San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-Bid Meeting for Construction Contract 04-0102E4 March 12, 2003.

Similar presentations


Presentation on theme: "San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-Bid Meeting for Construction Contract 04-0102E4 March 12, 2003."— Presentation transcript:

1 San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-Bid Meeting for Construction Contract E4 March 12, 2003

2 SFOBB New East Span Welcome - my name is Sarah Picker
Purpose : networking for business relationships to construct SFOBB East Span Agenda Sign-In Please

3 General collect business cards other cost savings measures handouts
sign-in sheets

4 Welcome Opening Remarks by: Dan McElhinney
Chief Deputy District Director Toll Bridge Program

5 San Francisco - Oakland Bay Bridge
East Span Seismic Safety Replacement Project West Approach West Span Retrofit

6 SFOBB East Span Seismic Safety Project

7 East Span Replacement (Self-Anchored Suspension bridge land foundation, W2) Unofficial Engineer Estimate: $29 million. This contract constructs the western most foundations and columns of the self-anchored suspension bridge at Pier W2 not far from the existing pier E1 on Yerba Buena Island. The work consists of two large excavations in the Yerba Buena rock for the footings, all necessary retaining structures, placement of the structural foundations in the W2 foundation excavations, and construction of the columns up to the bottom of the pier’s cap beam. The steel-framed anchorages within the footings are included in this work, but the cables running between the footings and the superstructure are excluded. Column reinforcing steel will extend above this level, typical of any column pour. (Self-Anchored Suspension bridge marine foundations, T1 and E2) This contract constructs the tower foundation at piers T1 and the eastern most foundations and columns of the self-anchored suspension bridge at Pier E2. The work is in and on the waters of the Bay just to the east of Yerba Buena Island and to the north of the existing bridge. The work will construct pile foundations (called “footings” on the plans) at both piers. The contract will also construct Pier E2 columns. The Pier E2 column concrete will extend up to the bottom of the pier cross beam. Column reinforcing steel at pier E2 will extend above this level, typical of any column pour. This contract will also include the anchor bolts, rods and associated miscellaneous work at Pier T1.

8 Project Limits San Francisco Oakland Project Limits

9 East Span Replacement Contracts
Frame 1 Frame 2 Frame 3 Frame 4 Hinge A Hinge E One Contract Two Contracts Nine Contracts Segment YBI SAS Skyway Oakland Oakland Touchdown Geofill

10 East Span Replacement Contracts
Segment YBI SAS Skyway Oakland Hinge A Hinge E Nine Contracts One Contract Two Contracts Frame 1 Frame 2 Frame 3 Frame 4 Oakland Touchdown Geofill Oakland Touchdown Structures

11 East Span Replacement Contracts
Segment YBI SAS Skyway Oakland Hinge A Hinge E Nine Contracts One Contract Two Contracts Frame 1 Frame 2 Frame 3 Frame 4 1. 04a1701 (R/W) YBI Building Demolition

12 East Span Replacement Contracts
Segment YBI SAS Skyway Oakland Hinge A Hinge E Nine Contracts One Contract Two Contracts Frame 1 Frame 2 Frame 3 Frame 4 1. 04a1701 (R/W) YBI Building Demolition G4 YBI Substation, Viaduct Retrofit

13 East Span Replacement Contracts
Segment YBI SAS Skyway Oakland Hinge A Hinge E Nine Contracts One Contract Two Contracts Frame 1 1. 04a1701 (R/W) YBI Building Demolition G4 YBI Substation, Viaduct Retrofit C4 SAS W2 Substructure E4 SAS E2/T1 Substructures F4 SAS Superstructure Frame 2 Frame 3 Frame 4

14 East Span Replacement Contracts
Segment YBI SAS Skyway Oakland Hinge A Hinge E Nine Contracts One Contract Two Contracts Frame 1 Frame 2 Frame 3 Frame 4 1. 04a1701 (R/W) YBI Building Demolition G4 YBI Substation, Viaduct Retrofit C4 SAS W2 Substructure E4 SAS E2/T1 Substructures F4 SAS Superstructure P4 YBI Transition Structures

