Item 5.h - Authorization to Advertise the Repairs to the Glorietta Bay Pump Station Project for Bid
2
Glorietta Bay Pump Station Inflow from NAB (pumped) Inflow from the Cays (pumped) Gravity Flow from the Shores
3
Glorietta Bay Pump Station Repair/Maintenance Needed – Pump rails – Pump(s) Station has 4 pumps; one is a redundant pump One is currently non-operational and can’t be removed because the lifting handle has deteriorated – Interior piping – Sludge removal – Lining/Structural repairs
4
Recommended Action Authorize staff to advertise the pump station repairs including: (wet-well by-pass not required) – Repair of rail system – Repair of pump(s) – Removal of built-up sludge – Evaluation of liner and structure – Evaluation of the discharge piping – Work to be completed by May 31, 2013 Phase II of the project would be repairs to the concrete and wet well liner (wet-well by-pass required) – Work would not commence until after summer 2013
5
Photos of the Wet Well
6
Photos of the Wet Well (cont.)