1 Systems Engineering Breakouts George Angeli

2 Tuesday 11am Current Commissioning Plans – Chuck Claver Revised commissioning timeline Development plans for detailed commissioning activities Middleware Software Demonstration – Dave Mills Overview of the Java / C++ APIs; introduction to salgenerator tools Demonstration of Telemetry, Command/Ack/Response simulator Release schedule 3:30pm Technical Operations Concepts – Chuck Claver Tech Operations Concept Document: scope and outline Specific areas of detailed development Exploiting PhoSim for DM Algorithm Development – Chris Walter Simulating sensor effects Algorithms to correct for them

3 Wednesday 11am Integrated System Database – Andy Connolly Requirements for the integrated systems database and use cases Prototype schema and design of the database Discussion of the design, needs and implementation plan 1:30pm System Performance Metrics/Status – George Angeli Overview and IQ budget IQ Simulation status Throughput budget & estimates 3:30pm Modeling the Cerro Pachon Sky – Chuck Claver Review of current assets running on Cerro Pachon Summary of Visible All Sky Camera data analysis What is needed by simulations and how do we get there? Verification and Compliance Matrices – Brian Selvy LSST V&V Process (LSE-160) review V&V Implementation methodology in SysML Overview of Verification Compliance Spreadsheets

4 Thursday 11am Visualization Tools, Project-Wide Standards – Gregory Dubois- Felsmann Data visualization needs Visualization tool standards PhoSim Science Applications – John Peterson 1:30pm OpSim Schedule and Development – Andy Connolly 3:30pm Using PhoSim to help with LSST Construction – John Peterson Technical status update of phosim by myself Using phosim in system engineering Verification of PhoSim with prototype sensor data Operational Configuration – Paul Lotz System-wide approach for configuring software components Commands, keys, databases