15 East Span Replacement Contracts
Segment YBI SAS Skyway Oakland Hinge A Hinge E Nine Contracts One Contract Two Contracts Frame 1 Frame 2 Frame 3 Frame 4 1. 04a1701 (R/W) YBI Building Demolition G4 YBI Substation, Viaduct Retrofit C4 SAS W2 Substructure E4 SAS E2/T1 Substructures F4 SAS Superstructure H4 YBI Transition Structures Q4 USCG Road Relocation

16 East Span Replacement Contracts
Segment YBI SAS Skyway Oakland Hinge A Hinge E Nine Contracts One Contract Two Contracts Frame 1 Frame 2 Frame 3 Frame 4 1. 04a1701 (R/W) YBI Building Demolition G4 YBI Substation, Viaduct Retrofit C4 SAS W2 Substructure E4 SAS E2/T1 Substructures F4 SAS Superstructure H4 YBI Transition Structures Q4 USCG Rd. Relocation R4 South-South Detour

17 East Span Replacement Contracts
Segment YBI SAS Skyway Oakland Hinge A Hinge E Nine Contracts One Contract Two Contracts Frame 1 Frame 2 Frame 3 Frame 4 1. 04a1701 (R/W) YBI Building Demolition G4 YBI Substation, Viaduct Retrofit C4 SAS W2 Substructure E4 SAS E2/T1 Substructures F4 SAS Superstructure H4 YBI Transition Structures Q4 USCG Rd. Relocation R South-South Detour YBI Midden Site

18 East Span Replacement Contracts
Frame 1 Frame 2 Frame 3 Frame 4 Hinge A Hinge E Segment YBI SAS Skyway Oakland One Contract Two Contracts Nine Contracts Skyway Contract No

19 Self Anchored Suspension (SAS)
Hinge A C L Pier W2W C L Tower C L Hinge K C L Pier E2W C L Pier W2 Pier 1 (Tower) Pier E2 Mean Sea Level Elev 0.000 Approx OG along PG Line C4 W2 Structures Bid Opening 4/29/03 E4 E2/T1 Structures Bid Opening 4/15/03 F4 SAS Superstructure Bid Opening 6/03/03

20 Aerial View of Self Anchored Suspension (SAS)

21 Elevation

22 04-0120P4 YBI Transition Structure
Viaduct W2 Transition Structure P Scheduled Bid Opening: 6/22/04

23 YBI Transition Structure

24 04-0120Q4 USCG Road Relocation
USCG Access

25 04-012044 Oakland Touchdown Structures
Possibility of separating this contract into two projects to facilitate SBE: Westbound contract Eastbound contract CL Hinge E Advertise 12/1/ Bid Opening: 3/2/04

26 R4 South-South Detour South-South Detour

27 readvertisement YBI Foundation W2 04-0120C4
a contract to construct Self Anchored Suspension Span Land Foundation W2 advertise 3/17/03 bid opens 4/22/03

28 SAS E2/T1 Structures E4 a contract to construct the Self-Anchored Suspension bridge in-bay foundations, the main tower (T1) and pier E2 just to the east of YBI advertise Jan 21, 2003 bid open April 15, 2003

29 SAS Superstructures 04-0120F4
a contract to construct the tower and superstructure of the Self-Anchored Suspension bridge advertise Feb 3, 2003 bid open June 3, 2003

30 South-South Detour R4 a contract to construct a 580 meter temporary two-level traffic bypass structure Contractor required to design according to criteria, means and methods to be described in advertised documents and to prepare construction plans and specifications advertise 4/7/03 bid open 8/5/03

31 Recap of SFOBB East Span Seismic Safety Project
PIDP Skyway Geofill Archeological Excavation and Midden Site YBI Building Demolition(R/W) SAS W2 Structures C4

32 Recap of SFOBB East Span Seismic Safety Project
YBI Substation & Viaduct Retrofit G4 SAS E2/T1 Structures E4 SAS Superstructures F4 YBI Structures P4 south south detour R4 Q4 New Road for USCG Oakland Touchdown Existing Bridge Demolition

33 SFOBB East Span Today’s discussions relate to the Construction Contract In Bay Foundation T1 and E E4 advertised for bid January 21, 2003 bid opens April 15, 2003

34 Other Introductions Will the Potential Prime Contractors in the room volunteer to raise their hands? Would the DBE certified businesses raise their hands? Would the potential DBE or small businesses raise their hands?

