Presentation is loading. Please wait.

Presentation is loading. Please wait.

A GENDA 1. B ACKGROUND On July,2001,China acquired the right to host the 2008 Olympics Visitors increase rapidly, so the original terminals(T2&T3) were.

Similar presentations


Presentation on theme: "A GENDA 1. B ACKGROUND On July,2001,China acquired the right to host the 2008 Olympics Visitors increase rapidly, so the original terminals(T2&T3) were."— Presentation transcript:

1 A GENDA 1

2 B ACKGROUND On July,2001,China acquired the right to host the 2008 Olympics Visitors increase rapidly, so the original terminals(T2&T3) were difficult to cope with the excess flights A s the gate to the nation, it will provide visitors the first impression of China 2

3 5 floors above ground, 2 below International flights Links T3A and T3B in 3 minutes 3km long, about 0.98 million square meters of floor space 120 gates and 73 parking bays added, and plus the third runway Over 19000 bags an hour, and the luggage can be retrieved within 5 minutes of planes unloading Main entrance, check-in and domestic flights Rail station linked to Beijing subway and car park with 7000 spaces 3

4 T OP 10 AIRPORTS BY PASSENGER NUMBER IN 2011 1 2 3 4

5 I NTRODUCTION T3A T3B T3C 5

6 S CHEDULE 6 200320042005200620072008 Foster company win the contract Design of the T3 had done Migrated the residents in 熙攘 Construction of T3A and T3B started on 3/28,2004 Construction of T3 C started on March.2006 Operation commenced on February, 2008 Time Events

7 C HARACTERISTIC The entire construction just like a dragon The roof looks like the dragon scales The roof of T3 is red, the Chinese color for good luck The roof of T3 has dozens of triangular windows to let in daylight The longest cantilevered entrance in the world The biggest luggage handling system in the world 7

8 REFERENCE 8 http://www.360doc.com/content/12/0520/20/0_212 380580.shtml http://www.arup.com/Home/News/2008- 02%20February/27-02-08- Gateway_to_the_Olympic_Games_opens_in_Beiji ng.aspx?sc_lang=zh-TW http://w3.siemens.com/market- specific/global/en/airports/baggage_cargo/Docume nts/beijing_airport_bagg_handl_sys_en.pdf https://www.siemens.com/innovation/en/publikati onen/publications_pof/pof_fall_2007/factories_of_t he_future/beijing_airport.htm

9 REFERENCE http://www.soku.com.tw/%E5%8C%97%E4%BA% AC%E9%A6%96%E9%83%BD%E5%9C%8B%E9 %9A%9B%E6%A9%9F%E5%A0%B4/ http://baike.baidu.com/view/1741231.htm http://www.baike.com/wiki/%E5%8C%97%E4%B A%AC%E9%A6%96%E9%83%BD%E5%9B%BD% E9%99%85%E6%9C%BA%E5%9C%BA3%E5%8F %B7%E8%88%AA%E7%AB%99%E6%A5%BC http://en.wikipedia.org/wiki/Beijing_Capital_Inte rnational_Airport 9


Download ppt "A GENDA 1. B ACKGROUND On July,2001,China acquired the right to host the 2008 Olympics Visitors increase rapidly, so the original terminals(T2&T3) were."

Similar presentations


Ads by Google