Download presentation
Presentation is loading. Please wait.
Published byCassandra Meyer Modified over 10 years ago
1
Alternatives to Aboveground Effluent Disposal Mounds Overview of the NoMound ® System Technology
2
NoMound ® Presentation Overview Current Status Basic Concept/Underlying Principles Construction Components NoMound ® DN - Denitrification Questions & Answers Contact Information
3
NoMound ® Applicability Newly Patented Technology Used for Effluent Disposal at High Water Table Sites Eliminates Effluent Disposal Mound or Requirement for Site Elevation/Fill Additional Applications Under Development –NoMound ® DN - Denitrification –NoMound ® SW - Stormwater
4
NoMound ® Status US Patents Issued October 1998 Florida Innovative System Approval December 1998 First Installation in Sanford, FL, February 1999 All Florida Innovative System Installations Completed January 2001, Florida Permit System Status Changed to “Engineered Systems”
5
Conditions Required for Onsite Treatment Adequate Hydraulic Retention Time Adequate Biomass and Bioactivity Favorable pH and Temperature
6
NoMound ® Regulatory Justification Controls & Maintains Minimum Separation Distance Required for Treatment
7
Modes of Onsite System Failure Improper Design/ Siting/ Installation Physical/ Mechanical Management/ Maintenance Hydraulic Performance/ Infiltrability
8
NoMound ® Process Benefits Controls Treatment Zone Depth Provides Continuous Aerobic Treatment Zone
9
NoMound ® Provides Installation Flexibility For Septic Tank or ATU Effluent Disposal Can Use Existing Soils Dense Clay and Bedrock Limit Its Use Installed after Construction of Conventional System Works With Any Pressurized Distribution System Can be Used at Residential and Commercial Sites Commercial Sites With High BOD Require Effluent Pretreatment
10
NoMound ® Basic Principle 1 psi air over 144 square inches equals 144 lbs/F 2 2.3 ft 3 water @ 62.4 lbs/ft 3 equals 144 lbs/F 2 1 psi
11
NoMound ® System Components Conventional Septic Tank, Drainfield & Effluent Pump Perimeter Barrier and Cap In-situ Monitoring and Level Controls Control and Alarm System Air Supply Pump (17-watts)
12
NoMound ® Installation, Monitoring, & Maintenance Installers must be NoMound ® Approved System must meet Florida D.O.H. Requirements D.O.H. Inspection is Standard Maintenance same as Conventional System
13
NoMound ® Installation Progress Existing Effluent Disposal Mound
14
Typical NoMound ® Details LEVEL CONTROLS & MONITORING WELL PVC LATERALS
15
NoMound ® Installation Progress Effluent Disposal System with Perimeter Barrier
16
NoMound ® Installation Progress Cap Installation Progress
17
NoMound ® Installation Progress Cap Installation Completion
18
NoMound ® Installation Progress Final Cover Installation and Grading
19
NoMound ® Installation Progress Final Grade
20
Typical NoMound ® Level Controls
21
Typical NoMound ® Monitoring Results
22
Onsite Treatment Processes Chemical Processes –Exchange, Adsorption, Precipitation, & Oxidation/Reduction Biological Processes –Predation, Biotransformation, Morbidity, & Nitrification/Denitrification Physical Processes –Filtration, Settling, Dispersion/Dilution, & Volatilization
23
Typical Effluent Characteristics Total Suspended Solids (TSS) Biodegradable Organics (BOD) Chemically Degradable Organics (COD) Surfactants Bacteria Viruses Nutrients (N,P)
24
Effluent Treatment Process Matrix Physical Chemical Biological TSS BOD COD Bacteria Viruses Surfactants Nutrients
25
Nitrification/ Denitrification Oxidation Reactions –Ammonification Converts Organic Nitrogen to NH 4 –Nitrification Converts NH 4 to NO 3 -N Reduction Reactions –Denitrification Converts NO 3 -N to Nitrogen Gas
26
Conditions Which Promote Denitrification Presence of Consumable Organic Matter Anoxic Conditions Nutrient Source for Bacterial Reactions Low Temperature Variability
27
NoMound ® DN - Concept Design Presence of Organic Nitrogen Present from Secondary or Advanced Treatment Unit Organic Carbon Source Available Reducing Environment - Anoxic Conditions Nitrogen Gas Generated by Denitrification Used to Control Water Table
28
Before NoMound ®
29
After NoMound ®
30
Contact Information for NoMound ® Paul Gruber NoMound OnSite Systems 1038 Frankland Road Tampa, FL 33629 813.251.5856 813.253.2997 (fax) www.nomound.com
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.