Download presentation
Presentation is loading. Please wait.
Published byDesmond Gaunt Modified over 9 years ago
1
Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. High-rise Pack Loading
2
At the half way point, drop down and begin the second tier.
3
Female coupling should end up toward the brass holder side.
4
Accordion fold half of hose complement. Drop down and fold the balance. Last section of hose is stacked with female coupling left out.
5
Cover is pulled into place, on top of pack.
6
Velcro ring on end straps is placed at corner of pack Belts are secured around pack. Tails secure to Velcro around pack.
7
Velcro ring on end of straps is placed at corner of pack. Strap is tensioned while holding thumb on strap and using buckle as a jack. Pull strap tight and re-jack if necessary until desired tightness is achieved.
8
The Gated-wye can be pre-connected. Secured by passing one of the black webs loops through the wye then through the other black web. Anchor with the yellow web-Velcro. Securing the Gated-Wye
9
The wye can be secured to the pack by itself. Passing the black webs through the wye and then securing with the yellow web- Velcro. To release, rip away the Velcro and pull the Wye loose.
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.