Download presentation
Presentation is loading. Please wait.
Published byDaisy Lockhart Modified over 9 years ago
1
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Route 27 / Route 244 Bridge Design Aesthetic Considerations VDOT Project Number: 0027-000-V01, PE 101 June 28, 2006
2
RT. 27/ Rt. 244 Bridge Study June 28, 2006 The following PowerPoint Presentation includes: 1. Examples of newly constructed bridges built by VDOT and by Arlington County. 2. Alternative concepts for Design Elements that could possibly be included in the proposed new Route 27/ Route 244 Bridge.
3
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Aerial
4
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Design Considerations: Structure: Steel Girder Parapet Design Abutment Walls Memorial Columns Freedman Theme – Memorial Medallions Curvature in Horizontal Alignment of the Bridge
5
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Veterans Bridge Location: Springfield, Virginia
6
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Bronze Medallions set into concrete
7
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Opportunity for artwork Small amounts of colors can add significant aesthetics to the design.
8
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Veterans Bridge
9
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Veterans Bridge
10
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Veterans Bridge
11
RT. 27/ Rt. 244 Bridge Study June 28, 2006 I-66 Pedestrian Plaza Location: Rosslyn, Virginia
12
RT. 27/ Rt. 244 Bridge Study June 28, 2006 I-66 Pedestrian Plaza/ Arlington Gateway Park
13
RT. 27/ Rt. 244 Bridge Study June 28, 2006 I-66 Pedestrian Plaza/ Arlington Gateway Park
14
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Route 60 Pretty Lake Bridge Location: Norfolk, Virginia
15
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Rt. 60 / Pretty Lake Bridge
16
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Rt. 60 / Pretty Lake Bridge
17
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Rt. 60 / Pretty Lake Bridge
18
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Rt. 60 / Pretty Lake Bridge
19
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Example of Pre-cast Concrete
20
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Example of Pre-cast Concrete
21
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Rt. 60 / Pretty Lake Bridge
22
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Rt. 60 / Pretty Lake Bridge
23
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Rt. 60 / Pretty Lake Bridge
24
RT. 27/ Rt. 244 Bridge Study June 28, 2006 George Washington Memorial Parkway / Humpback Bridge National Park Service Location: Washington, D.C.
25
RT. 27/ Rt. 244 Bridge Study June 28, 2006 George Washington Memorial Parkway / Humpback Bridge
26
RT. 27/ Rt. 244 Bridge Study June 28, 2006 George Washington Memorial Parkway / Humpback Bridge
27
RT. 27/ Rt. 244 Bridge Study June 28, 2006 George Washington Memorial Parkway / Bicycle Bridge
28
RT. 27/ Rt. 244 Bridge Study June 28, 2006 George Washington Memorial Parkway / Bicycle Bridge
29
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Conceptual Design for the Restoration of the Richmond Canals Historic Richmond Foundation Location: Richmond, Virginia
30
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Restoration of the Richmond Canals
31
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Restoration of the Richmond Canals
32
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Restoration of the Richmond Canals
33
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Historic Jamestowne Island - Entrance Sign
34
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Example of Form Liner Use
35
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Example of Form Liner Use Cast in place Base Wall
36
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Example of Form Liner Use Precast Cap
37
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Example of Form Liner Use
38
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Colonial Williamsburg Visitor Center Pedestrian Bridge Williamsburg, Virginia
39
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Pedestrian Bridge
40
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Pedestrian Bridge
41
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Site Photos
42
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Existing Bridge
43
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Existing Bridge
44
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Existing Bridge - Signage
45
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Existing Bridge
46
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Existing Bridge
47
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Existing Stone Wall
48
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Local Neighborhoods
49
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Conceptual Bridge Design
50
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Column Design #1 Cast in Place Pre-cast Concrete
51
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Column Design #2
52
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Column Design #3
53
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Column Design #4
54
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Parapet Option #1 Create Shadows Cast In Place Steel Girder
55
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Parapet Option #2
56
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Parapet Option #3 Form Liner
57
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Parapet Option #4
58
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Parapet Option #5
59
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Various Column Shapes Rt. 244
60
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Various Column Shapes Rt. 244
61
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Column Elevation Bridge Construction is independent of Memorial Pylon Construction Architectural Pre-cast Concrete Cladding attached to poured in place concrete column.
62
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Bridge Elevation
63
RT. 27/ Rt. 244 Bridge Study June 28, 2006 Bridge Elevation
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.