1 Evaluation of OSS Nitrogen Removal Technologies Regulatory Round Table Review Series March 11, 2014 Lynn Schneider, Washington Department of Health Office of Shellfish and Water Protection
2
2 $EPA Nutrient NEP Grant Study Partners
3
3 A.Source diversion B.Post-septic tank treatment C.Design of the soil dispersal component (drainfield) Wastewater Nitrogen Management Approaches A B C
4
4 Problems: N reduction in OSS is highly variable Limited treatment options Regional environmental and water source affects on N removal not well-known OSS Nitrogen Removal Project Design Nitrogen In Nitrogen Out Biological System Changes Nitrogen from soluble to gaseous
5
5 Objectives: Maximize N removal efficiencies Verify performance objective (<20 mg/L TN full test avg.) Expand reliable, affordable options OSS Nitrogen Removal Project Design
6
6 Methods: Partner with UW & Ecology to: Use ETV Nutrient Reduction Protocol Develop standards & guidance OSS Nitrogen Removal Project Design
7
7 ETV-Nutrient Reduction Protocol Minimum of 12 consecutive months Daily Design loading 480 gpd (100% + 10% of the rated capacity) 6 AM – 9 AM: ~35% of flow 11 AM – 2 PM: ~25% of flow 5 PM – 8 PM: ~40% of flow Stress Testing (effect of home activities) washday loading working parent low-loading power/equipment failure one week vacation
8
8 ETV-Nutrient Reduction Protocol Sampling Days: Minimum of 12 monthly samples + additional 38 stress day sampling Total 55 data days
9
9 ETV-Nutrient Reduction Protocol Performance Parameters: Total N, NH 3 -N, NOx-N (NO 3 +NO 2 ), Total P, CBOD, COD, TSS/VSS, alkalinity Site Grab for lab: fecal coliform In-situ samples: dissolved oxygen, pH, temperature
10
10 Meters & Probes
11
11 Snoqualmie WWTP Test Site
12
12 Snoqualmie WWTP Test Site w/autosampler locations
13
13 O2O2 O2O2 Organic N NH 4 + NO 2 - NO 3 - N 2 Ammonification Nitrification Denitrification (Aerobic) (Anoxic) Two step process: 1) Nitrification - nitrifies NH 4 + to NO 3 - 2) Denitrification - reduces NO 3 - to nitrogen gas Nitrogen Biochemical Transformations Organic N N2N2 Biological System ALKALI O2O2 C C C
14
14 Nitrification is a two step process: 1.Utilizing bicarbonate alkalinity, Nitrosomonas bacteria will oxidize ammonia to nitrite by NH 4 + + O 2 + HCO 3 - C 5 H 7 O 2 N + NO 3 - + H 2 O + H 2 CO 3 2.Then Nitrobacter bacteria will oxidize nitrite to nitrate mole for mole by NO2 - + NH 4 + + H 2 CO 3 + HCO 3 - + O 2 + C 5 H 7 O 2 N + H 2 O + NO 3 Nitrogen Biochemical Transformations
15
15 Denitrification is a one step process - Note: We used two variations: 1.NO 3 + Woodchips N 2 + OH - + CO 2 + H 2 O 2.NO 3 + BOD from septic tank influent N 2 + OH - + CO 2 + H 2 O Nitrogen Biochemical Transformations
16
16 Vegetated Recirculating Gravel Filter (VRGF) 1 8 Nitrification Denitrification
17
17 VRGF August 2012 June 2013
18
18 VRGF Influent and Effluent Nitrogen Over 12-Month Test Period
19
19 VRGF Influent and Effluent Fecal Coliform Over 12-Month Test Period
20
20 Parameter unitsInfluentEffluent Total Nmg/L48.6 (9.5)15.1 (1.9) NH 3 -Nmg/L29.3 (5.3)4.1 (1.0) NOx-Nmg/L-9.5 (2.1) Org-Nmg/L-1.6 (0.9) BOD/CBOD*mg/L314 (98)5.6 (1.8) TSSmg/L354 (137)3.2 (2.0) VSSmg/L324 (131)2.9 (1.7) COD/SCOD*mg/L715 (223)21.0 (7.2) Total Phosphorusmg/L5.8 (1.3)3.5 (1.1) Fecal Coliform** CFU/100 mL 8.4E+62.3E+5 Alkalinity as CaCO 3 mg/L231 (36)153 (23) pH 7.4 (0.3)6.8 (0.2) Average Performance for VRGF Over 12-Month Test (68.9% TN Removal) *Effluents, **Geometric mean, ( ) is standard deviation
