Presentation is loading. Please wait.

Presentation is loading. Please wait.

Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised.

Similar presentations


Presentation on theme: "Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised."— Presentation transcript:

1 Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised Cargo Liner Test IAMFTWG, Savannah, GA Tim Marker, FAA Technical Center March 1-2, 2011

2 2 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 2 Saudi Arabia Airlines L-1011 Accident, 1980

3 3 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 3 School-Bus Tests at FAATC

4 4 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 4 Cargo liner Flame Penetration Test Using Oil Burner

5 5 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 5 Possible New Appendix F Structure Appendix F Part I: Requirements for In-Flight Fire Threats Appendix F Part II: Requirements for Postcrash Fire Threats A. Radiant Panel (insulation, ducting, wiring, composite fuselage) B. Oil Burner – cargo liner C. Fire Containment D. Bunsen burner A. OSU B. Oil Burner – seats C. Oil Burner - insulation D. Escape Slide radiant heat E. Oil Burner – seat structure

6 6 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 6 X.1 Scope X.2 Definitions X.3 Apparatus X.4 Test Specimens X.5 Specimen Conditioning X.6 Preparation of Apparatus X.7 Flame Calibration X.8 Procedure X.9 Alternate Methodology for Testing Cargo Liner Design Details X.10 Report X.11 Requirements Part IB. Oil Burner Test for Cargo Liners

7 7 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 7

8 8 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 8 Figure X-1. Test Apparatus for Horizontal and Vertical Mounting for Cargo Liner Oil Burner Testing

9 9 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 9 Figure X-2. Cargo Liner Test Specimen Frame Figure X-3. Cargo Liner Test Specimen Retaining Frame

10 10 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 10

11 11 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 11 Figure X-4. Top and Side View of Thermocouple Rake Bracket X.3.3 Thermocouples The seven thermocouples to be used for calibration will be 1/16-inch (1.6-mm) ceramic packed, metal sheathed type K (Chromel-Alumel), grounded junction thermocouples with a nominal 30 AWG size conductor. The seven thermocouples will be attached to a steel angle bracket to form a thermocouple rake for placement in the test stand during burner calibration, as shown in figure X-4 (discuss possibility of switching to 1/8 inch thermocouples).

12 12 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 12

13 13 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 13

14 14 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 14

15 15 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 15

16 16 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 16

17 17 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 17

18 18 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 18

19 19 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 19

20 20 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 20

21 21 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 21

22 22 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 22

23 23 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 23 X.9.2.2 Seams, Joints, Fastening Systems Located in Compartment Sidewall Seams or joints formed by butting or overlapping liner materials (including all associated fasteners) located in the sidewall position of the cargo compartment shall be tested in the vertical test specimen mounting frame. The seam detail shall be positioned longitudinally, 2 inches from the top of the vertical test specimen liner edge (Figure X-8). Some sidewall seam or joint details may be too wide to fit into the vertical specimen area without clearance issues. This can be rectified by moving the seam detail lower, provided the upper edge of the detail is situated 1.5 inches from the top edge (Figure X-9). Follow test procedures specified in X.8.1 through X.8.9.

24 24 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 24

25 25 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 25

26 26 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 26

27 27 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 27

28 28 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 28

29 29 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 29

30 30 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 30

31 31 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 31

32 32 of 30 Federal Aviation Administration Task Group Session on Cargo Liner Test March 1, 2011 32 Planned Activities Complete construction of apparatus using sonic burner parts from Marlin Engineering Conduct temperature calibrations with set-up parameters obtained from seat burner trials Begin test trials using various cargo liner samples from Mc Gill: Type 1076D, woven fiberglass cloth reinforced polyester cargo side wall liner (BMS 8-2).020 and.045 thickness, used in 737 models Type 1367A 040, woven fiberglass cloth reinforced phenolic, high impact resistant, low smoke and toxicity cargo liner with white Tedlar® on the face side. Qualified to Boeing specification BMS 8-223 Cl 2 Gr B Types 13 thru 40, McDonnell Douglas DMS 2419 Cl 1 (Ty 13-40), and Airbus 2550 M1M 000800; used in 757 models Compare results with FAATC Park burner apparatus Conduct Round Robin?


Download ppt "Presented to: By: Date: Federal Aviation Administration International Aircraft Materials Fire Test Working Group Meeting Task Group Session on Revised."

Similar presentations


Ads by Google