Trident Replacement: the practical implications
Presentation to British Pugwash AGM 8 April 2008 John Ainslie Coordinator, Scottish CND
2
Trident Replacement Submarine Missile Targeting Warhead
3
“Successor” Submarine
4
New submarine Timeline
2007 2008 2009 2010 2011 2012 2013 2014 Concept Design Initial Design Detail Design Outputs Initial Gate Build Main Gate
5
Nuclear-Powered Submarines
10 12 14 16 18 20 22 24 26 28 Successor MUFC Astute
6
Reactor for “Successor”
Rolls Royce Royal Navy PWR2 P P New Design
7
New Generation Nuclear Propulsion Plant (NGNPP)
“avoid pumped flow systems” Steve Ludham RR “a modern & much simpler plant” Rear Admiral Matthews
8
USS Narwhal (1969 – 1999) When built - quietest submarine
9
Continuous Patrols One armed submarine on patrol at all times
Alert – “measured in days” non-verifiable “our planned future programme should take us up to 750 [patrols]” Rear Admiral Matthews Patrols 300 ? 450 Total 750
10
Infrastructure - Devonport
Refit Dockyard
11
Infrastructure - Derby
Fuel Rod Fabrication
12
Infrastructure - Faslane
Submarine Base and Shiplift
13
Infrastructure - Coulport
Explosives Handling Jetty
14
Infrastructure - Dounreay
Submarine Reactor Prototype & overhaul of coolant pumps
15
The Scottish Question 71 for 16 against 39 abstained 2 did not vote
“the Parliament … calls on the UK Government not to go ahead at this time with the proposal in the White Paper, The Future of the United Kingdom’s Nuclear Deterrent” June 2007 71 for 16 against 39 abstained 2 did not vote
16
If not Scotland where ? 1963 Polaris option - Falmouth
17
Trident Replacement Submarine Missile Targeting Warhead
18
Missile System
19
Underwater Launched Missile System (ULMS)
New US missile to replace Trident D5 In service by 2029 Initial concept studies started in 2007 Considered by Strategic Advisory Group November 2007
20
Missile options British “successor” submarine in-service 2024 – 2060
26 28 30 32 34 36 38 40 42 44 48 50 52 54 56 58 60 British “successor” submarine in-service 2024 – 2060 Trident D5 in service with US Navy until 2042 ULMS & SSBN(X) in service with US Navy from 2029
21
Underwater Launched Missile System
“any successor to the D5 system should be compatible with, or be capable or being made compatible with, the launch system for the D5 missile” Bush to Blair Dec 2006 “concepts for future submarines may have missile tubes larger than 87 inches in diameter” ULMS Test Bed Request for Information 7 Nov 2007
22
Future RV system ? Manoeuvrable Reentry Vehicle (MaRV)
Developed for nuclear Trident (E2 RV) Revived for Conventional Trident Option for ULMS ?
23
Operational independence ?
“without United States cooperation … Polaris would become ineffective after only a few months” Sir Charles Ellworthy, CDS, March 1971
24
Trident Replacement Submarine Missile Targeting Warhead
25
Nuclear Warhead
26
The special nuclear relationship
1958 Mutual Defence Agreement Solly Zuckerman – no interest beyond Polaris Polaris upgrade – to revive relationship Peter Jones – “whether the UK had done it themselves”
27
The first UK thermonuclear bomb
Red Snow warhead Not based on Grapple design Anglicised version of US Mk 28 warhead
28
The Polaris family Polaris Chevaline WE 177
29
Primary Secondary US or UK UK design US design Origin Cleo test W 58
Polaris Jennie Reggie WE 177B Katie Simon WE 177A Katie A Chevaline Harriet WE 177C source:
30
Origin of the UK Trident design
UK design Anglicised US design “The warhead was designed in the UK” Bob Ainsworth Mar 08 “The warheads were anglicised by the AWE” National Archives 1978 – tests of UK lightweight warhead; 50 kiloton yield opened door to details of US designs; 6 further tests Primary uses British High Explosive Secondary probably derived from US design (as with Polaris family)
31
US components in UK Trident warhead
… it was decided on cost-effectiveness grounds to procure certain non-nuclear warhead components from the United States. (Bob Ainsworth) Arming, Fusing & Firing System Neutron Generator Gas Transfer System ?
