IBL Vacuum Box in UX15 Short summary Andrzej Zmuda andrzej.zmuda@cern.ch
2
Planned place to install
3
Planned method of installation 4 holes in angle bars 4 drilled blocks box on 4 scrubs
4
Electrical schematics prepared
5
Cable schedule updated PT709, PT712 Vacuum pressures UX15 level 6 FCTIR- 000099 1X3.1 NG42149068 1 connect USA15 level 6 FCTIR- 000096 Vacuum AUSA15 Level 6 2X3.2 2 3X3.3 3 4X3.4 4 PT809, PT812 Vacuum pressures UX15 level 6 FCTIR- 000099 1X3.5 NG42149071 1 connect USA15 level 6 FCTIR- 000096 Vacuum BUSA15 Level 6 2X3.6 2 3X3.7 3 4X3.8 4 TS71x vacuum feedbacks plus spares UX15 level 6 FCTIR- 000099 1X3.9 NG82149074 1 connect USA15 level 6 FCTIR- 000096 Vacuum AUSA15 Level 6 2X3.10 2 3X3.11 3 4X3.12 4 5X3.13 5 6X3.14 6 7X3.15 7 8X3.16 8 TS81x vacuum feedbacks plus spares UX15 level 6 FCTIR- 000099 1X3.17 NG82149075 1 connect USA15 level 6 FCTIR- 000096 Vacuum BUSA15 Level 6 2X3.18 2 3X3.19 3 4X3.20 4 5X3.21 5 6X3.22 6 7X3.23 7 8X3.24 8
6
Box manufacturing in progress
7
Component installation progress
8
What is already done: Box installation location selected and agreed with CRYO Preliminary support design - done Electrical schematics for cable patching - completed IBL general cable schedule updated Box internal design completed What still needs to be done: Install all components inside the box – now (George) Add interconnection box 3D model in Smart Team (Tomek B.) Install box in the cavern (George) Update electrical schematics for the Vacuum system Summary