1 Adding Value Part 1 www.renos.com.au | info@renos.com.au | 1300 550 656

2 Building reports Smoke and mirrors quotes Floor plan challenge Adding Value

3 Building Reports Gardens / Fill against house

4 Building Reports Gutters rusting

5 Building Reports Downpipes rusting

6 Building Reports No circuit breakers installed

7 Building Reports Downpipes discharging next to stump

8 Building Reports External coatings showing signs of wear and possible breakdown of waterproofing

9 Building Reports Possible asbestos if built before 1986

10 Building Reports Damaged decking

11 Building Reports No hand rail

12 Building Reports Debris under house

13 Building Reports Missing stump

14 Building Reports Tree on gutter

15 Building Reports Rotted out stumps

16 Building Reports Steps propped

17 Building Reports Unsafe steps

18 Building Reports Damaged kitchen flooring

19 Building Reports Jockeys only bathroom

20 Smoke and Mirrors Quotes

21 DESCRIPTIONQTYRATE EXC GST DISCOUNTAMOUNT EXC GST POST CCA TREATED WET 100x75MM 2.41 PINE PALINGS CCA TREATED 75x16x1.5M40 PINE PALINGS CCA TREA75x16x1.8M20 TREATED PINE F5 70x35MM 5.4M H31 CONCRETE MIX RAPID SET CONCRETE 20KG3 GATE END FRAME3 HORIZONTAL D-RAIL HD1.61 HORIZONTAL D-RAIL HD1.31 HORIZONTAL RAIL H9001 TRANSPORT CHARGE SINGLE DEL50 TOTAL EX GST527.38 GST52.73 TOTAL580.11 QUOTE 1 Rule #1: Always get itemised quotes

22 DESCRIPTIONQTYRATE EXC GST DISCOUNTAMOUNT EXC GST POST CCA TREATED WET 100x75MM 2.4110.50 PINE PALINGS CCA TREATED 75x16x1.5M401.3554.00 PINE PALINGS CCA TREA75x16x1.8M201.4529 TREATED PINE F5 70x35MM 5.4M H3113.10 CONCRETE MIX RAPID SET CONCRETE 20KG38.1024.3 GATE END FRAME392.30276.90 HORIZONTAL D-RAIL HD1.6153.00 HORIZONTAL D-RAIL HD1.3151.00 HORIZONTAL RAIL H900121.50 TRANSPORT CHARGE SINGLE DEL500.9145.50 TOTAL EX GST578.80 GST57.88 TOTAL636.68 QUOTE 2 Rule #2: Don’t pay retail

23 DESCRIPTIONQTYRATE EXC GST DISCOUNTAMOUNT EXC GST POST CCA TREATED WET 100x75MM 2.419.28TD0209.28 PINE PALINGS CCA TREATED 75x16x1.5M201.16TD02023.20 PINE PALINGS CCA TREA75x16x1.8M201.32TD02026.40 TREATED PINE F5 70x35MM 5.4M H3112.69TD02012.69 CONCRETE MIX RAPID SET CONCRETE 20KG37.10TD01021.30 GATE END FRAME388.18TD005251.31 HORIZONTAL D-RAIL HD1.6150.36TD00547.84 HORIZONTAL D-RAIL HD1.3149.73TD00547.24 HORIZONTAL RAIL H900120.55TD00519.52 TRANSPORT CHARGE SINGLE DEL500.9145.40 TOTAL EX GST504.18 GST50.41 TOTAL554.59 QUOTE 3 Rule #3: Check Quantities

24 DESCRIPTIONQTYRATE EXC GST DISCOUNTAMOUNT EXC GST POST CCA TREATED WET 100x75MM 2.419.28TD0209.28 PINE PALINGS CCA TREATED 75x16x1.5M401.16TD02046.40 PINE PALINGS CCA TREA75x16x1.8M201.32TD02026.40 TREATED PINE F5 70x35MM 5.4M H3112.69TD02012.69 CONCRETE MIX RAPID SET CONCRETE 20KG37.10TD01021.30 GATE END FRAME388.18TD005251.31 HORIZONTAL D-RAIL HD1.6150.36TD00547.84 HORIZONTAL D-RAIL HD1.3149.73TD00547.24 HORIZONTAL RAIL H900120.55TD00519.52 TOTAL EX GST481.98 GST48.19 TOTAL530.17 QUOTE 4 Rule #4: Check for each item Where is the delivery charge?

25 Floor Plan Challenge

26

27 Floor Plan Solution

28 Summary Building reports can be misleading Always attend the building inspection Obtain written quotes for required works where possible Check quotes thoroughly Get more than one quote Ask for a trade discount Check off all deliveries before signing off

29 Summary More bedrooms = more money Create rooms under existing roof line Label floor plans for the highest value