Download presentation
Presentation is loading. Please wait.
Published byErnesto Murch Modified over 9 years ago
1
San Francisco-Oakland Bay Bridge East Span Seismic Safety Project Pier E9 Following the 1989 Loma Prieta Earthquake
2
San Francisco – Oakland Bay Bridge Yerba Buena Island San Francisco Oakland
3
Cantilever Truss Spans (E1-E4) 504 Feet Span Steel Trusses (E4-E9) 288 Feet Span Steel Trusses (E9-23) Main Sections of Existing SFOBB for Dismantling YBI Detour (E1-Tunnel)
4
The Cantilever
7
Quality Schedule Cost
9
Leadership is Present and Strong
10
Cantilever Truss Spans (E1-E4) 504 Feet Span Steel Trusses (E4-E9) 288 Feet Span Steel Trusses (E9-23) Main Sections of Existing SFOBB for Dismantling YBI Detour (E1-Tunnel)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.