Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation.

Similar presentations


Presentation on theme: "Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation."— Presentation transcript:

1 Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation

2 Operational Services and Environment Definition (OSED) Environment Review & Revision Operational Service Definition Operational Safety Analysis Operational Performance Analysis Global Safety & Performance Requirement Definition Interoperability Requirement Definition - ATN - FANS Accommodation Technology Independent & Portable Service Definition Closing the Loop – Global Standards RTCA – EUROCAE Joint Development Validation and Tracing

3 Closing the Loop – Single ICAO Compliant Data Communications System GOAL Harmonization of Oceanic and Domestic Dallas Fort Worth Frankfurt

4 SC 214/WG 78 SPR  Two Environments (MidTerm = ENVA, High Perf Airspace = ENVB)  Joint (US, Eurocontrol)  Converged (Surface, Terminal, Domestic Enroute, Oceanic Enroute, Remote)  New/Updated Software Applications  Context Management/ (CM - Log On)  Controller Pilot Data Link Communications (CPDLC)  Automatic Dependent Surveillance – Contract (ADS-C)  Flight Information Services (D-FIS)  Interoperability  ATS Interoperability Document

5 SC 214 Tracing Resources  Operational Requirements (MITRE C Team)  John Gonda (Lead the work)  Ron Tornese (Run the meatgrinder)  Brent Blackwell (Review from Ops perspective - air)  Ed Brestle (Review from Ops perspective – ground)  SRs and PRs  Kathy Devito (Thane)  IRs  Fred Picard (Egis)

6 Required by both the SC 214/WG 78 CSG and VSG  ORs to ORs (John and the C Team)  Operating Method (OM) Tables to OM Tables  Section to Section (John and the C Team)  ORs to sections where ORs do not exist  Safety Requirements (SRs) to SRs (Kathy)  Performance Requirements (PRs) to PRs (Kathy)  Interoperability Requirements (IRs) to IRs (Fred) SC 214/WG 78 Requirement Tracing Guidelines Page 6

7 Objective  Do one set of traces to suit the needs of the following:  SC214/WG78  FAA DCP  FAA AVS  Does not include Data Comm Program specification traces such as SSD to SC 214 etc  Use Excel to do the basic work  Intent is to port over to DOORs at the appropriate time

8 Direction of Trace Page 8

9 214SPR DO290/ LINK DO280/ LINK DO306SARPs 214ATN INTEROP 214FANS INTEROP DO305 A Trace John A1A2A3A4A5 B Trace Fred B1B2 C Trace Fred C4C2C3C1 D Trace John D1 D2 E Trace Fred E3E2E1 SC 214/WG78 Tracing Requirements

10 Internal Validation Activities Validation project ID CreationIdentification SC214/WG78 Point of contact Frame Validation Activity BeginEndComments VSG-VA17-May-2010Traceability SC214-WG78 SPR with ED120/DO290 (OR/SR/PR) John GONDACSG15-May-201030-Jun-2010A1 to A2 DO-290 as LINK 2000+ VSG-VA27-May-2010Traceability SC214-WG78 SPR with ED122/DO306 (OR/SR/PR) John GONDACSG30-Jun-201030-Jul-2010A1 to A4 VSG-VA37-May-2010Traceability SC214-WG78 Standards with ICAO Doc 9880 Fred PICARD & Thierry LELIEVRE CSG 7-May-2010 Sept-2010Does this include all ICAO requirements? C3 to C1, C4 VSG-VA47-May-2010Traceability SC214-WG78 Standards with ED110B/DO280B Fred PICARD & Thierry LELIEVRE CSG7-May-2010 Sept-2010 C2 to C1, C4 VSG-VA57-May-2010Traceability SC214-WG78 SPR with SC214- WG78 ATS Interop Fred Picard & Thierry LELIEVRE CSG7-May-2010 Sept-2010 E2 to/from E3 VSG-VA67-May-2010Traceability SC214-WG78 SPR with SC214- WG78 Mixed ATS Interop Fred Picard & Thierry LELIEVRE CSGNot Started ??? B1 to B2=> NO E3 to E1

11 Internal Validation Activities (cont) VSG-VA73-Jun-2010ORs Requirements assessment during Validation Objectives drafting John GONDA & Dijana PASIC VSG VSG-VA83-Jun-2010SRs & PRs Requirements assessment during Validation Objectives drafting Kathy DEVITO & Wim BRONDSEMA VSG VSG-VA93-Jun-2010IRs Requirements assessment during Validation Objectives drafting Fred PICARD (ATS) & Pascal ROHAUT (L2K+) & Chris Collings (FANS) VSG3-Jun-2010 Sept-2010 - VSG-VA1021-Jun-2010Traceability SC214-WH78 SPR with DO280/ED110 John GondaCSG30-Jul-201030-Aug-2010A1-A3 VSG-VA1121-Jun-2010Traceability SC 214-WG78 SPR with SARPs John GondaCSG30-Aug-201030-Oct-2010A1-A5 VSG-VA1221-Jun-2010Traceability SC 214 FANS Interop with DO 305/EDXXX John GondaCSG1-Feb-20105-Mar-2010OR Complete

12 RTCA SC 214/EUROCAE WG 78 SPR Status  Draft Version H (incl ATN/FANS Interops) posted on a public website http://www.faa.gov/about/office_org/headquarters_offices/ato/ service_units/techops/atc_comms_services/sc214/  OEMs are building the SW applications  Configuration control has been instituted  Validation of the SPR is underway  Oceanic/Domestic Integration target - Version I  Green/Grey cover documents planned by December 2011


Download ppt "Closing the Loop on NextGen Air- Ground Data Communications John Gonda SC 214/WG 78 U. S. Lead for Operational Requirements Tracing and Validation."