Strategic Energy Planning Prepared by Utility Savings Initiative State Energy Office Department of Commerce
2
Agenda Basic Strategic Energy & Water Planning This course will provide the necessary information for the participant to develop and implement an energy plan. An energy plan should provide the methodology to effectively manage utilities for your facilities.
3
Agenda Process Steps Why How Data Collection Measure Results Evaluate Results Develop Plan ECMs to Implement Strategies ( ECMs to Implement ) Specifics Tactics ( Specifics ) Implement Plan Measure Evaluate Develop Implement Data Collection
4
Why “Failing to Plan is Planning to Fail” Alan Lakeim
5
Why Manage Utility Consumption Control costs Avoided Costs Savings vs. Avoided Costs Control GHG Improve building performance. Identify emergency conservation procedures Create equipment replacement Policy
6
How Assemble stakeholders Internal Buildings (clarity/efficient) Facilities personnel (clarity/efficient) utility bills Building Occupants ( utility bills ) Incentives Utility providers ( Incentives ) Management Financial personnel Human Resources Trusted advisors Community Based Programs Home owners associations Chamber of Commerce Community Organizations
7
Energy Plan Cycle Measure Evaluate Develop Implement Data Collection Continuous Process Improvement
8
Data Collection Utility bills consumption and cost - monthly Total costs including base meter charges, fees, taxes l year history minimum Provides a baseline and ability to measure progress Buildings, equipment inventory (CMMS), insurance lists, plug load inventory including space heaters Building assessments “At least One Year Data is Needed”
9
Self Assessment Occupancy Sensor is Needed
10
Self Assessment Position Sensors to avoid Interference
11
Self Assessment Purchase Energy Star Equipment
12
Plug Load Awareness Mini Refrigerators cost between $80 and $150 dollars a year to operate Get Rid of Energy Hog
13
Plug Load Awareness Check for plug loads that may lead to disaster
14
Plug Load Awareness Thermostat above both coffee pot and toaster oven Energy Hogs!!!!!!
15
Plug Load Awareness Kapiolani Community College Media Center, Oct. 06, 1998 Final Fire Cause : UNATTENDED COFFEEMAKER Loss Estimate:$95,000.00 (structure and contents) *Pictures courtesy of Mr. Maynard Young Director, Physical Facilities, Planning and Construction Office of the Sr. VP/Chancellor for Community Colleges
16
Plug Load Awareness Space Heaters cost between $150 and $250 dollars a year to operate per heater. Don’t forget to add extra cooling costs in the summertime. Energy Hogs !!!!!!!
17
Data Collection Sub-meter Data Purchasing policies Energy star Life Cycle Cost Analysis If policies do not contain an energy efficiency element they should Current policies, programs, projects and funding
18
Data Collection DATA COLLECTION MUST BE COMPLETE BEFORE TECHNICAL ASSISTANCE SITE VISITS CAN BE SCHEDULED !!!!!!!
19
Energy Plan Cycle Measure Evaluate Develop Implement Data Collection Continuous Process Improvement
20
Measure Results of Data Collection Identify gaps in data: Supply side (utilities) Demand side (owner) Develop methods to record consumption and cost data both supply and demand recommended
21
Measure Results of Data Collection Building audit and maintenance reports Hot/cold areas vs. calls Plug load Current projects, programs and funding Purchasing policies
22
Energy Plan Cycle Measure Evaluate Develop Implement Data Collection Continuous Process Improvement
23
Evaluate Results of Data Collection Validate data accuracy Do gaps need to be filled before continuing If yes, becomes part of plan Building data Create prioritized list of ECMs Group: no-cost /low-cost/capital Establish key performance indicators (KPI’s)
24
Key Performance Indicators Evaluate Results of Data Collection Btu/gsf/yr The Energy Office has to standardize on Btu/gsf/yr and gal/gsf/yr as an overall state level KPI Should this metric not accurately reflect your performance you may create additional KPIs and report this in your Plan
25
Energy Plan Cycle Measure Evaluate Develop Implement Data Collection Continuous Process Improvement
26
Develop the Plan S.M.A.R.T Goals in a S.M.A.R.T Plan Specific Measureable Action-Oriented Realistic Time-Dependent
27
Develop the Plan Keep it focused and simple Less may be more Sustainable
28
Develop the Plan Strategies The philosophies, plans and policies supporting long term energy management goals Example: “We will implement conservation measures that have a simple payback of two years or less.”