21
21 VRGF Clogging Problem
22
22 Enhanced Recirculating Gravel Filter (ERGF) 1 8 (5) Nitrification Denitrification
23
23 ERGF July 2012 January 2013
24
24 Parameter unitsInfluentEffluent Total Nmg/L48.6 (9.5)8.6 (2.2) NH 3 -Nmg/L29.3 (5.3)6.8 (1.9) NOx-Nmg/L-0.6 (0.6) Org-Nmg/L-1.3 (0.5) BOD/CBOD*mg/L314 (98)8.6 (1.9) TSSmg/L354 (137)5.3 (2.2) VSSmg/L324 (131)4.4 (2.0) COD/SCOD*mg/L715 (223)24.6 (5.7) Total Phosphorusmg/L5.8 (1.3)3.5 (1.4) Fecal Coliform**CFU/100 mL8.4E+64.6E+5 Alkalinity as CaCO 3 mg/L231 (36)203 (27) pH 7.4 (0.3)6.9 (0.2) Average Performance for ERGF Over 12-Month Test (82.3% TN Removal) *Effluents, **Geometric mean, ( ) is standard deviation
25
25 ERGF Influent and Effluent Nitrogen Over 12-Month Test Period
26
26 ERGF Influent and Effluent Fecal Coliform Over 12-Month Test Period
27
27 Recirculating Gravel Filter (RGF) & Woodchip Bed - Two Stage System Nitrification Denitrification 1 6 3 days
28
28 RGF & Woodchip Bed August 2012 June 2013
29
29 RGF & Woodchip Bed July 2012 June 2013
30
30 Parameter unitsInfluentRGF Effluent Average Woodchip Effluent Total Nmg/L48.6 (9.5) 23.9 (5.4)4.0 (3.8) NH 3 -Nmg/L29.3 (5.3) 0.7 (0.4)0.5 (0.5) NOx-Nmg/L- 21 (5.5)2.4 (3.7) Org-Nmg/L- 2.2 (1.2)1.1 (0.3) BOD/CBOD*mg/L314 (97.8) 4.7 (2.6)10.8 (14.1) TSSmg/L354 (137) 10.1 (12.7)2.1 (2.0) VSSmg/L324 (131) 5.8 (5.5)0.9 (2.3) COD/SCOD*mg/L715 (223) 21.6 (5.5)37.6 (20.7) Total Phosphorus mg/L5.8 (1.3) -3.4 (1.9) Fecal Coliform** CFU/100 mL 8.4E+6 1.6E+050.96E+03 Alkalinity as CaCO 3 mg/L231 (36) 84 (28)154 (36.6) pH 7.4 (0.3) 6.8 (0.3)6.6 (0.2) Average Performance for RGF-Woodchip Bed Over 12-Month Test Period *Effluents, **Geometric mean, ( ) is standard deviation (91.8% TN Removal and 960 CFU/100 mL effluent fecal coliform)
31
31 Nitrogen Removal in RGF and Woodchip Bed Over 12-Month Test Period
32
32 Fecal Coliform Removal in RGF and Woodchip Bed Over 12-Month Test Period
33
33 CBOD in RGF and Woodchip Bed Effluents Over 12-Month Test Period
34
34 ParameterUnit Vegetated RGF Enhanced RGF RGF/ Woodchip Bed Total Areaft 2 256180221 Treatment Media Depthft3.5 2.0-RGF 2.8-Woodchip Bed Average Effluent TNmg/L15.1 (18.5)8.6 (12.3)4.0 (13.1) Average TN removal%68.882.391.8 Average Effluent CBODmg/L5.6 (8.2)8.6 (11.22)10.8 (28.9) Geometric mean of Effluent Fecal Coliform CFU/100 mL230,000460,000960 Comparison of the 3 Nitrogen Removal Systems ( ) is 95% Percentile
35
35 1.Webpage posting the ETV Reports summarizing the results from the 3 systems 2.Provide technical support for Hood Canal On-Site Sewage System Nitrogen Reduction (HCOSSNR) demonstration project 3.Complete RS&Gs for the RGF/Woodchip Bed and the VRGF systems Project Outcomes
36
36 UW Civil and Environmental Engineering David Stensel - UWCEE Project Coordinator Michael Brett – UWCEE Project QA Manager Crystal Grinnell – Research Assistant Stephany Wei - Research Assistant Songlin Wang – UWCEE field engineer City of Snoqualmie Wastewater Treatment Plant Tom Holmes - Wastewater Superintendent Lyle Beach - Laboratory Analyst Brian Richardson - Senior Operator Peter Lombardi, Orenco Systems Inc. Dennis Hallahan, Infiltrator Systems Inc. Acknowledgements from Health
37
37 To learn more about the project go to www.doh.wa.gov search for Denitrification Lynn Schneider (360) 236 -3379 Lynn.Schneider@DOH.WA.GOV Washington State Department of Health Office of Shellfish and Water Protection