Download presentation
Presentation is loading. Please wait.
1
Status report for revision of API 17F
API Winter 2014
2
Status Draft document was re-balloted by API
ballot closing on March 2013. Ballot passed with 17 affirmative and 2 negative votes. Total of 110 comments, (22 technical), 3rd edition will be published as a standard Now on 3rd ballot, deadline 24th January 2014 NB Section on chemical injection has been deleted
3
Milestones Milestone Targets Completion Date
Comments from second ballot complete 4Q 2013 3rd ballot closure 24th January 2014
4
API 17F working group Name Company Al Williams Dril-Quip
Crispin Richards Genesis Brian Skeels FMC William Taggart Murphy David Lansberry Spiridon Ionescu IntecSea Jay Hursh Aker Solutions David Bell Bechtel John Allen Don Ogwude CSI John Simon Shell Mott Gochnour BP Mike Brashear Chevron Jake Hennig Oceaneering Lee Mitchell Nancy Chafe Anadarko Richard Barratt GE Vetco William St George ExxonMobil Christopher Curran
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.