Download presentation
1
OTES & OPES DEADLINES/REQUIREMENTS/CHANGES
August 1, 2013
2
REQUIREMENTS IMPROVEMENT OR GROWTH PLAN FOR EVERY TEACHER
(2) TWO, 30 MINUTE OBSERVATIONS WALKTHROUGHS EVERY TEACHER (ORC ) EVERY YEAR EVERY LEA WILL USE ETPES (ORC SECTION G) OPES IS THE “ME TOO” CLAUSE WITH SOME LEINENCY
3
CHANGED PROFICIENT is now SKILLED
4
Evaluation = September 30, 2013 50% 50% Student Growth Measures
Accomplished Skilled Developing Ineffective Performance on the Standards Continuous Improvement Instruction School Operations, Resources and Learning Environment Collaboration Parent and Community Engagement 50%
5
OTES Model- September
6
STAYED THE SAME Value Added remains the same percentage for the same implementation timeline No talk of VA % in the proposals for the Biennium Budget Bill…yet
7
A: Teacher-level Value-Added Data Available
A1. Teacher Instructs Value-Added Subjects Exclusively Teacher Value Added 26-50% LEA Measures 0-24% A2. Teacher Instructs Value-Added Subjects, but Not Exclusively Teacher-Level Value Added Proportional to teaching schedule 10-50% 0-40% LEA Measures Proportional to teaching schedule
8
A: Teacher-level Value-Added Data Available
A1. Teacher Instructs Value-Added Subjects Exclusively Teacher Value Added 50% A2. Teacher Instructs Value-Added Subjects, but Not Exclusively Teacher-Level Value Added Proportional to teaching schedule 10-50% 0-40% LEA Measures Proportional to teaching schedule
9
B: Approved Vendor Assessment Data Available
10
C: No Teacher-level Value-Added or Approved Vendor Assessment Data Available
11
OPES Model- September
12
OPES Implementation NOT dependent on OTES Implementation
Must implement THIS school year – ORC which became law 10/1/12 Standards 2, 3 and 4 ARE appropriate for Assistant Principals and MUST be used Standards 1 and 5 do not have to be utilized within the evaluation ALL FIVE standards must be used for Principal Evaluations ODE’s FAQ for OPES has been updated
13
Category A Principal: Principal Value Added 10-50%
14
Category B Principal:
15
Category C Principal:
16
Aggregate of SGM for Prinicpals
NOT average of averages Composite Value Added “Composite” of Vendor Assessment – requirement of being Approved vendor “Composite” of Student Learning Objectives
17
Combining Teacher/Principal Performance and Student Growth Measures: Evaluation Look-Up Table
Today you read about combining the ratings from observations and walk-throughs using the performance rubric. Once you have combined the ratings, you will have an overall teacher performance rating. On this look-up table, 4 represents accomplished, 3 represents proficient, 2 represents developing, and 1 represents ineffective. In no way are these numbers to be interpreted as scores to replace the wording on the OTES rubric. These numbers are simply placeholders so that the look-up table is easier to read. A final summative rating will be determined when the performance measures and the student growth measures are combined as noted in the Evaluation matrix or Look-Up Table. Walk through samples so people know how to read chart.
18
EDUCATOR EVALUATION TIMELINE
Ohio Teacher Evaluation System (OTES) Timeline Superintendent/Designee Principal Teacher August/September eTPES – District options, complete set-up screens Complete OTES Alignment Tool Verify principal roster Send access to principals eTPES - Verify teacher roster Send access to teachers Begin evaluation process - Growth Plan or Improvement Plan Observation Cycle 1 begins Log into account Begin evaluation process – (Optional and private) complete Self-Assessment Select evaluator if above expected student growth October Observation/Walkthroughs Cycle 1 Approve SLOs or Committee Approval of SLOs Submit SLOs for approval November - April February/ March Enter SGM default percentages for the LEA Review individual principal categories (A,B,C) and modify if needed Completion of Performance Rubric for Cycle 1 Upload artifacts as applicable Observation/Walkthroughs Cycle 2 Completion of Performance Rubric for Cycle 2 March Enter SLO and vendor data April Complete local SGM scoring and report to committee/principal Verify SGM and observation data May Completion of Observation Rubrics by May 1 eTPES- Determine holistic rating for each teacher’s performance and enter Complete/document Final Summative Rating for each teacher Written report to teacher by May 10 June Contract Renewal by June 1 eTPES – Report aggregated teacher ratings to ODE [1] The board must require at least three formal observations of each teacher who is under consideration for non-renewal and with whom the board has entered into a limited contract or an extended limited contract.
19
Ohio Principal Evaluation System (OPES) Superintendent/Designee
OPES TIMELINE Ohio Principal Evaluation System (OPES) Timeline Superintendent/Designee Principal August/September eTPES – District options, complete set-up screens Sign-off on OPES Rubric Alignment Verify principal roster Send access to principals SGM/ eTPES – Review individual principal categories (A,B,C) and modify if needed Begin evaluation process - Growth Plan or Improvement Plan Formative assessment (observation/walkthroughs) begins Log into account Principal (building level) VA will be downloaded Begin evaluation process- (Optional and private) complete Self-Assessment Formative assessment (observation/ walkthroughs) begins October Formative assessment Approve SLOs Submit SLOs for approval November - April February/March Enter SGM default percentages for the LEA Enter SLO and vendor data Upload artifacts as applicable March/ April Complete local SGM scoring and report to committee May Completion of Observation/Performance Rubrics Determine and enter holistic rating for each principal’s performance Enter and verify each principal’s local SGM Complete/document Final Summative Rating for each principal Conduct final review and conference Complete local SGMs and report to superintendent Verify SGM and observation data June Contract Renewal by June 1 eTPES – Report aggregated principal ratings to ODE [1] Annual evaluation of principals ORC – One evaluation annually if contract is not due to expire. In a year an employee’s contract is due to expire, at least a preliminary evaluation and a final evaluation shall be completed.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.