35 San Francisco-Oakland Bay Bridge East Span Seismic Safety Project

36 Branch Chief, Toll Bridge Program
Roadway Items Bob Zandipour Branch Chief, Toll Bridge Program

37 YBI/SAS Contracts Yerba Buena Island T1/E2 foundations (04-0120E4)
Transition structure ( H4) E2 Retrofit/Substation ( G4) T1 SAS superstructure ( F4) W2 foundation ( C4) Building demolition (04A1701) Yerba Buena Island YBI/SAS Contracts

38 Yerba Buena Island Varied topography -- 60 meter elevation change
Steep slopes Narrow winding roads USCG base for 24 hour Search and Rescue unit Lots of underground utilities

39 Environmental Constraints at YBI
Historic Structures USCG Facilities

40 Special Aquatic Site and Trestle Locations- Yerba Buena Island

41 Elevation and Plan

42 Roadway Items Items Description Unit Quantity
Electronic Mobile Daily Diary Computer System Data Delivery LS Lump Sum Transportation for the Engineer LS Lump Sum Construction Surveying LS Lump Sum Pile Corrosion Monitoring System LS Lump Sum Progress Schedule (Critical Path) LS Lump Sum Time Related Overhead LS Lump Sum Prepare Storm Water Pollution Prevention Plan LS Lump Sum Water Pollution Control LS Lump Sum Non Storm Water Discharge LS Lump Sum Turbidity Control LS Lump Sum Temporary Concrete Washout Facility LS Lump Sum Chain Link Fence (Type CL-1.8) M 146 Concrete Barrier (Type K) M 72 Grounding for Pier E2 and T1 Foundations LS Lump Sum Navigation Lighting System LS Lump Sum Strong Motion Detection Downhole LS Lump Sum

43 San Francisco-Oakland Bay Bridge East Span Seismic Safety Project

44 Structure Items Structural Design, Toll Bridge Program

45 Self-Anchored Suspension Bridge (E2 & T1)

46 Self-Anchored Suspension Bridge (E2 & T1)

47 Pile Data

48 Tower Footing – Plan View

49 Tower Footing – Elevation A-A

50 Tower Footing – Elevation B-B

51 Tower Pile Oversized Hole Detail

52 E2 Footing – Plan View

53 E2 Footing – Transverse Elevation

54 E2 Footing – Longitudinal Elevation

55 Tower Footing Details – Steel Framing Plan

56 Tower Footing Details

57 Tower Footing Details – Steel Pile Sleeve

58 Tower Footing Details – Reinforcement Plan

59 Tower Footing Details

60 E2 Footing Details – Steel Framing Plan

61 E2 Footing Details

62 E2 Footing Details – Pile Sleeve Connection

63 E2 Footing Details – Top Reinforcement Plan

64 E2 Footing Details

65 Tower Pile Details

66 E2 Pile Details

67 Pier E2 Elevation

68 Pier E2 Cross Section

69 Tower Anchorage Details

70 Tower Anchorage Details

71 Tower Anchorage Details

72 Tower Anchorage Details

73 Tower Anchorage Details

74 Tower Anchorage Details

75 Tower Anchorage Details

76 Tower Fender Details

77 Tower Fender Details

78 Pier E2 Fender Details

79 Pier E2 Fender Details

80 Quantities UNIT QUANTITY BRIDGE CONTRACT ITEM LIST
2.5 M CAST-IN-DRILLED-HOLE CONCRETE PILING 2.2 M CAST-IN-DRILLED-HOLE CONCRETE PILING (ROCK SOCKET) FURNISH 2.5 M CAST-IN-STEEL SHELL CONCRETE PILING DRIVE 2.5 M CAST-IN-STEEL SHELL CONCRETE PILE 2.5 M PERMANENT STEEL CASING MARINE PILE DRIVING ENERGY ATTENUATOR STRUCTURAL CONCRETE, BRIDGE FOOTING STRUCTURAL CONCRETE, BRIDGE FOOTING (LIGHTWEIGHT) STRUCTURAL CONCRETE, BRIDGE NONSHRINK GROUT NONSHRINK FIBER-REINFORCED GROUT BAR REINFORCING STEEL (BRIDGE) BAR REINFORCING STEEL (EPOXY COATED) (BRIDGE) HEADED BAR REINFORCEMENT FURNISH STRUCTURAL STEEL (BRIDGE) ERECT STRUCTURAL STEEL (BRIDGE) CLEAN AND PAINT STRUCTURAL STEEL MISCELLANEOUS METAL (BRIDGE) MOBILIZATION UNIT M EA LS M3 KG QUANTITY 424 477 1,694 16 423 1 6,471 2,277 1,639 253 66 2,546,120 728,768 3,018 3,958,454 920

