Presentation is loading. Please wait.

Presentation is loading. Please wait.

DEVELOPMENT OF THE GAS MARKET IN SERBIA AND MONTENEGRO

Similar presentations


Presentation on theme: "DEVELOPMENT OF THE GAS MARKET IN SERBIA AND MONTENEGRO"— Presentation transcript:

1 DEVELOPMENT OF THE GAS MARKET IN SERBIA AND MONTENEGRO
Author: Saša Ilić JP “SRBIJAGAS” 21000 Novi Sad,Narodnog fronta 12 Serbia and Montenegro Athens, November

2 BASIC ACTIVITIES OF NIS – PETROLEUM INDUSTRY OF SERBIA
EXPLORATION AND PRODUCTION NATURAL GAS AND LPG TRANSPORT, DISTIBUTION AND MARKETING REFINERY PROCESSING MARKETING AND TRADE ENGINEERING SERVICES RELATED ACTIVITIES (NON CORE)

3 NIS-PETROLEUM INDUSTRY OF SERBIA
GENERAL DIRECTOR BOARD OF DIRECTORS SUPERVISORY BOARD BOARD OF DIRECTORS EXECUTIVE BOARD -General director -Deputy general director - Assistant general director - Directors of operative divisions NIS-NAFTAGAS NOVI SAD NIS-RNB BEOGRAD NIS-GAS NOVI SAD NIS-FAM KRUSEVAC NIS-ENERGOGAS BEOGRAD NIS-JUGOPETROL BEOGRAD NIS-RNP PANCEVO NIS-NAP NOVI SAD NIS-RNS NOVI SAD NIS-ENGINEERING NOVI SAD

4 JP SRBIJAGAS INVOLVED IN FOLLOWING ACTIVITIES CONNECTED TO NATURAL GAS: TRANSPORTATION, DISTRIBUTION, STORAGE , SYSTEM OPERATING, TRADING NIS-GAS NOVI SAD NIS-ENERGOGAS BEOGRAD

5 MAIN FEATURES OF PIPELINE SYSTEM
PIPELINE SYSTEM OF SERBIA SRBIJAGAS - GAS - Energogas YugoROS gas MAIN FEATURES OF PIPELINE SYSTEM Max. capacity mil. m3 per year Maximum working pressure 50 bar Total length of high-pressure pipeline is 2135 km Dimensions range from DN 150 to DN 750 Average age of pipeline: 25 year 533 metering and regulating stations from 100 to Sm3/h

6 THE CONSUMPTION OF NATURAL GAS IN SERBIA DURING THE PERIOD 1989-2004

7 The Heating Plant and Household share in yearly gas consumption in Serbia

8 NATURAL GAS DEMAND FORECAST FOR THE PERIOD 2000-2010

9 GAS PIPELINE SYSTEM DEVELOPMENT PLAN UNTIL 2010.
CONSTRUCTION OF HIGH PRESSURE PIPELINES UNDERGROUND GAS STORAGE “BANATSKI DVOR” DISTRIBUTION NETWORKS REHABILITATION AND UPGRADING OF EXISTING PIPELINE SYSTEM

10 PLANNED HIGH PRESSURE PIPELINES IN NORTHERN PART OF SERBIA
PIPELINE SYSTEM OF SERBIA PLANNED HIGH PRESSURE PIPELINES IN NORTHERN PART OF SERBIA Planned pipelines in Northern part of Serbia No. DN Length Inch m 1. 30” 30 km 900,000 2. 24” 170 km 4,000,000 3. 20” 70 km 1,400,000 4. 12” 27 km 324,000 5. 10” 84 km 840,000 6. 8 5/8” 37 km 319,000 7. 6 5/8” 40 km 265,000 8. 4 ½” 12 km 54,000 Total 470 km 8 182,000 ESTIMATED COST OF INVESTMENT EUR 82 mil.

11 PLANNED HIGH PRESSURE PIPELINES IN CENTRAL AND SOUTHERN PART OF SERBIA
PIPELINE SYSTEM OF SERBIA PLANNED HIGH PRESSURE PIPELINES IN CENTRAL AND SOUTHERN PART OF SERBIA Planned pipelines in Central and Southern part of Serbia Ref no. DN Length Inch m 1. 28” 248 km 2. 20” 70 km 3. 18 88 km 4. 14” 216 km 5. 12” 68 km 6. 10” 62 km Total 752 km ESTIMATED COST OF INVESTMENT EUR 140 mil.

