Download presentation
Presentation is loading. Please wait.
Published byEdgar Works Modified over 9 years ago
1
Safety Driven Performance Conference 2013 Capstone RBMI spotlight: Report Server 2008 R2 Chand Paruchuri, MBA PMP Sr. Software Quality Assurance Specialist Jeff Popp IS Consulting Manager Lloyd’s Register Technical Services Inc. 10/10/2013
2
Safety Driven Performance Conference 2013 Safety Moment Emergency evacuation plan Whenever you hear the alarm sound, LEAVE IMMEDIATELY! Always assume it is real until you are told otherwise by the proper authorities. Use stairways, NOT elevators! Do not enter in to evacuated place until it was instructed to do so by proper authorities.
3
Safety Driven Performance Conference 2013 Agenda Introduction Significance of Key Performance Indicator (KPI) Reports Different KPIs in Capstone RBMI New features in SQL Server Reporting Services (SSRS) 2008 R2 upgrade What’s New in SSRS 2008 R2 upgrade & Demonstration Introduction of Report Builder (Jeff) Demonstration of Report Builder (Jeff) Q & A (Chand, Jeff and LR Team) Contact information
4
Safety Driven Performance Conference 2013 Significance of Key Performance Indicator (KPI) Reports Information sharing Provides better visibility Can be used for Decision making
5
Safety Driven Performance Conference 2013 Different KPIs in Capstone RBMI (1 of 4 slides) Total of 33 reports in Lagging & Leading categories Lagging (12): Definition of ‘Lagging’: ‘ To fail to keep up a pace’ Asset Remaining life Based on NDE Only Assets Near Failure - Fractional Wall Loss Closed NCR's by Criticality Closed NCR's by Rank Individual Criticality Report Individual Criticality Report - Multiple Plants Inspections Due Inspections Due - No Date NCR And Reportable Leaks Near Failures Relief Devices Out Of Tolerance Thickness Data Half-Life
6
Safety Driven Performance Conference 2013 Different KPIs in Capstone RBMI (2 of 4 slides) Total of 33 reports in Lagging & Leading categories Leading (21): Definition of ‘Leading’: ‘ Work to be performed in future’ Inspections (13) Overdue Tasks (7) Overdue Tasks by Age Overdue Tasks by Age with Cost Overdue Tasks by Criticality Overdue Tasks by Criticality with Cost Overdue Tasks by Priority Overdue Tasks by Priority with Cost Overdue Tasks by Unacceptable Risk
7
Safety Driven Performance Conference 2013 Different KPIs in Capstone RBMI (3 of 4 slides) Total of 33 reports in Lagging & Leading categories Leading (21) Inspections (13) Scheduled Tasks (6) Scheduled Tasks by Age Scheduled Tasks by Age with Cost Scheduled Tasks by Criticality Scheduled Tasks by Criticality with Cost Scheduled Tasks by Priority Scheduled Tasks by Priority with Cost
8
Safety Driven Performance Conference 2013 Different KPIs in Capstone RBMI (4 of 4 slides) Total of 33 reports in Lagging & Leading categories Leading (21) Overdue Tasks Ratio Overdue Tasks Ratio by Unacceptable Risk NCR's (4) Overdue NCR's by Age Overdue NCR's by Criticality Overdue NCR's by Rank Overdue NCR's by Ratio Risk (1) Unacceptable Risks Shutdown And Planning Report
9
Safety Driven Performance Conference 2013 New features in SSRS 2008 R2 upgrade Report Builder 3.0 is much powerful which include features such as Shared datasets, Collaboration, Data visualization Report Manager enhancements All of the older MS Excel Views, the “vwAll”, have been replicated in the data sets. Significantly improved Performance Our new Reporting Solution provide maximum business value to User
10
Safety Driven Performance Conference 2013 What’s New in SSRS 2008 R2 upgrade(1 of 10 slides) Screenshot of navigation to login Login screen utilize Windows Authentication (Active Directory) so that User is not required to enter User Name, Password.
11
Safety Driven Performance Conference 2013 What’s New in SSRS 2008 R2 upgrade (2 of 10 slides) Screenshot of navigation to Report Server 2008 R2 from Capstone RBMI With just 2 clicks, User can navigate to RS (not required to enter User Name, Password)
12
Safety Driven Performance Conference 2013 What’s New in SSRS 2008 R2 upgrade (3 of 10 slides) Usability Changes UI changed to improve visibility Cleaner UI, easier to navigate portal
13
Safety Driven Performance Conference 2013 What’s New in SSRS 2008 R2 upgrade (4 of 10 slides) Usability Changes Each Report has a convenient actionable menu
14
Safety Driven Performance Conference 2013 What’s New in SSRS 2008 R2 upgrade (5 of 10 slides) Improved Reports Added Plant, Unit, Equipment ID filters Now User get the ‘required’ data only!!!
15
Safety Driven Performance Conference 2013 What’s New in SSRS 2008 R2 upgrade (6 of 10 slides) Improved Subscriptions Ability to filter data with Plant, Unit and Equipment ID parameters
16
Safety Driven Performance Conference 2013 What’s New in SSRS 2008 R2 upgrade (7 of 10 slides) Improved Exporting Ability to Export Reports in to Word format
17
Safety Driven Performance Conference 2013 What’s New in SSRS 2008 R2 upgrade (8 of 10 slides) Create reports from KPIs Ability to download KPIs or custom built Reports directly from RS
18
Safety Driven Performance Conference 2013 What’s New in SSRS 2008 R2 upgrade (9 of 10 slides) Create reports from KPIs (continued) Ability to Modify Report and upload it back to Report Server
19
Safety Driven Performance Conference 2013 What’s New in SSRS 2008 R2 upgrade (10 of 10 slides) Create reports from KPIs (continued)
20
Safety Driven Performance Conference 2013 What’s New in SSRS 2008 R2 upgrade Summary Convenient to customize Reports based on business needs Easy to move Reports from different environments (test, staging, prod) Easy to generate, share Reports of different Plant’s Data Easy to login, navigate, enhanced UI, Menu, Plant parameters, Subscriptions, new Export format, modification of Reports
21
Safety Driven Performance Conference 2013 Report Builder 3.0 Jeff Popp IS Consulting Manager Introduction & Demo
22
Safety Driven Performance Conference 2013 Q & A (Chand, Jeff and LR Team)
23
Safety Driven Performance Conference 2013 For more information, please contact: Vicki Locke, Support Specialist Lloyd’s Register Technical Services Inc. 1330 Enclave Parkway, Suite 200 Houston, TX 77077 T +1 281 649 2248 F +1 281 596 4375 E RBMI.Support@lr.org w www.lrenergy.org Contact information
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.