Craig Collison – District Engineer Jim Curran – ADE Project Delivery Joe McKinnon - Project Manager, Consult. Coord. Rachel Hoff – Project Manager Jeremy Hadrava – Design Engineer Bill Pirkl – Traffic Engineer Todd Vonasek, Shawn Groven – Resident Engineers Jim Bittmann – Materials Engineer Rod Gunderson – Land Management Supv. Roger Hille – Bridge Engineer Darren Laesch – Planning Director
3
Design - Urban Reconstruction & Rural Resurfacing Right of Way – Appraisals, Acquisition & Relocation ICE Traffic Studies Construction Inspection o Supplement staff o Contractor staking Large Bridge Projects ◦ Baudette – TH 72 International Bridge ◦ East Grand Forks – TH 2 Kennedy Bridge
4
Preliminary & Final Design - Urban Reconstruction ◦ Deer River & Bagley – begin design in late 2014 ◦ Hendrum – begin design in early 2015 Construction Inspection ◦ Supplement MnDOT Staff on a more regular basis ◦ Continue with contractor staking Pre-Design Layout & Access Alternatives ◦ TH 11 Corridor, TH 2 Corridor – begin in 2015 Right of Way Assistance ◦ Authorization maps and/or plats – begin in 2015 ◦ Appraisals and Acquisition – on-going
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.