Download presentation
Presentation is loading. Please wait.
Published byAliyah Darnley Modified over 10 years ago
1
Project Mission To manage the successful delivery of the investment.
2
ABOUT US Shilpa Construction Pvt. Ltd. is Since 1998 in Construction Industries. We are pleased to introduce ourselves as one of the leading Gujarat based construction. We are leading construction company certified with Quality Management System for Construction Management and Project Execution of Industrial, Commercial and Residential Civil and other ancillary constructions. We also undertake entire project work on Turnkey basis. We are also registered as approved contractor many companies in Gujarat as well as Central Government. We have adequate infrastructure to execute the work with modern technology. Our management includes well qualified, experienced, devoted and committed team of experts, engineers & supervisors. All our prestigious projects had been completed within stipulated schedule to the entire satisfaction of our clients and consultants without compromising on quality at any stage, to the entire satisfaction of consultants / clients. We are dynamically changed, possessing the ability to face any challenge offered by the construction industries. Director Mr. Anil Padmani
3
YEAR OF ESTABLISHMENT:1998 REGISTERED OFFICE:41, Payal Park Society, Satellite Road, Jodhpur Tekra, Behind Star India Bazar, Near Ohm Tower, Satellite, Ahmedabad 380015. Gujarat. DIRECTOR:1. Mr. Hirjibhai K. Padmani 2. Mr. Anil Padmani C.S.T. No.:24573801113 Dated : 28.09.2005 TIN No.:24573801113 Dated :28.09.2005 SERVICE TAX REG. No.:AADCS9884JST001 CATEGORY OF SERVICE:Construction Services in Respect of Commercial or Industrial Buildings And Civil Structure. PAN No.:AADCS9884J. PF REGISTRATION NO.:GJ/PCF/AHD/28178. ISO 9001: 2008 Certificate No.141229019107 BASIC INFORMATION
4
Sr.No.Name of ClientLocation 1Bharat Petroleum Corporation LimitedRajasthan. ( Udaipur, Jodhpur, Jaipur ) 2Reliance Industries LimitedGujarat. 3Reliance Aviation StationGujarat. 4IPR ( Institute for Plasma Research )Gandhinagar. 5KAPP ( Kakrapar Atomic Power Station )Vyara, Kakrapar. 6ISRO ( Indian Space Research Organization )Ahmedabad. 7OM Entertainment.Ahmedabad. 8GSPC ( Gujarat State Petroleum Corporation Limited )Gandhinagar. 9GPPC ( Gujarat State Pipavav Power Corporation )Pipavav, Guajarat. 10LIPL ( Reliance APLG Plant )Sanand. 11JPPL ( Jaishree Propack Pvt. Ltd. Jaishree Group )Ahmedabad. 12REL (Raghuvir Exim Limited)Laxmipura, Ahmedabad. 13REL (Raghuvir Exim Limited)Pipalaj, Ahmedabad. 14Nisan ElectricalsMoraiya, Ahmedabad. COMPLETED PROJECTS
5
Sr.No.Name of ClientLocation 1J.P. DevelopersLambha, Ahmedabad. 2Surya Real Infra Pvt. Ltd.Ahmedabad. 3Sutariya DevelopersGandhinagar. 4Raghuvir Exim Pvt. Ltd. Corporate officeAhmedabad. 5Raghuvir Exim Pvt. Ltd. ResidenceAhmedabad. 6Bony Polymers Pvt. Ltd.Viramgam OUR CLIENT ONGOING PROJECTS
6
