Location
3
Overview Large Buffer Zone and Controlled Remote Property for Hazardous Testing Moderate Desert Climate Ideal for Year-round Testing Existing Environmental Permits in Place for Hazardous Testing
4
Overview Constructed in 1962-64 to Support Apollo Project
Subsidiary Unit of NASA Johnson Space Center Occupies 28 square miles of the SW Corner of WSMR Annual Budget is ~ $90 Million ~ 60 NASA and ~ 630 Contractor Personnel
5
Organization Chart
6
Mission Statement Our mission is to provide the expertise and infrastructure to test and evaluate spacecraft materials, components, and propulsion systems to enable the safe exploration and use of space.
7
Customer Base Johnson Space Center - Shuttle Orbiter, Payloads, International Space Station, Crew Training, Constellation Program, and Special Projects NASA Headquarters and Other Field Centers Other US Government Agencies - Army, Navy, Air Force, DOD, DOE, EPA Commercial Industry
8
Shuttle: Test and Evaluation
9
ISS: Test and Evaluation
10
Constellation: Test and Evaluation
Materials and Components Evaluation Propulsion Systems Development Orbital Debris COPV
11
Constellation Launch Facility Design and Construction
Support Launch Operations Row Control Engine Test Development Peacekeeper 4-stage Hardware Harvesting
12
Non-NASA Air Force Navy Army and DOE Industry
Peacekeeper 4th Stage Demilitarization Minuteman Upper Stage Life Tests Mobile Oxygen Storage Tanks Navy Material Offgassing Tests Army and DOE Support Services, Cleaning, Calibration Industry Pratt And Whitney - Engine Development Tests Aerojet - Engine Tests SpaceX - Material Oxygen Compatibility Test Wendell Hull Associates - Material/Components Oxygen Compatibility Test ASTM G4 Community - Material/Components Oxygen Compatibility Test
13
Facilities Rocket Engine System Test Stands with Vacuum
Long-duration Large-altitude Simulation System Full-scale Hypergolic and Cryogenic Propulsion Test Systems Chemistry and Metallurgical Laboratories Flight Component Repair, Refurbishment, and Test Facilities High Energy Blast Facility Oxygen-enriched Atmosphere Test Facilities Hypergolic Materials and Components Test Facilities Hypervelocity and Low Velocity Impact Test Facilities White Sands Space Harbor Launch and Landing Site
14
Laboratories Test
15
Laboratories Test Micrometeoroid/Debris Hypervelocity Impact Testing
Propellant and Explosion Hazards Assessment Research on Flammability of Materials including Metals in Oxygen-enriched Atmospheres
16
Laboratories Test Components Failure Test and Analysis
Molecular Analysis of Surface Effects using X-ray Photoelectron Spectroscopy
17
Hardware Processing Critical Flight Hardware Assembly
Flight Critical System Components Refurbishment Flight Hardware Production
18
Hardware Processing Precision Cleaning of Flight Critical Items
Industrial and Scientific Imaging and Documentation Measurement Standards and Calibration Lab
19
Propulsion Test Shuttle PRCS Thruster Hot-fire Testing
Cassini – Saturn Orbit Insertion Engine Glows during 3-h 20-min Continuous Firing Minuteman Qualification Firing inside Vacuum Test Cell
20
Night Firing of Shuttle Forward RCS Primary and Vernier Thrusters
Propulsion Test Night Firing of Shuttle Forward RCS Primary and Vernier Thrusters
21
Propulsion Test Static Firing of DC-X with 4 LOX/Hydrogen
RL10-A5 Engines DC-X Executes Vertical Landing at WSMR
22
White Sands Space Harbor
Orbiter Approach and Landing Training Facility Restricted, Controlled Airspace Long, Wide Lakebed Runways Year-round Flying Weather No “Bird-strike” Problems
23
White Sands Space Harbor
Landing Training for Astronauts Landing/NAVAID Development Procedure Development Contingency STS Landing Site Training Aircraft Hangared at El Paso Airport Scheduled 250 Days for Flight Time Average 190 Days Flown
24
Alternative Energy WSTF Renewable Energy Program Wind Power
Class 4 – 5 Wind Site Install 3 – 4 MW to Provide Energy to WSTF (NASA funded) Install 70 – 100 MW (third party investor) Challenges: Construct a Road up the Mountain WSMR land (lease third party investor) Funding Solar Power Southwest has Great Potential for Solar Install at least 1 MW for WSTF (NASA funded, NASA land) Install 100 MW (third party investor) Challenges: Resolve BLM Land Issues (third party investor)
25
Educational and Community Outreach
NASA Explorer Schools in New Mexico Design Competitions FIRST Robotics Program New Mexico MESA and MESA USA Schools & Regional Science and Engineering Fairs Science Education Alliance and the SCIAD Program Educational Tours of WSTF DC-9 Microgravity Fly High Program X PRIZE and International Symposium for Personal Spaceflight Las Cruces Chamber of Commerce Military Affairs Committee Dona Ana County Spaceport Educational Initiative Hydrogen Technology Partnership (HyTeP) Oxygen and Hydrogen Safe System Operations Training to NMSU and area hospitals Space Alliance Technology Outreach Program (SATOP)
26
Economic Impact of WSTF Installation
NASA White Sands Test Facility Families 600 Payroll $29.2 Million Total Contract Value $58.0 Million Budget $86.7 Million Local Area Purchases and Subcontracts Other New Mexico $1,641,879 Las Cruces $1,430,069 El Paso $1,276,890 Albuquerque $ 834,820 Alamogordo $ ,788