Download presentation
Presentation is loading. Please wait.
Published byLauren Perritt Modified over 9 years ago
1
AASHTO TCCE UPDATE 2009 TEA Conference Omaha, Nebraska
2
Members Region 1 – Scott Bickford-Maine – Norie Calvert-MD – Dave Kent- NY – Mike Fowler - VT Region 2 – Greg Davis – FL – Darrell Richardson – GA – Ryan Griffith – KY – Jim Frick – SC
3
Members Region 3 – Roger Bierbaum – IA – Tim Quinn – Minn – Travis Koestner – MO – Jeff Hisem - OH Region 4 – John Riedl – OR – Marie Burke – TX – Jay Drye – WA – Ken Spear - WY
4
Members Chair – Lesly Tribelhorn – MT FHWA – Edwin Okonkwo – DC AASHTO – Keith Platte - DC
5
Members Top Issues 2008 Inflation Forecasting/Market/Material Cost Cost risk analysis Growing funding gap Market consolidation/competition Consistent long range estimates
6
Members Top Issues 2009 Price Volatility Program uncertainty/funding downturn Stimulus projects/MPO issues Software/process implementation Training/estimating procedures/turnover
7
Discussion Topics Caltrans use of Crystal Ball Ohio DOT use of bid analysis and contract administration GAO reports Research in progress A Practical Guidance for Estimating
8
Submitted Research Topics Impacts of Indexes on Highway Const. Contractor Competition – Tools to enhance
9
Update on Manual
10
Chapters Introduction Parametric estimating Risk Based estimating Historical / bid based estimating Cost Based estimating Inflation Forecasting Evaluation Of Bids
11
Future Chapters or Appendix Bidding Strategies Performance Measures for Estimates
12
Research Reviews/Updates NCHRP 8-49 TRB 8-36-72 NCHRP 8-60 MnDOT Project MDT Project Price Indexing – 20-7; task 278 See http://design.transportation.org for linkshttp://design.transportation.org
13
SCOD Strategic Plan Developed and Aligned Tech. Committee On Cost Estimation Goals and Action Plan with the SCOD Plan
14
QUESTIONS?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.