Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 Objective  Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope  6 Contracts - 11.4km of 2.2m,

Similar presentations


Presentation on theme: "1 Objective  Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope  6 Contracts - 11.4km of 2.2m,"— Presentation transcript:

1 1 Objective  Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope  6 Contracts - 11.4km of 2.2m, 11.2km of 1.6m, & 7.2km of 1.2m dia pipelines ContractScheduleRemarks 1, 2 & 3Tenders calledTenders under evaluation 5 & 6May 20104.2km of 2.2m dia pipeline along Pioneer Road by pipe jacking 4June 20103.6km of 6m dia segmental tunnel with twin 2.2m and 1.2m dia pipelines NEWater Infrastructure Plan Extension to Jurong Island (NIPE)

2 2 C5 & 6 C4 C1, 2 & 3

3 3 6 M ID Tunnel 2.2m dia Potable Water Pipeline 2.2m dia NEWater Pipeline Support 1.2m dia Potable Water Pipeline Support 1.2m dia NEWater Pipeline 6m dia Tunnel NEWater Infrastructure Plan Extension to Jurong Island (NIPE) TYPICAL SECTIONAL VIEW OF PIPELINES FOR NIPE CONTRACT 4


Download ppt "1 Objective  Extend NEWater transmission mains to Jurong Island to meet increasing NEWater demand by industries Scope  6 Contracts - 11.4km of 2.2m,"

Similar presentations


Ads by Google