2
With the passage of the May 2009 NLISD Bond Election, campuses made improvements and repairs. New flooring in the elementary schools, updated kitchen equipment campus- wide, resurfacing of the high school parking lot, roof repairs at Stone Middle School.
3
Rock was added to the south wing of Aaron Parker Elementary. Wood siding Matching stone
4
The $4.16 million designated for new construction enabled the North Lamar High School to meet the new ‘4x4’ curriculum requirements by adding additional science and computer labs.
5
NLISD maintenance crew, directed by Tommy Funderburg, moved the fiber optic cable.
6
Our technology team, directed by Glenda Parson, got the connections back up and working. These two teams saved the district some construction costs.
7
Construction equipment moved on sight 11/09/09. Prior to this start date the canopy from the high school to the special education building was removed and the grounds surrounding the site were prepared for the construction.
9
Site work begins
10
Trench for Fiber Optic
13
Drilled Pier
16
Science Lab Grade Beam
18
Computer Lab Grade Beam
19
Soil Retainer
20
Steel Beams
23
Plumbing Begins
24
Steel Construction
25
Snow!
26
Under Floor Piping Insulation
27
Under Floor Electrical
28
Steel Floor Decking
29
Floor Mesh
30
First Floor Slab
32
First Floor Above Slab Plumbing
33
Second Floor Concrete Slab
42
HVAC Duct Work
44
Interior Wall
46
Science Storage Area
47
Classroom
48
Science Classroom
49
New Wallway
54
Science Lab
68
Teachers first to use new computer labs.