Download presentation
Presentation is loading. Please wait.
Published byKeanu Dimmitt Modified over 9 years ago
1
1 Beam Test Results of USTC LMRPC modules (50cm) Yongjie Sun presnted by Hongfang Chen
2
2 Outline Long-strip MRPC structure Results of August beam test at GSI Summary
3
3 MRPC structure (endview) 5 x 250μm gaps Readout strips HV 2.5cm Readout strips: 2.5 cm x 50 cm HV electrode: Licron spray ~40 M Ω/ □ Made of window glass of 0.7 mm thick
4
4 MRPC #1 (topview) 55 cm 24.1cm 2.5cm 0.6cm Gaps between strips: 0.6 cm
5
5 MRPC #2 (topview) Top/bottom pcb The readout strips are “ hollowed-out ” alternately. Removed: 5 mm x 4 Left: 1 mm x 5 Removed: 2.5 mm x 9 Left: 0.25 mm x 10
6
6 MRPC #3 (topview) 55 cm 24.1cm 2.5cm 0.7cm Gaps between strips: 0.7 cm (upper part) 0.8 cm (lower part) 0.8cm
7
7 6m Setup Proton Beam Pb 2m 42 cm PMT 1,2 PMT 3,4 PMT 5,6 TSU MRPC USTC MRPC Platform x y
8
8 Photo of the setup
9
9 DAQ Logic TDCTDC QDCQDC PMT 1-4(5) Discriminator NIM ECLVULOM, Logic Delay NIM ECL LMRPC 1-6 (left) 7-12(right) FEE DelayDiscriminatorNIM ECL Delay Gate Trigger area: 2 cm x 4 cm (without back_scint.) STOP
10
10 ADC 1 ADC 2 ADC 3 ADC 4 PMT calibration ADC 1 ADC 2 ADC 3 ADC 4
11
11 ((t 3 +t 4 )-(t 1 +t 2 ))/4 Resolution~67 ps
12
12 T-(t1+t2+t3+t4)/4 ADC ADC MRPC Calibration Intrinsic timing resolution = 67 ps (including momentum spread) HV= 7kV
13
13 Efficiency and resolution plateau 67 ps 97%
14
14 Position scan (±7 kV) No significant efficiency drop in the gap Trigger Area: 2 cm wide From both “ charge sharing ” and cross talk.
15
15 Valid TDCs and valid QDCs (3 sigma above pedestal) Valid TDCs Cross Talk MRPC #1 Trigger on the strip center: “ Cross talk ” at neighbor strips: <~3% Trigger Area: 2 cm wide
16
16 Cross Talk MRPC #2 Valid TDCs and QDCs
17
17 Efficiency vs. Position MRPC #2 Valid TDCs HV= 7kV
18
18 Valid TDCs and valid QDCs (3 sigma above pedestal)
19
19 Cross Talk MRPC #3
20
20 Efficiency vs. Position MRPC #3 Valid TDCs
21
21 Track information using the data of SSD the following analysis is based on the instruction of : Y.P. Zhang,P.-A. Loizeau Data structure of final NTUPLE and a short description about how to use the silicon tracking system the data files used : run_0005.root, run_0006.root,......, run_0020.root, where the USTC-MRPC was settled at the same position. run_0021.root, the MRPC moved by 12mm.
22
22 Hits position profile on MRPC the profile is about 3cm x 2 cm the following analysis will base on these SSD position cuts and charge cuts
23
23 Tranverse profile-- efficiency vs position for MRPC#1 run0005-0020
24
24 Efficiency vs Position for MRPC#1 data file, run_0021.root edge effects 6mm-gap
25
25 Combined data
26
26 Summary The cross talk for neighbour strip ~3% for modules MRPC#1, 2, 3. (50cm strip) Next step 1m long strip Thank You ! 谢谢 !
27
27
28
28 Signal Charge vs Position near the edge of stripat the middle of strip
29
29 Time Resolution of PMT timing ( (t3+t4)-(t1+t2) )/4 after T-A correction Sigma(pmt) = 2.08 *35ps = 73ps
30
30 RPC time resolution cuts: SSD cust PMT cuts resolution: sigma(rpc) = 69 ps 35ps/ch
31
31 Hit tranverse profile position distribution
32
32 pmt resolution vs position ((t3 + t4) - (t1 + t2) )/4
33
33 rpc
34
34 rpc resolution vs position
35
35 eff and reo vs position
36
36 Longitudinal
37
37 edge effects the profile is also quite clear, and we can see that the beam hits between two strips of the MRPC
38
38 (2) pmt cuts: pmt-pair charge: q1+q2, q3+q4 take out 5% at the low range side, and take another 25% at the high range side time difference: T1-T2, T3-T4 2.5%, 2.5% position difference: (T1-T2)-(T3-T4) 2.5%, 2.5% time of flight: ((T3+T4)-(T1+T2))/4 0.5%, 0.5%
39
39 edge effects
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.