Disaster Management Plan S.VENUGOPAL, Manager(HSE)
Emergency Response & Disaster Management Plan PETRONET LNG LIMITED Dahej S.VENUGOPAL, Manager(HSE)
2
Petronet LNG is India's first LNG Terminal at Dahej
3
LOCATION OF DAHEJ
4
FACTORY LAYOUT JETTY FACTORY BOUNDARY N Petronet North Gate
(Main Gate) South Gate T 101 T 102 T 103 T 104 TLF ECC 1 ECC2 FACTORY LAYOUT
5
Emergency Control Centre (ECC-1)
6
Emergency Control Centre (ECC-2)
7
EMERGENCY RESPONSE TEAM (ERT)
Control Room panel operator Plant operator Chief Incident Controller (CIC) Site Incident Controller (SIC) Fire & Rescue Coordinator Medical Coordinator Security Coordinator (Evacuation and Traffic control) HSE Coordinator Gas Monitoring Coordinator Communication Coordinator Transport & Logistics Coordinator Demolition & Reconstruction Coordinator HR & Welfare Services Coordinator (Relief & Rehabilitation) Public Relation and Mass Media Coordinator Technical Coordinator Operations Coordinator Port Operations Coordinator (In Case of Port operation emergency) Maintenance (Electrical, Mechanical & Instrument) Coordinator Recorder Messenger
8
COMMUNICATION SYSTEM Automatic Fire Gas Spill Detection System Automatic Smoke and Heat Detection System Manual Call Points (MCP) Portable Radio sets (Walkie Talkie) Public Address System Paging System Telephones Emergency Sirens Messengers
9
Reliance Industries Ltd. Gujarat Alkalies & Chemicals Ltd.
Mutual Aid Support Petronet LNG Ltd. Reliance Industries Ltd. Gujarat Alkalies & Chemicals Ltd. Hindalco (Aditya Birla Copper) Gujarat Chemical Port Terminal Company Ltd. ONGC (C2-C3 extraction plant)
10
Approach Route to Plant
RIL Birla Copper GCPTCL Welspun Sarasawati Township DMC C/R Route MAP to Petronet LNG Adani Petronet ONGC C2C3 GACL GFL Petronet LNG
11
Rehabilitation Camp Route
Center Rehabilitation Camp Route Lakhigaon School GCPTCL Plant RIL Rehabilitation from Adani Petronet & Lakhibaba temple Adani Petronet Luwara School ONGC C2-C3 Plant Rehabilitation Center Assembly point PLL south gate
12
Fire Tender & Ambulance Route
Route to PHC Dahej GCPTCL Plant Lakhigaon School Emergency Vehicle From Bharuch & near by factory Emergency Vehicle From GCPTCL Adani Petronet Luwara School ONGC C2-C3 Plant
13
Emergency Coordinator Team Approach route & Car Parking
Lakhigaon School GCPTCL Plant Emergency Vehicle From Bharuch & near by factory Emergency Vehicle Form GCPTCL Adani Petronet Luwara School ONGC C2-C3 Plant Car Parking
14
OFF SITE EMERGENCY DRILL 19.02.2010
15
OFF SITE EMERGENCY DRILL
Scenario: Leakage of LNG at TLF Skid from 4” LNG tanker feed pipeline at the upstream side of MOVP Location: Truck Loading Facility (TLF) Date & Time:
16
Location of LNG Leak in TLF area
Petronet Main Gate Petronet South Gate T 101 TLF Area FACTORY BOUNDARY
17
Main Control Room (ECC-1)
18
Main Control Room (ECC-1) in action
19
Emergency Control Centre (ECC-2) in action
20
Regular Updation of Situation in ECC-2
21
Assembly Point
22
Fire fighters in action at site
23
Fire Fighters in action
24
Rescuers in action
25
Observers at site
26
External Observers outside the plant
27
Medical Team in action
28
Medical Team in action
29
Mutual Aid Fire Tender Arrival
30
Mutual Aid Ambulance Arrival
31
Mutual Aid Support Team arrival
32
District Level Mutual Aid Support
33
Gas Monitoring Team in action
34
Gas Monitoring
35
Evacuation
36
Evacuation
37
Evacuation completed
38
Evacuation
39
Transportation to rehabilitation camp
40
Transportation of persons to camp
41
Vehicle Entering Rehabilitation Camp
42
Rehabilitation Camp - Luwara
43
Rehabilitation Camp - Luwara
44
Rehabilitation Camp - Luwara
45
Rehabilitation Camp - Luwara
46
Ambulance in Rehabilitation Camp
47
First Aid Centre in the camp
48
Final Debriefing Meeting