Download presentation
Presentation is loading. Please wait.
Published byKhalid Beames Modified over 9 years ago
1
Township 9 PROJECT OVERVIEW Capitol Station 65, LLC Township 9
2
Downtown Vicinity Aerial Hwy 160
3
Township 9 Vicinity Map American River
4
Township 9 Land Use Plan 2,500 – 3,000 du Residential Up to 116,000 sf Retail Up to 840,000 sf Commercial
5
Township 9 Illustrative Plan
6
Township 9 Signature Street
7
Township 9 Riverfront Park
8
Township 9 Riverfront Cross Section Riverfront Drive FillLeveeAmerican River
9
Township 9 Project Areas
10
Township 9 Project Areas
11
Township 9 Project Areas
12
Township 9 Project Areas
13
Township 9 Project Areas
14
Township 9 Historical Mitigation
15
Township 9 Historical Mitigation
16
Township 9 Light Rail Station
17
Township 9 Parkways, Paseos & Waterfront
18
Township 9 7 th Street Linear Park Section Plan
19
Township 9 7 th Street Linear Park
20
Township 9 Urban Plazas & Parks
21
Township 9 Urban Park & Park Blvd Park Blvd Urban Park
22
Township 9 Riverfront Plaza
23
Township 9 Waterfront Comparisons Rockefeller Park, New York City Riverfront Park
24
Township 9 Waterfront Comparisons Marina Green, San Francisco Riverfront Park
25
Township 9 Waterfront Comparisons McCall Waterfront Park, Portland Riverfront Park
26
Township 9 Photosimulation from Bike Path Proposed Existing
27
Township 9 Photosimulation from River Proposed Existing
28
Township 9 Visual Impact Mitigation Techniques Building materials that are warm and natural. Glass that has low reflectivity and some transparency. Massing that allows views to penetrate beyond the first city block. Tree plantings that soften the buildings. "Dark Sky" guidelines that reduce intrusive lighting along the waterfront.
29
Township 9 Changes made to address SARA concerns Riverfront Drive realignment (horizontal and vertical) Removal of overlook and pavilion from project description Relocation of monument Building height and massing restrictions near river More native landscaping Participation with county in revegetation plan
30
Township 9 Riverfront Drive American River Overlook Amphitheater Pavilion Monument Riverfront Drive American River Monument Minimum Tower Setback 400’ Previous Plan Current Plan
31
Township 9 American River Riverfront Drive Levee
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.