Sr.No.EquipmentYear of Manufacturing CapacityNumbers 1Self Loaded Transits Mixture - Macons20144.00 Cum1 No. 2Reversible Mixer Machine20123 bags.4 Nos. 3Concrete Mixture Machine201010/7 Cft..8 Nos. 4Weight Batcher201010/7 Cft..2 Nos. 5Lift20104 Nos. 6Vibrator201018 Nos. 7Plate Vibrator20106 Nos. 8Floater Machine20104 Nos. 9Concrete Pump20121 No. 10Bar Bending Machine20104 Nos. 11Bar Cutting Machine20104 Nos. 12Generator Set201075 KV2 Nos. 13Generator Set201262 KV2 Nos. 14Tractor20093 Nos. 15JCB Excavator2006 / 092 Nos. 16Road Roller200710 Ton1 Nos. 17Earth Compactor20087 Nos. PLANT & MACHINERIES
7
Sr.No.EquipmentYear of Manufacturing CapacityNumbers 18Trolley loader200812 No. 19Total Station survey20101 No. 20Theodolite20102 Nos. 21Dumpy Level20105 Nos. 22Concrete Testing Machine20122 Nos. 23Slump Cone20098 Nos. 24Aggregate Testing Sieve set2006 / 096 Nos. 25Cube mold200766 Nos. 26Core cutter mold200812 Nos. 27 Steel Acrow Span with Acrow Plates20101500 Sqm1500 Sqm. 28 Steel Plates, Props, H-frames 2006-1111000 Sqm11000 Sqm. PLANT & MACHINERIES
8
Mr. Anil Padmani Director Mr. Anil Padmani Director Mr. Hirjibhai Padmani Director Mr. Hirjibhai Padmani Director Mr.Vasanthai Padmani Director Mr.Vasanthai Padmani Director ENGINEER DEPARTMENT Sr.Project Engineers ACCOUNT DEPARTMENT ACCOUNT DEPARTMENT HR DEPARTMENT HR DEPARTMENT EHS DEPARTMENT EHS DEPARTMENT Mr. Sunny Patel Mr. Dilip Vekariya Mr. Narendra Padmani Safety Officer Mr. Narendra Padmani Safety Officer Mr. Nilay Nayak Sr. Accountant Mr. Nilay Nayak Sr. Accountant Mr. Raj Jayani HR Officer Mr. Raj Jayani HR Officer Mr. Pranay Gohel Mr. Ravi Bhalu Mr. Jayesh Patel Mr. Chirag Karena Mr. Pankaj Gajjar Project Engineers Mr. Kamlesh Sojitra Mr. Rajesh Dodiya Project Manager Mr. Rajesh Dodiya Project Manager Mr. Rakesh Kishnath Mr. Hrutvik Banker Forman Mr. Deepak Parmar Supervisor Mr. Ashish Vekariya Mr. Jignesh Patel Mr. Hardik Bhalara Mr. Ankit Ramani Mr. Madhu Choudhary Electrical Engineer Mr. Swarup Patel Mr. Mehul Patel 3 Electrician 5 Safety Steward SCPL TEAM
9
Project Planning Bar Chart Making & Scheduling of Item Bar Chart Making & Scheduling of Item Land Survey & Demarcation of Buildings Land Survey & Demarcation of Buildings Site Survey Recourse Planning Mobilization of Safety Equipment & Barricading the site premises Mobilization of Safety Equipment & Barricading the site premises Mobilization of Plant, Machineries, Materials & Manpower Establishment of Site Office & Labour Camp Establishment of Site Office & Labour Camp Construction as per Drawing & Detail Possession of Buildings WB Structure WB Structure Contract Finalization Drawing & Detail FLOW OF SERVICES
10
OUR CLIENT Contracting Feasibility Study Business License ProjectRegistration Permitting Certifications Design Geological Surveys Engineering Demolition & Renovation Civil & Structural Works Construction Works Finishing Works Site Development Commissioning Scheduling Accounting Documentation & Reporting ContractControlling Cost Control Budgeting & Estimations Quality Management (ISO 9001:2008) Project Management Consulting Terms of Reference & Specifications Expediting Site Survey & Layout Site Work Supervision Safety Management Tendering Piling & Foundation Works SUPPORT - SERVICE – RESULTS !!!
