Presentation is loading. Please wait.

Presentation is loading. Please wait.

Deigning a System.

Similar presentations


Presentation on theme: "Deigning a System."— Presentation transcript:

1 Deigning a System

2 IC2001/4001 System Designs (P23) USB/RS485 Convertor
32 controllers max per RS485 loop RS485 IC2001 E5 IC4001 E5 LAN/WAN Switch TCP/IP Patch RS485 3 controllers max per Cluster. IC2001IP E5 IC4001IP E5 IC2001 E5 IN OUT

3 IC500/1000 System designs (P21) USB/RS485 Convertor
32 controllers max per RS485 loop RS485 IC1000 E3 IC500 E2 LAN/WAN Switch RS485 TCP/IP Patch IC500 E2 x 3 IC1000IP E3 IC500IP E2 IC500IP E2

4 USB/RS485 Convertor RS485 LAN/WAN Switch RS485 TCP/IP Patch
IC1000 E3 IC500 E2 LAN/WAN Switch RS485 TCP/IP Patch IC500 E2 x 3 IC1000IP E3 IC500IP E2 IC500IP E2

5 IC550 POE System Designs (P25)
LAN/WAN POE Switch TCP/IP Patch IC550 IC550 IC550 IC550 IN OUT

6 Galaxy Dimension IP Panel
Galaxy Integration System Designs (P15) IC500IP E2 Galaxy Dimension IP Panel Switch LAN/WAN Switch RS485 TCP/IP Patch IC500 E2 x 3 IC500IP E2 IC500IP E2 IC500IP E2 IC500IP E2

7 IC500 IP System Designs Switch LAN/WAN Switch RS485 TCP/IP Patch
IC500IP E2 IC1604 E1 + EXT/TCP-IP-IR Switch LAN/WAN Switch RS485 TCP/IP Patch IC500 E2 x 3 IC500IP E2 IC500IP E2 IC500IP E2 IC500IP E2

8 IC500 IP System Designs Switch LAN/WAN
IC500IP E2 IC1604 E1 + EXT/TCP-IP-IR Switch LAN/WAN RS 485 Cluster of 2-3 controllers from one IP location, max 1000 m from start to finish, you can mix any controllers in a cluster. Switch RS485 TCP/IP Patch IC500 E2 x 3 IC500IP E2 IC500IP E2 IC500IP E2 IC500IP E2

9 IC500 IP System Designs Switch LAN/WAN
IC500IP E2 IC1604 E1 + EXT/TCP-IP-IR Switch LAN/WAN Any controller can be in a cluster with other controllers, best to have no more then 2 additional controllers in a cluster, so its 1+ 2. Switch RS485 TCP/IP Patch IC500 E2 x 3 IC500IP E2 IC500IP E2 IC500IP E2 IC500IP E2

10 IC500 IP System Designs Switch LAN/WAN Switch
IC500IP E2 IC1604 E1 + EXT/TCP-IP-IR Switch LAN/WAN Switch CAT 6, Patch from switch to IP panel with a 100 m maximum distance. RS485 TCP/IP Patch IC500 E2 x 3 IC500IP E2 IC500IP E2 IC500IP E2 IC500IP E2

11 IC500 IP System Designs Switch LAN/WAN
IC500IP E2 IC1604 E1 + EXT/TCP-IP-IR Switch LAN/WAN Network switch (4,8,16 ways) which can connect to a corresponding number of controllers. Supplied by 3rd party Switch RS485 TCP/IP Patch IC500 E2 x 3 IC500IP E2 IC500IP E2 IC500IP E2 IC500IP E2

12 IC500 IP System Designs Switch LAN/WAN
IC500IP E2 IC1604 E1 + EXT/TCP-IP-IR Switch LAN/WAN IP Single door controller complete with 2 Amp PSU and enclosure (IC500IP E2). Controller requires 240 volts locally. Switch RS485 TCP/IP Patch IC500 E2 x 3 IC500IP E2 IC500IP E2 IC500IP E2 IC500IP E2

13 IC500 IP System Designs IC500IP E2 IC1604 E1 + EXT/TCP-IP-IR Controller for managing additional monitoring points and additional relays (IC1604 E1). Using plug in boards you can expand capability to maximum of 24 inputs. IP connectivity achieved with plug in board. Switch LAN/WAN Switch RS485 TCP/IP Patch IC500 E2 x 3 IC500IP E2 IC500IP E2 IC500IP E2 IC500IP E2

14 Parking Management (P7)
LAN/WAN Switch Parking LOT A IC2001IP E5 Parking LOT B IC2001IP E5 IC500IP E2 IC500IP E2

15 Lift Management (P12) LAN/WAN Switch Lift Controls Lift Cabinet
Reader inside lift L8 IC2001IP E5 + RL12 expansion board. L7 Lift Controls L6 Lift buttons L5 L4 L3 L2 IC500IP E2 IC500IP E2 L1 Lift Cabinet

16 Thank you


Download ppt "Deigning a System."

Similar presentations


Ads by Google