81 Business Enterprise Outreach Program
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project This concludes our portion of the presentation. Thank you all for your time and attention. Please write down any questions you may have, and we will respond during the question and answer period after the presentation. Business Enterprise Outreach Program 2003 18

82 Assistant Deputy Director
Civil Rights Olivia Fonseca Assistant Deputy Director

83 Civil Rights Business Enterprise Program
for information about Doing Business with Caltrans Disadvantaged Business Enterprise (DBE) Program Small Business Services Business Enterprise Program call (916) or access Small Business/Disabled Veteran Business Enterprise Services call (916) or access

84 Presented by Kris Kuhl March 12, 2003
SFOBB East Span Replacement Contracts Advertising & Award Process Overview Presented by Kris Kuhl March 12, 2003

85 Purpose of this Presentation
Provide you with information about Caltrans contract advertising and award process for the E2/T1 Foundations (Contract E4) of the San Francisco/Oakland Bay Bridge East Span Replacement Projects Make sure the audience knows that we also want to listen to their suggestions on how we can improve

86 Caltrans Mission Our mission is to improve mobility across California
The Office Engineer contributes to Caltrans mission by providing construction contracts that are: Complete, biddable and buildable Competitively bid Meeting legal requirements Open to all licensed contractors Make the point that our prime contractors must be licensed, but in some cases subcontractors don’t require a license: suppliers and truckers. These types of work are often subcontracted to DBEs.

87 Contract 04-0120E4 Project Goals
This is a federally-funded project The Disadvantaged Business Enterprise (DBE) goal for this project is 8 %.

88 4 Weeks Prior to Releasing Bid Documents
E4 Project Advertising to Award Timeframe Advertised Release Date 1/21/03 Advance Advertising 4 Weeks Prior to Releasing Bid Documents Distribute Bid Documents to Bidders (12 weeks) Open Bids 4/15/03 Award Process Award (30-60 days)

89 Public Bid Opening Bids for this project will be opened and read in a public forum On Tuesday, April 15 at 2 PM in Sacramento in Room 100 at 1120 N Street Immediately Following Bid Opening: Bid amounts will be verified Preliminary bid results posted at (916) and on the Internet ( Bid summaries will be mailed to all bidders Announce Project Engineer's Estimate of cost is announced Small Business Preference is announced (State Only Projects) Each proposal is given a cursory review to make sure each item has a unit price and extended amount filled out, the proposal is signed and a bidders bond is included Total bid for each bid proposal is read out loud We don’t open bids during the Christmas/New Years holiday period, and a few other days during the year

90 This Contract will use A+B Bidding
To determine the lowest monetary bidder, Caltrans will calculate the bid amount as follows: “A” contract items total + “B” number of contract working days bid by contractor multiplied by a dollar amount per day determined by Caltrans A+B will determine the total bid for comparison purposes only

91 Contract Award Process
We anticipate the award process will take days from bid opening Before awarding a contract, we verify: Bid is responsive and complete Bid security is provided and correct All forms are complete and correct Contractor is properly licensed Verify Compliance with DBE requirements Receipt of DBE commitment forms by 4th day All protests addressed Our average award time is 17 days from bid opening

92 Other Requirements Escrow of Bid Documents
The 3 low bidders are to escrow their bid documents on April 22 at 1 PM See the Special Provisions for more information

93 Contract Execution & Approval
After Contract Award Contractor has 8 days to sign and return contract for Caltrans approval Executed Documents (returned) Contract signature page signed Payment and Performance bonds included & signed Signed/Approved by Caltrans Begin Construction!

94 Internet Services Provided
Information on Projects Released for Bid Weekly Advertisements for Bids Electronic copies of project plans & specifications Bidder Assistance Bid Opening and Award Information


Download ppt "San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pre-Bid Meeting for Construction Contract 04-0102E4 March 12, 2003."