11
Client :JAYSHRI PROPACK Pvt. Ltd. Project : Construction of Factory Building and Administrative Block at Tejpur Road, Changodar, Ahmedabad Work Order No.:SCPL/JPPL/01 Year :2009 Time Period: 12 Month Project Cost:11.2 Crore Consultant :Hiren Patel & Architect Client :JAYSHRI PROPACK Pvt. Ltd. Project : Construction of Factory Building and Administrative Block at Tejpur Road, Changodar, Ahmedabad Work Order No.:SCPL/JPPL/01 Year :2009 Time Period: 12 Month Project Cost:11.2 Crore Consultant :Hiren Patel & Architect
12
Client :Raghuvir Exim Limited Project : Construction of Factory Building Laxmipura,Ahmedabad Work Order No.:SCPL/REL/Laxmipura/1 Year:2011 Time Period: 12 Month Project Cost:13.13 Crore Consultant :Parvati Consultant Client :Raghuvir Exim Limited Project : Construction of Factory Building Laxmipura,Ahmedabad Work Order No.:SCPL/REL/Laxmipura/1 Year:2011 Time Period: 12 Month Project Cost:13.13 Crore Consultant :Parvati Consultant
13
Client :Raghuvir Exim Limited Project : Construction of Factory Building Piplaj, Ahmedabad Work Order No.:SCPL/REL/Piplaj /1 & 2 Year:2010 & 11 Time Period: 12 Month Project Cost:13.65 Crore Consultant :Parvati Consultants Client :Raghuvir Exim Limited Project : Construction of Factory Building Piplaj, Ahmedabad Work Order No.:SCPL/REL/Piplaj /1 & 2 Year:2010 & 11 Time Period: 12 Month Project Cost:13.65 Crore Consultant :Parvati Consultants
14
Client :Nishan Electricals (India) Pvt. Ltd. Project : Construction of Factory Building Moraiya, Changodar, Ahmedabad. Work Order No.:SCPL/Nisan/01 Year:2010 Time Period: 14 Month Project Cost:8.92 Crore Consultant :Open Ideas- A’ bad Client :Nishan Electricals (India) Pvt. Ltd. Project : Construction of Factory Building Moraiya, Changodar, Ahmedabad. Work Order No.:SCPL/Nisan/01 Year:2010 Time Period: 14 Month Project Cost:8.92 Crore Consultant :Open Ideas- A’ bad
15
Client :Big Box Containers Pvt. Ltd. Project : Construction of Factory Building Rajoda, Bavla, Ahmedabad. Work Order No.:SCPL/BBCPL/01 Year:2010 Time Period: 9 Month Project Cost:2.06 Crore Consultant :Open Ideas- A’ bad Client :Big Box Containers Pvt. Ltd. Project : Construction of Factory Building Rajoda, Bavla, Ahmedabad. Work Order No.:SCPL/BBCPL/01 Year:2010 Time Period: 9 Month Project Cost:2.06 Crore Consultant :Open Ideas- A’ bad
16
Client :Gujarat State Petroleum Corp. Ltd. Project : Construction of Ware House at Kerela GIDC, Ahmedabad Work Order No.:GPSC/O&G/Construction of Ware House/09-10/122 Year:2010 Time Period: 6 Month Project Cost:3.87 Crore Client :Gujarat State Petroleum Corp. Ltd. Project : Construction of Ware House at Kerela GIDC, Ahmedabad Work Order No.:GPSC/O&G/Construction of Ware House/09-10/122 Year:2010 Time Period: 6 Month Project Cost:3.87 Crore
17
Client :Rudra Sensor Pvt. Ltd. Project : Construction of Factory Building at Vatva GIDC, Ahmedabad Work Order No.:SCPL/RSPL/01 Year:2010 Time Period: 6 Month Project Cost:4.38 Crore Consultant :Open Ideas-A’bad Client :Rudra Sensor Pvt. Ltd. Project : Construction of Factory Building at Vatva GIDC, Ahmedabad Work Order No.:SCPL/RSPL/01 Year:2010 Time Period: 6 Month Project Cost:4.38 Crore Consultant :Open Ideas-A’bad
19
Project Cost:2.18 Crore
20
Project Cost:14.49 Crore Consultant :Open Ideas-A’bad
22
Consultant :Matharoo Associates
24
CONTACT
25
We are interested to be associated with your organization. Let us know in detail regarding your requirement in the field of any type of civil construction works. You are invited to call upon us in person on any day and time convenient to you to express ourselves more and in detail. Looking forward to hear from you. Director Mr. Anil Padmani Thank You,
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.