29
Develop the Plan Tactics Short term actions that support strategic energy management goals Example: We will replace all incandescent EXIT signs in buildings ABC and XYZ this year with more efficient technologies
30
Develop the Plan Primary USI Focus Areas Executive summary Supply side (supplier side of meter) Demand side (owner side of meter) Communication and Training Water
31
Develop the Plan Optional Focus Areas Transportation Community Based Residential programs Non-profit programs Commercial, industrial, retail programs
32
Develop the Plan Executive summary elements Multi year look ahead (5 years) Summarize where you are and where you want to go Brief description of facility/campus Top Executive statement of commitment
33
Develop the Plan Executive summary elements Mission and goals of plan 20% reduction by 2010 30% reduction by 2015 Assign overall responsibility and accountability List KPI
34
Develop the Plan KPI Example:
35
Develop the Plan Supply Side Strategies
36
Develop the Plan Supply Side Tactics
37
Develop the Plan Other Supply Side Tactics Data collection, management and analysis Identify appropriate software ( Energy Accounting ) Assign responsibility Rate reviews Review contracts with providers Leverage utility company incentives
38
Develop the Plan Demand Side Strategies
39
Develop the Plan Other Demand Side Strategies Adopt LEED or other building standard Statutory new building requirements Project criteria Simple payback LCCA ROI Equipment replacement strategy Sub-metering objectives
40
Develop the Plan Demand Side Tactics
41
Develop the Plan Other Demand Side Tactics Take projects from prioritized list Specific targeted activities Short implementation times Measureable results
42
Develop the Plan Communication & Training Strategies
43
Develop the Plan Communication & Training Tactics
44
Develop the Plan Other Communication & Training Tactics Conservation Action Team Occupants, facilities, admin. security, housekeeping, etc.. Turn off/Turn down Training EMD classes Building Operators Certification Technical workshops and classes
45
Develop the Plan Water Strategies
46
Develop the Plan Water Tactics
47
Develop the Plan Appendix A – Emergency Energy Procedures Tactics Short term Identify non-critical loads
48
Develop the Plan Appendix B – Emergency Water Procedures Tactics Short term Determine consequences of actions
49
Develop the Plan Appendix C – Equipment Replacement Tactics Identify critical equipment Locate potential loaner/rental replacement Determine if equipment is still the correct size, capacity and type for current conditions Specify correct replacement including source
50
Energy Plan Cycle Measure Evaluate Develop Implement Data Collection Continuous Process Improvement
51
Implement the Plan Identify financial resources Utility Providers O&M R&R COPS/Bonds Performance Contracts SEO ARRA funds
52
Implement the Plan Identify partner resources Community Colleges Universities County or municipal partners SEO Workforce development boards COGS
53
Implement the Plan Perform no cost behavioral activities first Align resources with projects Assign accountability and responsibility Then Do It
54
Energy Plan Cycle Measure Evaluate Develop Implement Data Collection Continuous Process Improvement
55
Measure Results of Implementation Results should be measured based upon the method indicated in the tactic tables.
56
Measure Results of Implementation Continue to identify gaps in data Measured energy reductions from meter data Measured cost reductions from billing data KPI Trend Number of measures implemented from plan
57
Measure Results of Implementation Number of newsletters issued Number of team meetings conducted Building performance data Hot/cold calls Plug load inventory Purchasing policies including rate changes Occupant participation
58
Measure Results of Implementation Supply Side Tactics
59
Measure Results of Implementation Demand Side Tactics
60
Measure Results of Implementation Communication & Training Tactics
61
Measure Results of Implementation Water
62
Energy Plan Cycle Measure Evaluate Develop Implement Data Collection Continuous Process Improvement
63
Evaluate Results of Implementation Validate data accuracy Were measurements relevant for what you wanted to achieve with the activities?
