Download presentation
Presentation is loading. Please wait.
Published byBlanca Tirrell Modified over 9 years ago
1
RAJASTHAN STATE ROAD DEVELOPMENT AND CONSTRUCTIONS CORPORATION LTD. JAIPUR PRESENTATION ON PREPARATION OF DPR FOR PALI(RAMASIYA) –SOMESAR - BUSI- NADOL (SH67) – DESURI – GOMTI (SH16) ROAD DEVELOPMENT ON ANNUAITY MODEL
2
Here comes your footer Page 2 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
3
Here comes your footer Page 3 NECESSITY Improved connectivity Development of the surroundings A boost to tourist Golden Triangle of Rajasthan – Jodhpur to Udaipur Shorter connection for Jodhpur with Udaipur PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
4
Here comes your footer Page 4 LENGTH (Km) Total Length of main Link is 91.450 Km Details of Proposed Bypasses Given below, S.NoVillage Name Length of Bypass (m) 1Sonai Maji2225 2Bussi1875 3Devli2875 4Kharda970 5Nadol4800 6Desuri4800 Total (Km)17.545 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
5
Here comes your footer Page 5 SCOPE Preparation of Detailed Project Report -Site reconnaissance -Road Inventory -Pavement Condition -Soil Investigation -Topographical Survey -Improvement Proposal -Finalization of Bypass Alignment -Detailed Design of Geometrics, Pavement & Structures -Detailed design of Road Appurtenances -Preparation of BOQ -Calculation of Annuity PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
6
Here comes your footer Page 6 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) EXISTING WIDTH ROAD SECTIONS LENGTH (KM) EXISTING WIDTHREMARK RAMASYA-DESURI (Km 0/0 - Km 64/100) 64.000 3.7M CARRIAGEWAY WITH GRAVEL SHOULDER Widen upto 2-Lane with Paved Shoulder DESURI-GOMTI (Km 64/100 - Km 91/450) 27.350 5.5M CARRIAGEWAY WITH GRAVEL SHOULDER Widen upto 2-Lane with Paved Shoulder PRESENT STATUS
7
Here comes your footer Page 7 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) SNVillage NameProposed Chainage (Km) StartEnd 1Hemawas2+3503+400 2Sonai Maji7+5008+600 3Gurnarkar12+200 4Sodawas13+30014+900 5Tawali17+900190+00 6Busi21+10023+000 7Somesar27+10028+300 8Dudhariya29+300 9Devli38+80040+200 10Kharda41+40042+400 11Nadol47+00049+600 12Narlai58+28060+400 13Dessuri64+10067200 14Gomti89+50091+450 VILLAGES ENROUTE PRESENT STATUS
8
Here comes your footer Page 8 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) CEMENT CONCRETE ROAD SN Chainage Length Type of Widening Widening Side Remarks FromTo 17+8207+980160ConcentricBothCC Road 28+1308+550420ConcentricBothCC Road 313+57013+830260ConcentricBothCC Road 422+14022+870730ConcentricBothCC Road 548+10548+594489ConcentricBothCC Road 648+75548+995240ConcentricBothCC Road PRESENT STATUS
9
Here comes your footer Page 9 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) EXISTING CRUST SNSH Chainag e Pit No. Side PavementShoulder PMC PMC Old BMWBMGSB Soil 1 67 301R25 65420270 2352R80 125215175 3553L25 80380280 4454L20 5085310210 5405L25 3065385320 6506L20 30+2080210200 PRESENT STATUS
10
Here comes your footer Page 10 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) STRUCTURES S No.TypeLengthNos.Proposed 1CausewayUp to 10m10Replaced 2Causeway10 to 20m5Replaced 3Causeway20 to 30m9Replaced 4CausewayMore than 30m9Replaced S No. TypeLengthNos.Proposed 1Pipe Culvert0.600-1.20m Dia384 Retain and 34 Reconstruction 2Slab Culvert0.5m to 2.0m7426 Retain and 48 Reconstruction Causeway Culverts PRESENT STATUS
11
Here comes your footer Page 11 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) S No Chainage (Km) Existing Structure ConditionsRemarks Type Total Length (m) Width (m) 158+550Slab6.0 GoodRetain 263+165Slab6.07.5GoodRetain 3281+172Slab28.07.7GoodRetain 4285+732Slab12.611.3PoorReplace 5286+091Slab6.011.0PoorReplace 6286+225Slab12.27.6FairRetain 7286+428Slab8.07.5PoorReplace 8286+577Slab7.422.0GoodRetain 9287+742Slab7.015.5PoorReplace 10293+620Slab7.511.0PoorReplace 11296+068 Arch Bridge 12.011.5PoorReplace Minor Bridges PRESENT STATUS
