BurrellesLuce MediaContent Portal Work Plan for Fall 2008 Doug Smith
2
MediaContent 2008 - YTD Releases completed this year: 2.5.3: 2/29/2008 2.6: 3/15/2008 2.6.1: 5/9/2008 2.6.2/iMonitor: 8/9/2008 Details on the release contents are on the project web site
3
Release 2.6.2.2 – 8/23 Splash Screen needed for actions taking more than 2 seconds Alert Icon and Alert Name Hover Tag on the headlines page Adding best passage to MediaContent Reuse alert names
4
Release 2.6.3/MM2 - 9/9 New Media Measurement with charting Code is complete Two weeks QA starting Monday 8/18, One week UAT starting 9/2 Go live week of 9/9.
5
Performance Improvements Phase 1 – Dedicated server for incoming traffic 9/7 Phase 2 – Database optimization 9/7 Phase 3 – Improve page load times 9/15
6
MediaConnect 2.6.4 – 9/1 Completes migration of email off the old portal Supplies basic text for PDA and HTML for email Supports up to four addresses per account
7
MediaConnect 2.6.5 – 9/21 Puts tags and autotags into the MM database Nothing user visible, needs additional work to chart with the data.
8
MC 2.6.6 Email time selections Change to preferences page to let users select email frequency Lots of work under the hood and restructure of the email output processor Does not provide ability to handle ad hoc requests through the admin tool
9
MC 2.7 - Clipbook Enhancements Break current clipbook generation into a series of Wizard-like steps Drag and Drop clip reordering Email distribution list management No additional output formats
10
Questions and Closing Doug Smith, MBA, PMP Email: Smith72603@gmail.com Cell: 201.747.9083 IM: dougz00@live.com