Download presentation
Presentation is loading. Please wait.
Published byDanna Heldreth Modified over 9 years ago
1
Located in Exmoor National Park, with nearby bathing beach 3800 population equivalent (summer) 1900 m 3 /d flow to full treatment Sewage feed started 12th February 1998 Porlock Sewage Treatment Plant Site data
2
Principle of Operation Screened crude sewage Treated & disinfected effluent Air in Waste Sludge (to further treatment) In Out
3
Membrane Filtration Air Bacteria Virus Solids Treated effluent Membrane
4
Porlock Treatment Building Tidal Storage Blowers Permeate Pumps Aeration Tanks 1 - 4 Anoxic recycle Tank 1. 2. 3. 4. Membrane Units Final Effluent out Crude Effluent inlet Fine Screens 3 mm Washing Tank
5
Porlock Aeration Tank MLSS Feb 98 - Sept 99
6
Porlock BOD Removal Feb 98 - Jan 00
7
Porlock NH 3/4 Removal Aug 98 - Apr 99 No ammonia consent No dissolved oxygen control
8
Porlock Faecal Coliforms Feb 98 - Jan 00 Sampling contamination identified Intensive sampling periods
9
Porlock Faecal Coliphage Virus Feb 98 - Jan 00 Change of test procedure
10
Porlock Final Effluent Turbidity Feb - June 1998 Turbidity meter set up incorrectly - readings higher than actual
11
Porlock STW- Compliance Results June 1998 – November 1999 Kubota Submerged Membrane Process