Goodwood Property Owners’ Association
Change to Neighborhood Streets Request
2
Committee Members Laurence Lambert, P.E., PTOE (chair) Betsey Tramonte
Ben Laurie, P.E. Mike Cullen, P.E. Paul Higgins Fritz Embaugh Dennis Vidrine, GPOA President Haley Blakeman, RLA (ex-officio)
3
Goals Maintain quality of life Enhance safety
Increase pedestrian / bike use Adhere to City / Parish standards
4
Strategies Look at the GPOA boundary in traffic districts
Have balanced representation on the committee Use the Traffic Engineering Department as a resource for feasibility Use FutureBR as a reference for recommendations
5
GPOA Traffic Districts
6
Toolbox Partial street closures
Convert two-way streets to one-way with bike lanes / shoulders Speed humps STOP signs
7
Partial Street Closure
8
Partial Street Closure
9
Speed Hump
10
One-Way Signage
11
One-way bike lane / shoulder
12
District 1 Solutions Limit access from Florida Avenue to Government Street at heaviest cut-through streets (Cloud, S. Carrollton and Kenwood) Employ the use of partial closures at intersections with Florida to maintain two-way residential access while restricting through traffic Install STOP signs and speed hump at key locations
13
District 1 Solutions Proposed All-Way STOP Sign Existing Speed Humps
Existing One Way Proposed Partial Closure Proposed Speed Humps
14
District 2 Solutions STOP signs
LaSalle Avenue at LaSalle Parc Drive / Carter Avenue LaSalle Avenue and Cyril Avenue Speed humps Carter Avenue Shawn Drive Normandy Drive Cyril Avenue
15
District 2 Solutions Speed Hump Proposed STOP Sign Existing STOP Sign
16
District 3 Solutions Thibodeaux Avenue and Finchley Avenue: one- way streets towards Jefferson Highway. Partial one way couplet with Keed Avenue and Audubon Avenue. Maintain two-way from Annabelle Avenue to Jefferson Highway to maintain access to businesses. Maintain two-way from Goodwood Blvd to Government Street to maintain access to residences on the end of the street.
17
District 3 Solutions Proposed Sidewalk Proposed One Way
Existing Two-Way
18
Overall Plan
19
Path to Implementation
Committee Board City Review Membership / Neighborhood Temporary Installation (test period) Permanent Installation (if approved)
20
Survey Results Over 1,700 open house invitations mailed to every resident within GPOA boundaries (this included members and non-members) Hundreds of people attended open house on 02/16/14 GPOA Membership Meeting attended by hundreds of people on 03/18/14 Results about the plan from both meetings 86% Positive 6% Neutral 8% Negative
21
Schedule Open House: February 16
Traffic Committee Meeting: February 20 General Membership: March 18 Temporary Installation: November 04 Evaluation Period End: January 30 (3 Months) Permanent installation (if approved): Spring 2015