12 PLANED HIGH PRESSURE PIPELINES FOR AND IN MONTENEGRO
PIPELINE SYSTEM OF SERBIA PLANED HIGH PRESSURE PIPELINES FOR AND IN MONTENEGRO Planned pipelines in Montenegro Ref no. DN Length Inch m 1. 16” 215km 3,440,000 2. 10” 210 km 2,100,000 Total 425 km 5,540,000 ESTIMATED COST OF INVESTMENT EUR 55 mil.

13 BASIC PARAMETERS FOR UNDERGROUND GAS STORAGE CONSTRUCTION
GAS CONSUMPTION IN 1997, 2.6 billion m3 ESTIMATED GAS CONSUMPTION UNTIL 2010, billion m3 DOMESTIC GAS PRODUCTION 300 million m3 DOMINANT IMPORTATION OF RUSSIAN GAS UNTIL 2010 UNEVEN GAS CONSUMPTION DYNAMICS EVEN GAS IMPORTATION DYNAMICS REQUIRED GAS STORAGE FOR 25-30% OF YEARLY CONSUMPTION

14 LOCATION , AND TECHNICAL FETURES OF UNDERGROUND GAS STORAGE
PIPELINE SYSTEM OF SERBIA LOCATION , AND TECHNICAL FETURES OF UNDERGROUND GAS STORAGE SRBIJAGAS - Gas - Energogas - Yugorosgas - Gas Storage CAPACITY : MAX 800 million m3 I phase 300 million m3 INJECTION CAPACITY: max. 7 million m3/day min. 1.3 million m3/day PRODUCTION CAPACITY: max. 10 million m3/day min. 1.6 million m3/day WELL PRODUCTIVITY: max. 0,55 million m3/day min. 0,3 million m3/day

15 PROJECT INVESTMENTS REQUIRED INVESTMENT 128 million EUR
EQUIPMENT AND WORKS 65 million EUR CUSHION GAS 63 million EUR GAS STORAGE IS PLANED TO BE CONSTRUCTED IN TWO PHASES PHASE I 2004./ million EUR EQUIPMENT AND WORKS 7 million EUR CUSHION GAS 43 million EUR PHASE II STAGE million EUR

16 CONSTRUCTION OF MUNICIPAL NATURAL GAS DISTRIBUTION NETWORKS
Distribution network comprise steel pipelines diameter 2”-12” - metering and regulation stations Sm3/h PE pipes diameter d40 - d225 - residential and commercial stations G-4 to G-25 Municipal gas networks could be constructed in more than 80 districts all over the Serbia. The construction of the said municipal networks would allow the connection of households

17 FUNDS FOR MUNICIPAL NATURAL GAS DISTRIBUTION NETWORKS
The construction of the municipal networks would be funded partly from J.P.”SRBIJAGAS” own assets, from credits, and partly by local municipalities and by domestic and foreign qualified partners .  The participation of foreign partner is expected in the realization of this project in technical and financial terms. The construction of municipal networks is planned for the next ten years. The estimated value for the construction of municipal gas distribution networks amounts to EUR 500.mil.

18 REHABILITATION OF THE EXISTING GAS PIPELINE SYSTEM
Goals: to provide reliable and safe gas transportation Modernization of technological systems for: Remote control and surveillance Measurement of the delivered and received quantities of energy Inspection of pipeline with the modern pipeline inspection tools Replacement of battered pipes and equipment on the pipelines Environmental protection Replacement of pipeline section for the purpose of increasing the reliability of transportation. Reconstruction of existing metering and regulation stations. Estimated cost of the investment: EUR 30 mil

19 RECAPITULATION OF INVESTMENTS
HIGH PRESSURE PIPELINES 277 million EUR UNDERGROUND GAS STORAGE “BANATSKI DVOR” 128 million EUR DISTRIBUTION NETWORKS 500 million EUR REHABILITATION AND UPGRADING OF EXISTING PIPELINE SYSTEM 30 million EUR TOTAL 935 million EUR

20 THANK YOU FOR YOUR ATTENTION Saša Ilić SRBIJAGAS Novi Sad, Narodnog Fronta 12 Serbia and Montenegro


Download ppt "DEVELOPMENT OF THE GAS MARKET IN SERBIA AND MONTENEGRO"

Similar presentations


Ads by Google