Presentation is loading. Please wait.

Presentation is loading. Please wait.

WPC Proposed Way Forward Option C: Other options in Wadestown/Wilton Presentation to WPC 4 November 2013 Sue Myhill and Janet Mackay.

Similar presentations


Presentation on theme: "WPC Proposed Way Forward Option C: Other options in Wadestown/Wilton Presentation to WPC 4 November 2013 Sue Myhill and Janet Mackay."— Presentation transcript:

1 WPC Proposed Way Forward Option C: Other options in Wadestown/Wilton Presentation to WPC 4 November 2013 Sue Myhill and Janet Mackay

2

3

4 Assumptions That, at least for the time being, we keep the current WPC Church Hall WPC has enough funds to sustain a Minister Idea of ‘collaboration’ rather than a strict lease Kitchen, toilets, some parking, accessible

5 What we decided not to pursue….. Wilton Bowling Club Wadestown School Wadestown Community Centre

6 What we did decide to pursue….. St Lukes Wadestown Wadestown Library St Thomas More

7

8 200m

9 St Lukes Wadestown - Pros Closeness to current location Brick Church building Shared history/existing collaboration Existing relationships with congregation members “Non-competitive” Sharing of resources/upkeep of premises

10 St Lukes Wadestown - Cons Brick church building Parking Not just a hire – concept of ‘whare-nui’ Timing – St Lukes’ existing uses How difficult sharing (and interdenominational sharing) can be

11

12 200m

13 Wadestown Library- Pros Location/visibility Parking Accessibility Multi-functional space/’non-threatening’ All one-level Low maintenance building

14 Wadestown Library- Cons Unknowns – timing/availability/costs Council ownership on council land No separate rooms for breakout Small kitchenette/toilets outside – Unknown costs to adapt

15

16 200m

17 St Thomas More- Pros Parking Flat access Has separate lounge area and kitchen Three small rooms Going through a similar process to WPC Their parish is keen to see their building used by another group for a similar purpose The are keen to continue conversation

18 St Thomas More - Cons We may have no say – the Diocese is determining the process Unknown costs for purchase etc. Building at approx. 46% of code Another denomination’s church Timeframe – not until April 2014 for decision

19 Option C Recommendation/s Given the information that we currently have……. St Thomas More


Download ppt "WPC Proposed Way Forward Option C: Other options in Wadestown/Wilton Presentation to WPC 4 November 2013 Sue Myhill and Janet Mackay."

Similar presentations


Ads by Google