64
Evaluate Results of Implementation Did you achieve or surpass goals as indicated in measurements column of tables? If not, why? Is the project complete? Continue, expand or abandon project
65
Evaluate Results of Implementation Determine next steps to achieve strategic goals Create new prioritized list Group: no-cost /low-cost/capital Set realistic goals
66
How the Plan Can Look Executive Summary The realistic appraisal of the Town’s energy and transportation sectors underscore the need to act now. In a concerted effort, Congress, North Carolina General Assembly, and local agencies have set out energy policy statements and objectives to mitigate climate change by improving energy efficient standards. Recognizing the need for sound energy decision-making, the Town will improve the efficient use of energy, water, and transportation systems. A new path of transformation will be laid to address the challenges of the global economy through the Strategic Energy Management Plan (SEMP).
67
How the Plan Can Look Existing Conditions The Town owns and operates 16 buildings, varying in age and totaling over 500,000 square feet. In addition to the buildings, the Town also maintains recreational facilities. The Town facilities help support the services necessary for approximately 23,000 residents. Baseline Energy Consumption A baseline was developed using FY 2007 cost and usage data. The four buildings listed in the table are the target buildings. All other buildings will be added as a first year tactic.
68
How the Plan Can Look KEY ELEMENTS AND FOCUS AREAS OF THE PLAN The Energy Plan is not intended as merely a mandate to perform specific energy- related tasks, but instead presents a framework for making unique energy decisions. Key elements consist of: Data collection — Accurate measurement and analysis of electricity, fossil based fuels, and water usage to benchmark and develop Key Performance Indicators (KPI), including a quarterly review of trends and costs. Plan development — Organizing a support committee for Energy Culture Change to review polices, programs, projects encourage employee participation and innovation Expanding employee education and awareness on the benefits of energy resource management and conservation via, electronically email, intranet and handouts. Execute approved, prioritized projects of energy efficiency and fuel conservation and implement process improvements, based on Cost Benefit Analysis (CBA) from Energy Assessments, Capital Improvement Plan (CIP) and Best Management Practices
69
How the Plan Can Look
73
Sample Declaration I have read the Strategic Energy & Water Plan for my Organization. The plan, as presented, supports the reductions required in G.S. 143 ‑ 64.12(a) Implemented this ____ day of ___________, 2009. _____________________________________________________________ _______________________ Utility Manager Director of Facilities Chief Financial/Budget Officer Department Head/Chancellor
74
Sample Mandate Commitment We recognize that energy and water consumption can be managed to our benefit. Energy and water management is a responsibility of the occupants at each facility, guided and supported by the Energy Manager, USI liaison. The attached plan outlines the activities and expenditures required to reduce energy and water consumption to achieve the goals of the program. The Department Heads will review progress and results quarterly, and will support staff attendance at training in energy and water management at least quarterly. Strategic Energy & Water Plan Mandate- Goals Reduce annual Total Energy Consumption by a minimum of ___% by fiscal year _____-____ from a baseline fiscal year ____-____. Strategic Energy & Water Plan Mandate- Measures Our tracking measures will be the following Key Performance Indicators (KPI): Total Energy Use Btu per Square Foot per year Strategic Energy & Water Plan Mandate- Commitment I have read and support the Strategic Energy & Water Plan for my Organization Implemented this ____ day of ___________ ______________________________________ ___________________________ _______________________ Utility Manager Director of Facilities Chief Financial/Budget Officer Chief Operating Officer
75
Possibilities “Don’t make excuses. Find solutions.” Unknown
76
USI Contacts… Len Hoey 919 733 1891 lhoey@nccommerce.com Chuck Sathrum 919 715 1158 csathrum@nccommerce.com Reid Conway 828 670 3389 rconway@nccommerce.com
77
Thank You for Attending
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.