Drinking Water on Statia No Permanent Sweet Water Sources: Collecting and Storing Rain water Wells (Brackish)
3
Drinking Water on Statia
6
Ave 985 mm/yr
7
Drinking Water on Statia Concordia
8
Drinking Water on Statia Mountain
9
Drinking Water on Statia Golden Rock
10
Drinking Water on Statia Mountain
11
Drinking Water on Statia 1993 - “General Assessment Cistern Water St.Eustatius” (IWACO) 1996 - “Masterplan Drinking Water Supply St.Eustatius” (Intecma) 1997 - 1st Project Proposal (DEPOS) Project Proposal Denied Advisary Note (IWACO) 1998 - Design Cost Approved
12
Drinking Water on Statia 2000 - Tender for Production and Distribution facilities 2000 - 2nd Project Proposal submitted 2001 - 2nd Project Proposal denied 2001 - Project Proposal Temporary Solutions submitted
13
Drinking Water on Statia 2004 - Temporary Solution completed and commissioned: SWRO Water Plant 2x 125 m3/day 250 m3 storage tank by Plant 1000 m3 storage tank on elev. 110m (Lodi) Pressure line to storage tank 2 water trucks Total investment $ 1.350.000,00
14
Drinking Water on Statia
17
2007 - Single Programming Document submitted for 9 th EDF 2009 – Preparation tender Documents 2010 - Tender and Contract Awarding for distribution 2011 - Start execution 2013 - Commissioning distribution
18
Drinking Water on Statia
19
38 km water lines 950 house connections 41 Fire Hydrants 2 pumping stations
20
Drinking Water on Statia
23
kunnen
24
Drinking Water on Statia For the future: Get the residents hooked on drinking water