12
Here comes your footer Page 12 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Major Bridges Sno. Chainage (Km) Existing Structure Conditi ons Remarks Type Total Length (m) Width (m) 170+040Slab88.48.3FairRetain Major Bridge at Chainage 70+040Minor Bridge at Chainage 281+172 PRESENT STATUS
13
Here comes your footer Page 13 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Ch. DeflectionMSABM (Overlay)WMMDBM/BC 1.252012018084 Proposed (Overlay)DBMBCPCC (<120)PCC (>120) Th.(mm)5040DBMWMM New CrustCBR (Assumed)MSADesign Yr. 7%20 New Crust Thicknesses GSB WMMDBMBC 230 2505040 ESTIMATED OVERLAY PROPOSED DEVELOPEMENT
14
Here comes your footer Page 14 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) LIST OF REPLACED BRIDGES S. no. Existing Chainage (Km) Proposed Chainage (Km) Proposed Structure TypeSpan (m) Total Length (m) Width (m) 1285+73272+470Box Bridge1.08.0 12.9 2286+09172+853Box Bridge1.06.0 12.9 3286+42873+214Box Bridge1.08.0 12.9 4287+74274+506Box Bridge1.08.0 12.9 5293+62080+375Box Bridge1.08.0 12.9 6296+06882+825Box Bridge2.06.012.012.9 PROPOSED DEVELOPEMENT
15
Here comes your footer Page 15 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) S.NoVillage Name Chainage Length of Bypass Remarks FromTo 1Sonai Maji6+9809+0402225Left 2Bussi21+48023+5501875Right 3Devli38+05040+9602875Right 4Kharda41+90042+900970Left-Right 5Nadol46+37551+9304800Left 6Desuri64+27567+7004800Left PROPOSED BYPASS PROPOSED DEVELOPEMENT
16
Here comes your footer Page 16 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) Project Cost – 174 Cr. (Mainline 121 Cr. + Bypasses 29 Cr. + Str. 24 Cr.) Construction Period – 2 Years Concession Period – 20 Years Annuity -
17
Here comes your footer Page 17 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
18
Here comes your footer Page 18 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) RAILWAY CROSSING & ROB A Broad Gauge Railway Track Crosses the Project Corridor at Chainage Km 28+555 near Somesar Village. No ROB has been Proposed along this Road.
19
Here comes your footer PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
20
Here comes your footer Page 20 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16) DATE OF SUBMISSION OF DPR
21
Here comes your footer LIKELY DATE OF START OF WORK Page 21 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
22
Here comes your footer TAKE OFF STARTING AT RAMASIYA, KM 29+000TAKING OFF FROM NH14, KM 115+000 Page 22 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
23
Here comes your footer CANAL CROSSINGREALIGNMENT PROPOSED ON RIGHT Page 23 SHARP CURVE PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
24
Here comes your footer FIRST VILLAGE ON THE ALIGNMENT- HEMAWAS EARTHEN BUND ON LEFTHABITATIONON RIGHT SIDE ONLY Page 24 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
25
Here comes your footer BYPASS CANDIDATE – SONAI MAJI CONJETION INSIDEEARTHEN BUND ON RIGHT Page 25 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
26
Here comes your footer BYPASS CANDIDATE –VILLAGE SODAWAS VILLAGE SODAWASJUST FIT FOR 10M Page 26 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
27
Here comes your footer BYPASS CANDIDATE – VILLAGE BUSSI VILLAGE BUSSI – BYPASS CANDIDATEVILLAGE BUSSI – FROM INSIDE Page 27 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
28
Here comes your footer DANGEROUS CURVE Starting chainage at 69+000 End chainage at 77+000 Page 28 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
29
Here comes your footer INDEX MAP Page 29 PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
30
Here comes your footer Page 30 THANK YOU PALI (RAMASYA)-GOMTI ROAD (SH-67,SH-16)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.