Download presentation
Presentation is loading. Please wait.
Published byAdrien Ashmore Modified over 9 years ago
1
IPO Presentation November 2011
2
September 2011 2 VMS Districts Net Values Wabassi Image From HudBay Corporate Presentation Exploration Program Review, Dec. 15, 2010 Major Successes Rising Corporations
3
September 2011 3 Location 180 km south of Ring of Fire 170 km north of railhead at Nakina, Ontario Ontario Wabassi: Proposed Rail link Wabassi
4
September 2011 4 2011 VTEM – Preliminary Targets A2 Anomaly E New Exploration Camp Location
5
September 2011 5 Assay Results Anomaly E Long Run Price Zn $ 0.60/ lb Ni $ 5.00/ lb Cu $ 1.50/ lb Ag $ 16.00/ Oz Au $ 750.00/ Oz Drill Hole From (m) To (m) Interval (m) Ag (g/t) Cu% Ni% Zn% Au (g/t) $/ton Value
6
September 2011 6 2011 VTEM – EM - New Targets (Scales Equal) Block 2 VTEM Block 3 VTEM Anomaly ‘E’ VMS Discovery-2011 2010 VTEM Survey Size Comparison & Location, Referencing New VTEM Targets – Blocks 2 & 3 **Note: Based on ground & downhole geophysics & drilling (4 holes) the mineralization contained within Anomaly E is 650m in length, averages 24m thick, and is open along strike in both directions and at depth!! Anomaly “E” VMS Discovery A-2 VMS Discovery
7
September 2011 7 Capital Structure *as of July 31, 2011 Common Shares Issued38,475,000 Fully Diluted45,575,000 Investment Assets$1,525,200 Cash$803,149* WPX Debenture$4,450,000 Converts at IPO Price Shares and Assets
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.