Presentation is loading. Please wait.

Presentation is loading. Please wait.

VSG Input WG78/SC214 SG (Luxembourg) Feb 2012VSG - Input Presented by VSG (Greg Saccone / Jerome Condis)

Similar presentations


Presentation on theme: "VSG Input WG78/SC214 SG (Luxembourg) Feb 2012VSG - Input Presented by VSG (Greg Saccone / Jerome Condis)"— Presentation transcript:

1 VSG Input WG78/SC214 SG (Luxembourg) Feb 2012VSG - Input Presented by VSG (Greg Saccone / Jerome Condis)

2 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. CPDLC Msg Set Validation CPDLC Msg Set CPDLC Msg Set planned to be submitted to ICAO OPLINKP#4 (Mar 2012) Should be the basis for initiation of the formal ICAO validation (States consultation) planned to last 18 months at least Validation will continue as part of SESAR, NextGen and others  Need to define a robust process to manage this two validations in parallel VSG will address this issue and may come up with an additional Working Paper for OPLINKP#4 to support the validation of the Message Set Feb 2012VSG - Input

3 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. VSG Schedule Feb 2012VSG - Input

4 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Validation Report Status Fresh news from SESAR Live Initial 4D flight conducted on 10 Feb 2012 Successful RTA target achieved in windy and high pressure environment with the 2 FMS vendors CPDLC and ADS-C (including EPP and ETAmin-max) exchanges completed for one complete descent AirbusI4D.mpg Feb 2012VSG - Input

5 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Validation Report Status Validation Report v0.D Validation Report v0.D released 06 Feb 2012 Includes latest external validation projects objectives results  External coordination shall continue to track results from external VPs Includes partial internal validation results  Internal coordination shall continue to ensure results from internal VAs are properly captured Validation Results template Updated Validation Results template is ready for distribution VSG schedule Progress in line with agreed VSG schedule Feb 2012VSG - Input

6 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Validation Report – Workplan for this week Validation Report v0.D Review comments on Validation Report v0.D if any Progress on internal validation results records Validation Results template Release Validation Results template to external VPs Feb 2012VSG - Input

7 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Validation Plan Status & Workplan Now v0.I standards are released Validation Objective Operational Requirement update Validation Objective and Operational Requirement matrixes will cover service name changes, new services since Version H More mature service definitions can now be captured, especially for :  FIS  IER  OCL  D-RVR  D-HZWX Standards Validation Plan v2 Identification of remaining to do items and associated plan, with target of Apr 2012 for Standards Validation Plan v2 release Feb 2012VSG - Input

8 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Validation Plan Scope (reminder) Feb 2012VSG - Input ATS Data Link ServicesATNFANSL2K BC DLIC (including seamless transition)Covered in V1 ACMCovered in V1 CRDCovered in V1 AMCCovered in V1 ITBOCovered in V1 DCLCovered in V1 Not applicable D-TAXICovered in V1Not applicable D-OTISCovered in V1Not applicable 4DTRADCovered in V1Not applicable IER (CPDLC)Covered in V2 IER (ADS-C)Covered in V2 Not applicable PRCovered in V2 Not applicable CRD for ITPCovered in V2 Not applicable CRD for IMCovered in V2Not applicable DSCCovered in V2Not applicable D-RVRCovered in V2Not applicable D-HZWXCovered in V2Not applicable

9 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. VSG Planning for the week Feb 2012VSG - Input Mon 13 FebTues 14 FebWed 15 FebThurs 16 FebFri 17 Feb AM (9:00 – 13:00) Common Session VSG Validation Plan VSG Validation Plan VSG Validation Report VSG Validation Report VSG CPDLC Msg Set Validation PM (14:00-17:00) VSG CPDLC Msg Set Validation Common session VSG Validation Plan

10 © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. Feb 2012VSG - Input © AIRBUS Operations S.A.S. All rights reserved. Confidential and proprietary document. This document and all information contained herein is the sole property of AIRBUS Operations S.A.S. No intellectual property rights are granted by the delivery of this document or the disclosure of its content. This document shall not be reproduced or disclosed to a third party without the express written consent of AIRBUS Operations S.A.S. This document and its content shall not be used for any purpose other than that for which it is supplied. The statements made herein do not constitute an offer. They are based on the mentioned assumptions and are expressed in good faith. Where the supporting grounds for these statements are not shown, AIRBUS Operations S.A.S. will be pleased to explain the basis thereof. AIRBUS, its logo, A300, A310, A318, A319, A320, A321, A330, A340, A350, A380, A400M are registered trademarks.


Download ppt "VSG Input WG78/SC214 SG (Luxembourg) Feb 2012VSG - Input Presented by VSG (Greg Saccone / Jerome Condis)"

Similar presentations


Ads by Google