Download presentation
Presentation is loading. Please wait.
Published byLeonard Doring Modified over 9 years ago
2
Area -10,1km2, Inhabitants – (2013) – 11628
3
Shareholder – Saldus municipality Operation area – Saldus town Activities of Saldus Komunalserviss Ltd: water supply sewerage rainwater sewerages system maintenance Number of personnel – 35 Turnover 2014 – 895 024 EUR
4
Water supply: clients – 8473 inhabitants, - 182 institutions price – 1,21 EUR (incl. VAT)/m3 Sewerage: clients –7908 inhabitants, - 176 institutions price – 1,37 EUR (incl. VAT)/m3
5
Average water production – 1200 m3/day Iron removal plant`s capacity- 3800 m3/day Iron removal plant`s construction year - 2002
6
7 deep wells: capacity – 162 m3/hour, between 90m and 155m deep Water supply pipes – 47km Saldus geographically lowest district is 82m above sea level, highest district is 117m above sea level
7
Wastewater treatment plants construction year - 2001 Wastewater treatment plants clean approximately 2000m3 wastewater and 35m3 septic sludge/day Wastewater treatment plant`s capacity- 3500m3/day 8 pumping stations 1 pumping stations in construction Sewer network – 48km
8
Wastewater treatment plants
9
Receeived equipmentQuantity 1 Computers 2 2 Data retransmission equipment 40 3 Data transmission equipment 179 4Watermeters pulse readers160 5Pressure monitoring equipment25 Additional equipment 7 Flowmeters 2 8 Data retransmission equipment 1
10
Equipment location
11
Pressure monitoring in Water supply network with warnings message
12
Remote reading for Watermeters
14
Flow meters
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.