32
Future of the US nuclear stockplie
Life Extension Reliable Replacement Warhead
33
US Life Extension Programmes (LEP)
B61-7/11 LEP underway W80 LEP cancelled W76 Major LEP
34
US Reliable Replacement Warhead (RRW)
More reliable ? Safer More secure Increased weight and size
35
US Reliable Replacement Warhead (RRW)
Livermore design chosen No funding FY 2008 Advanced Certification Funding request FY 2009
36
US Nuclear Weapon Reviews
Report date Congress Commission 2008 Policy Review 2009 Posture Review 2010
37
Options for British warheads
Life Extension or High Surety Warhead Life Extension underway since 2000 Britain will probably follow US lead
38
New UK High Surety Warhead
Features – IHE, FRP, No Be Design Options Design Previous tests Modified UK Trident None Modified UK TD-127 ?? Anglicised US WR1 US W89
39
Warhead components
40
Reentry Vehicle (RV) case
Life Extension Mk 4 RV Replace some fittings New Warhead Larger Mk 5 RV New production
41
Plutonium pit Life Extension No replacement Lifespan 60 years plus
New Warhead New Pit Fire Resistant
42
Pit Tube Life Extension Replace pit tube
43
Tamper Life Extension Beryllium No replacement New Warhead
Substitute for Beryllium
44
High Explosives Life Extension
US – replace after 30 yrs UK - EDC 37 High Explosive - replace after 16 ? years New Warhead Insensitive High Explosives Safer, Larger & Heavier
45
Detonation System Life Extension Replace detonators New Warhead
Optical initiated firing system
46
Secondary HEU Life Extension No replacement Lifespan 60 years plus
New Warhead New HEU secondary
47
Interstage Life Extension Remanufacture Fogbank New Warhead
Substitute for Fogbank Substitute for Beryllium
48
Radiation Case Life Extension No replacement New Warhead
New simpler design
49
Arming, Fuzing & Firing System
50
Arming, Fuzing & Firing System
AWE vacancy Warhead Electrical Engineer Support the approval programme for the introduction of the system into UK Trident AWE website Support the approval programme for the introduction of the Mk4A AF&F system into UK Trident Beechgrove Recruiting
51
Arming, Fuzing & Firing System
MK4A AF&F key part of US W76-1 warhead upgrade / LEP advanced fuzing options increased targeting flexibility and effectiveness increase the warfighting effectiveness of the D5 system introduced in UK Trident system by 2017
52
Arming, Fuzing & Firing System
Life Extension upgrade to Mk4A New Warhead New design
53
Neutron Generator Life Extension MC4380 introduced 2003 New Warhead
New design
54
Gas Transfer System Life Extension Acorn (UK 2005) Acorn II (LEP)
New Warhead New design
55
Reliable Replacement Warhead
Warhead Timeline 08 12 16 20 24 28 32 36 40 44 48 52 56 W76-0 W76-1 and Reliable Replacement Warhead Initial lifespan New AF&F Refurbished Warhead or High Surety Warhead
56
Modernisation of AWE Aldermaston Orion Laser
57
Hydrus Hydrodynamic Facility
Modernisation of AWE Aldermaston Hydrus Hydrodynamic Facility
58
High Explosives Fabrication Facility
Modernisation of AWE Aldermaston High Explosives Fabrication Facility
59
Uranium Production Facility
Modernisation of AWE Aldermaston Uranium Production Facility
60
Modernisation of AWE Aldermaston Refurbish A90
61
Modernisation of AWE Aldermaston Refurbish A45
62
Modernisation of AWE Aldermaston New Supercomputers
63
Modernisation of AWE Burghfield
New Warhead Assembly & Dissassembly Facility Current Gravel Gerties
64
AWE budget 2005 - 2011 £ million Development Running costs 05/06 06/07
07/08 08/09 09/10 10/11
65
Tritium supply Tritium decays with half-life of 12 years
2006 2054 Tritium decays with half-life of 12 years No current source of UK tritium New facility ? – linked to civil nuclear
66
Lower yield warhead the continued availability of a lower yield from our warhead Future of UK Nuclear Deterrent December 2006 UK Trident warhead – yield fixed at time of manufacture. Future US & UK submarine warheads – possible variable yield.
