Columbia School District 2013 Bond Program. I NTRODUCTIONS P ROJECT S COPE R EVIEW P ROJECT T IMELINE A NTICIPATED W ORK C ATEGORIES B IDDING P ROCEDURES.

Similar presentations


Presentation on theme: "Columbia School District 2013 Bond Program. I NTRODUCTIONS P ROJECT S COPE R EVIEW P ROJECT T IMELINE A NTICIPATED W ORK C ATEGORIES B IDDING P ROCEDURES."— Presentation transcript:

1 Columbia School District 2013 Bond Program

2 I NTRODUCTIONS P ROJECT S COPE R EVIEW P ROJECT T IMELINE A NTICIPATED W ORK C ATEGORIES B IDDING P ROCEDURES P ROJECT C ONTACTS

3 P ROJECT S COPE R EVIEW C OLUMBIA I NTERMEDIATE / E LEMENTARY / A LT. E D -A DMINISTRATION R ENOVATION / S ECURE E NTRANCE INT/EL -U PGRADE FINISHES AND REPLACE DOORS / WINDOWS THROUGHOUT INT/EL -U PGRADE B UILDING HVAC AND C ONTROLS -U PGRADE B UILDING L IGHTING, F IRE A LARM, E LECTRICAL -U PGRADE T ECHNOLOGY

4

5

6 P ROJECT S COPE R EVIEW I NTERMEDIATE, E LEMENTARY, A LT. E D S CHOOL (BP 03) -A DMINISTRATION R ENOVATION / S ECURE E NTRANCE -U PGRADE FINISHES AND REPLACE DOORS / WINDOWS THROUGHOUT -R ENOVATE TOILET ROOMS -N EW CASEWORK -U PGRADE B UILDING HVAC AND C ONTROLS -U PGRADE B UILDING L IGHTING, F IRE A LARM, E LECTRICAL -U PGRADE T ECHNOLOGY

7 T IMELINE B ID P ACK 03 (I NTERMEDIATE, E LEMENTARY, A LT. E D ) – B ID D OCUMENTS A VAILABLE W EEK OF F EBRUARY 16, 2015 – B IDS D UE W EEK OF M ARCH 17, 2015 – B ID R EVIEW / P OST B ID I NTERVIEWS TO SUPPORT 3/23/15 AWARDS C ONSTRUCTION – F IRST PHASES AT INT/EL START 3/30/15. – R EMAINING B UILDING S TART A FTER S CHOOL 6/5/15. – A LL WORK S UBSTANTIALLY C OMPLETE F IRST W EEK S EPTEMBER 2015 FOR S CHOOL

8 T IMELINE

9 A NTICIPATED W ORK C ATEGORIES D EMO / A BATEMENT M ASONRY G ENERAL T RADES A LUMINUM / G LASS & G LAZING D RYWALL / A COUSTICAL / P LASTER R ESILIENT F LOORING AND C ARPET H ARD T ILE / T ERRAZZO P AINTING AND C OATINGS L OCKERS P LUMBING /M ECH /HVAC C ONTROLS E LECTRICAL / F IRE A LARM

10 Q UESTIONS & A NSWERS Question: Will there be a local preference for the bids? Answer: No, however the owner has the right to accept or reject any or all offers. Question: Will plans and specifications be available at ABC Reproduction? Answer: Yes. Bid Docs can also be reviewed on Granger FTP site. Question: Will the mechanical package be one package (Plumbing/HVAC) or separate packages? Answer: Separate packages Will this be a prevailing rate job? Answer: Yes Will certified payroll be required? Answer: Yes Will a bid bond be required in the amount of 5% be required? Answer: Yes Will a performance bond be required? Answer: Yes

11 C ONTACT I NFORMATION G RANGER C ONSTRUCTION C OMPANY M ATT L ERG MLERG @ GRANGERCONSTRUCTION. COM D ENISE S TYX DSTYX @ GRANGERCONSTRUCTION. COM W EBSITE HTTP :// RESTORETHESOARWITHGRANGER. COM /


Download ppt "Columbia School District 2013 Bond Program. I NTRODUCTIONS P ROJECT S COPE R EVIEW P ROJECT T IMELINE A NTICIPATED W ORK C ATEGORIES B IDDING P ROCEDURES."