Download presentation
Presentation is loading. Please wait.
Published byEmily Maultsby Modified over 9 years ago
1
Work Package 2 / 3 TECHNOLOGIAL & PROCEDURAL HARMONISATION FixO3 General Assembly 14 th to the 16 th October 2014, Heraklion-CRETE ANTARES, CNRS, D.Lefevre, A.Deschamps
2
WP 2 / WP3 – Technological & Procedural Harmonisation Task 2.1:Review of the current status of all fixed observing sites Task 3.1: Assessment of procedures Current status of the Observatory (October 2014) Position: 42°48’N, 6°10’E (West Ligurian Sea) Platforms: Standalone deep mooring (1500-2460m) with 5 sensors levels (P, T, S, O2, current) Two cabled mooring lines 2300m: P, T S O2 et 2000 with IODA (IL12 & IL13) Monthly ship visits: deep CTDO2 profiles, BGC sampling, Under Video Profiler, LISST, LOPC (since 2013) ADCPCamera OM hydrophones CT ADCP KM3NeT DOM hydrophones O2O2 CT LB 14.5m 80m 14.5m 80m 98m
3
payload-parameters (instruments, sensors,…) people involved: N. Bhairy(CNRS), D. Malengros (CNRS), M. Lafont (AMU) ParameterPlatformSensorsDepthAcquisitionTransmission T, S, PMooringSBE2300m600sReal time DOMooringSBE2000m600sReal time CurrentsMooringRDI2000-2400600sReal time DO dynamicsMooringIODA2000m5 dReal time T, S, P, DO, FluoProfilerSBEsurface-bottomMonthlyReal-time DO, nutrients, AT- CT, bacteria Profiler…12 Niskin bottlesMonthlyDelayed Particles (UVP5)ProfilerHydropticsurface-bottomMonthlyDelayed LISSTProfilerSequoia scientific surface-bottomMonthlyDelayed
4
Significant results/highlights during the first year project O2 dynamics @ 2000 m Data Management and Data Access Real Time (parameters): CTD profiles Delayed Mode (parameters): BGC sampling, particles abundance, currents Key persons involved data management for your time-series: D. Lefevre (CNRS), N. Bhairy (CNRS), D. Malengros (CNRS), L. Fleury (CNRS). T. Carval (Ifremer) WP 2 / WP3 – Technological & Procedural Harmonisation Task 2.1:Review of the current status of all fixed observing sites Task 3.1: Assessment of procedures
5
Pre-deployment (procedures in short) Design issues: no Maintenance/service issues (periodic/after failure) Calibration issues: no Preparations: mooring, battery, … Equipment: new SBE37 inductive sensors and inductive Aquadopp sensor for the new mooring WP 2 / WP3 – Technological & Procedural Harmonisation Task 2.1:Review of the current status of all fixed observing sites Task 3.1: Assessment of procedures Operating Scheme/Schematic (with time intervals) IL13 and IL12, deployed since 2007 and 2010 respectively. ALBATROSS-MEUST line deployed in September 2014 RV Tethys II (standalone now) On the field: one year deployment. Next maintenance in April 2015
6
ANTARES – MEUST (West Ligurian) News: An experimental instrumented inductive line has been moored last september. 5 depths are instrumented between 1500 and 2450 m. Delayed mode so far. P T S O2, currents
7
WP 2 / WP3 – Technological & Procedural Harmonisation Task 2.1:Review of the current status of all fixed observing sites Task 3.1: Assessment of procedures Deployment (procedures in short) Means (R/V, ship?, divers, ROV?): R/V Tethys II (CNRS) Maintenance on board: no Testing/Validation: SBE37 ODO, acoustic releaser Deployment procedures: data transfer, CTD profiler calibration (30min, 1000m), sensors cleaning, battery change, trap samples collection, pictures, … Issues: Navy/NATO authorization (zonex)
8
ANTARES – MEUST (West Ligurian) Simplified electrical connector News: An Aanderaa Oxygen optode has been connected to the ANTARES BJS on October 11th 2014. It will be replaced by several TNA sensors, if TNA on this observatory is accepted. Data (Dissolved oxygen and temperature) will be redirected to CORIOLIS Center (http://www.ifremer.fr/co-en/allEulerianNetworks ) during the coming months.
9
WP 3 – Procedural Harmonisation Task 3.1: Assessment of procedures Deployment (procedures in short): ANTARES-GEOPHYSICS Seismometer in place since novembre 2010. No intervention since that time Means : ROV, Antares BJS Maintenance on board Testing/Validation Deployment procedures : should be buried and covered, oriented, levelled and then connected. etc
10
WP 3 – Procedural Harmonisation Task 3.1: Assessment of procedures On the field (procedures in short): ANTARES-GEOPHYSICS Data transfer : by ethernet and seedlink protocol. data are distributed in quasi real time on http://portal.resif.fr (station code : ASEAF, network code: FR)http://portal.resif.fr Surveys : no Emergencies : in case of cut of the power at Antares. BJS powering should be manually restarted. Data post processing : quality check, mainly on the sample datation, metadata prepared at Géoazur Real time data flow integrated for automatic earthquakes analysis (http://www.geoazur.net/sisomazur) in SE France.http://www.geoazur.net/sisomazur
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.