67
Trident Replacement Submarine Missile Targeting Warhead
68
Targeting system
69
Transfer of US targeting data
UKLO STRATCOM Omaha SACEUR Mons Belgium NOTC MoD London SWS IPT Bath / Corsham OPLAN 8044 information STRATCOM Omaha sanitised
70
Corsham
71
Corsham
72
Cold War bunker for PM and Queen
Corsham Site 3 Cold War bunker for PM and Queen
73
UK Defence Communications Hub
Corsham DCSA HQ UK Defence Communications Hub
74
Corsham Corsham Computer Centre Trident targeting
75
Targeting system Magnetic Tape Cartridge Target Planning (Corsham)
Fire Control (Submarine) Target Change Message
76
Targeting system upgrades
SLBM Retargeting System (SRS) operational in 2003 quickly, accurately & reliably retarget missiles to targets timely & reliable processing of an increased number of targets support adaptive planning US and UK systems
77
Targeting system upgrades
SLBM Planning & Operational Flexibility (SPOF) follow on to SRS funded improve flexibility & responsiveness enhance accuracy and effectiveness application in UK ?
78
Fire Control hardware upgrades
US UK In service Mod 4 Mod 5 2003 Mod 6 Mod 7 2010
79
Targeting software for UK Trident
// Assess system response time suitability F1=beta1]*Obj_Time(targ_indx,sys_indx); //Assess Yield Suitabilty F2=beta[2]*Obj_Yield(yld) //Assess Probability of Kill Suitability for (int k=0; k<fz_opts; k++) [ F0=beta0]*Obj_Pk(targ_indx, cep[k], yld); F3=beta3}*Obj_HOB(targ_indx,sys_indx,k); F4=sys[sys_indx].relia[k]; Fsum=F1*F4*(F0+F2+F3); If(Fsum<min_pk) MIN_PK=Fsum; If(Fsum>max_pk) { max_pk=Fsum; indx=k; { If ((max_pk-mi_pk)< ) Indx=indx_cep; ; opt_index[targ_indx][sys_indx; return(max_pk Software for US target planning & fire control
80
Targeting software for UK Trident
// Assess system response time suitability F1=beta1]*Obj_Time(targ_indx,sys_indx); //Assess Yield Suitabilty F2=beta[2]*Obj_Yield(yld) //Assess Probability of Kill Suitability for (int k=0; k<fz_opts; k++) [ F0=beta0]*Obj_Pk(targ_indx, cep[k], yld); F3=beta3}*Obj_HOB(targ_indx,sys_indx,k); F4=sys[sys_indx].relia[k]; Fsum=F1*F4*(F0+F2+F3); If(Fsum<min_pk) MIN_PK=Fsum; If(Fsum>max_pk) { max_pk=Fsum; indx=k; { If ((max_pk-mi_pk)< ) Indx=indx_cep; ; opt_index[targ_indx][sys_indx; return(max_pk US Eyes Only items removed from code, tables and manuals
81
Targeting software for UK Trident
// Assess system response time suitability F1=beta1]*Obj_Time(targ_indx,sys_indx); //Assess Yield Suitabilty F2=beta[2]*Obj_Yield(yld) //Assess Probability of Kill Suitability for (int k=0; k<fz_opts; k++) [ F0=beta0]*Obj_Pk(targ_indx, cep[k], yld); F3=beta3}*Obj_HOB(targ_indx,sys_indx,k); F4=sys[sys_indx].relia[k]; Fsum=F1*F4*(F0+F2+F3); If(Fsum<min_pk) MIN_PK=Fsum; If(Fsum>max_pk) { max_pk=Fsum; indx=k; { If ((max_pk-mi_pk)< ) Indx=indx_cep; ; opt_index[targ_indx][sys_indx; return(max_pk Sanitised software supplied to Corsham
82
Targeting software for UK Trident
// Assess system response time suitability F1=beta1]*Obj_Time(targ_indx,sys_indx); //Assess Yield Suitabilty F2=beta[2]*Obj_Yield(yld) //Assess Probability of Kill Suitability for (int k=0; k<fz_opts; k++) [ F0=beta0]*Obj_Pk(targ_indx, cep[k], yld); F3=beta3}*Obj_HOB(targ_indx,sys_indx,k); F4=sys[sys_indx].relia[k]; Fsum=F1*F4*(F0+F2+F3); If(Fsum<min_pk) MIN_PK=Fsum; If(Fsum>max_pk) { max_pk=Fsum; indx=k; { If ((max_pk-mi_pk)< ) Indx=indx_cep; ; opt_index[targ_indx][sys_indx; return(max_pk US could cripple software to restrict use
83
Assigned to NATO ? NATO attack less likely independent attack
bilateral attack most likely
84
Closing Points Dependence on US support Early stage of long-term plan
Need greater transparency Endangered species