Download presentation
Presentation is loading. Please wait.
Published bySabastian Gascoyne Modified over 10 years ago
1
TP WPM 13.1 D emo environment update TP WPM 13.1 Source: Laurent Velez, ETSI, Laurent.velez@etsi.orgLaurent.velez@etsi.org Meeting Date: 2014-10-08
2
oneM2M Demo Following discussion at TP WPM 13, it has been asked to extent the size of the demos space. The only possibility is to use B1AB + Iris Amphi, in addition to B2 and B3 rooms.
3
Iris Basement 3 B4 B1AB B1B B1A B3 B2
4
Room capacity © ETSI 2014. All rights reserved 4 U BoardclassBoardclassm² Iris B1A1619 2833 32,48 Iris B1B1013 20,72 Iris B220292029 47,67 Iris B320432043 67,83 Iris B419NA19NA 49,00 152182152181 360,04
5
B1AB Demo room
7
Iris Amphi room
9
B2B3 room
10
B2B3 room ( Here B2 zone)
11
B2B3 room (here B3 zone)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.