, ,000 masl MOLYBDENUM CONCENTRATE COPPER CONCENTRATE SANDS DEPOSIT 3, ,600 masl PORT
10
Mine Process LOADING BLASTING DRILLING TRANSPORT OXIDES TO DUMP LEACH
ton Komatsu trucks 2 electrical 73-yd3 shovels 1 hydraulic 56-yd3 shovel 3 33-yd3 front loaders 3 drilling machines OXIDES TO DUMP LEACH WASTE TO DUMP SULPHIDES TO CONCENTRATOR
11
Dump Leach Initial Area = 1 million m2 Final Area = 2 million m2
Lined surface Irrigation rate: 2000 m3/hr Ore Capacity: 300 million tons 20 to 40 m benches
12
SX-EW Plant (Outotec)
13
First Cathode March 13th, 2013
14
Primary Crusher - Concentrator
15
Grinding - Flotation - Moly Plant - Tailings
16
Tailings transport and disposal
Slimes dam 470 Mm3 Rapid Borrow wall 108 Mm3 HDPE 800 mm pipeline 3.6 km long Tunnel 4.5 x 4.5 section Sand deposit 360 Mm3
17
First Ton to SAG Mill April 17th, 2014
18
First Concentrate Shipment
July 16th, 2014 July 29th, 2014
19
Mission What we want to achieve .... Secure stable copper / moly supply, creating sustainable value for our owners and stakeholders: 3,4 mtf Copper in concentrate 449 ktf Copper cathodes 95 kt Molybdenum
20
Final Remarks It´s been eight years of an on-going effort in an environment of extreme conditions with thousands of people working with a common objective: To design and built the Caserones project according to the highest social, environmental, safety, engineering and construction standards. It is an endeavour committed to a long term relationship with our stakeholders - community, workers, suppliers, contractors and owners - with reserves that will allow us to produce copper and molybdenum for at least 28 years through an efficient and sustainable operation. Successful transfer of a high altitude wetland