Presentation is loading. Please wait.

Presentation is loading. Please wait.

Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. High-rise Pack Loading.

Similar presentations


Presentation on theme: "Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. High-rise Pack Loading."— Presentation transcript:

1 Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. High-rise Pack Loading

2 At the half way point, drop down and begin the second tier.

3 Female coupling should end up toward the brass holder side.

4 Accordion fold half of hose complement. Drop down and fold the balance. Last section of hose is stacked with female coupling left out.

5 Cover is pulled into place, on top of pack.

6 Velcro ring on end straps is placed at corner of pack Belts are secured around pack. Tails secure to Velcro around pack.

7 Velcro ring on end of straps is placed at corner of pack. Strap is tensioned while holding thumb on strap and using buckle as a jack. Pull strap tight and re-jack if necessary until desired tightness is achieved.

8 The Gated-wye can be pre-connected. Secured by passing one of the black webs loops through the wye then through the other black web. Anchor with the yellow web-Velcro. Securing the Gated-Wye

9 The wye can be secured to the pack by itself. Passing the black webs through the wye and then securing with the yellow web- Velcro. To release, rip away the Velcro and pull the Wye loose.


Download ppt "Place nozzle on hose and fold over about 4 to 6 inches past each end of pack. High-rise Pack Loading."

Similar presentations


Ads by Google